11
HPD DESIGN HPD DESIGN
GUIDELINESGUIDELINES
forfor
NEW CONSTRUCTIONNEW CONSTRUCTION
Version 2.01
The New York City Department of Housing Preservation and Development (HPD) does not guarantee,
warrant, or make representations that the information in this document is complete, accurate, or
current. HPD assumes no responsibility for the application of the material or information contained
herein nor for any error, omissions, or other discrepancies. Nothing in the document is intended to
create nor does it create any enforceable rights, remedies, entitlements, or obligations. HPD reserves
the right to change or suspend any or all parts of this document without notice. The designer of
record is responsible to ensure a project is designed in a manner to comply with the applicable
laws, regulations, codes, and design standards including, but not limited to, those related to non-
discrimination.
The illustrations included within the
HPD Design Guidelines for New Construction
are intended merely
to assist in navigating the various requirements and design standards; to aid staff during the plan
review for projects participating in HPD programs and activities; and to add clarity and transparency to
designers responding to HPD’s Design Review comments. This document is not meant to offer a design
template, but rather to document and illustrate some of the design controls and potential outcomes.
Disclaimer
This document is issued by the New York City Department of Housing Preservation and Development
(HPD), also referred to in this document as “the Agency” and was developed within the HPD Office
of Development’s Division of Building and Land Development Services (BLDS). This document, the
HPD Design Guidelines for New Construction
(“the
Guidelines”
) supersedes both the
HPD Design
Guidelines for New Construction and Senior Housing
issued May 2016 and the
HPD Design Guidelines
for Supportive Housing
issued February 2012.
This update not only consolidates previous guidelines, it also describes HPD BLDS procedures, reflects
HPD Program requirements, and clarifies elements of the prior guidelines. Unlike previous guidelines,
this document is an incremental update designed to keep current with practice and external requirements.
This update to the
HPD Design Guidelines for New Construction
is the product of internal evaluations
and community feedback and would not have been possible without the help of numerous individuals
and organizations. In particular, HPD would like to thank the New York State Association for Affordable
Housing (NYSAFAH), the Supportive Housing Network of New York (SHNNY), Kinetic Communities
Consulting, Taitem Engineering, Steven Winter Associates, Ettinger Engineering, the Citizens Housing
and Planning Council (CHPC), the New York City Housing Development Corporation (HDC), the
American Institute of Architects (AIA) New York Chapter, and our key sister city agencies including
the Mayor’s Office of Climate and Environmental Justice (MOCEJ) and the Office of Management
and Budget’s Climate Programs and Policy Team (OMB) for their contributions to this document and
previous versions upon which it is based. Any errors or omissions are the sole responsibility of HPD.
Preface
Special ThanksSpecial Thanks
33
SECTION 1 / Introduction 4
SECTION 2 / Intention of the Design Guidelines 4
SECTION 3 / BLDS Design Consultation & Review 6
SECTION 1 / Core Sustainability Standards 11
SECTION 2 / Resiliency 12
SECTION 3 / Heating, Ventilation, and Air Conditioning 16
SECTION 4 / Energy Efficiency and Envelope 23
SECTION 5 / Health and Wellness 25
SECTION 6 / Accessibility and Age-Friendly Design 27
SECTION 7 / Broadband 29
SECTION 8 / Building Operations 31
SECTION 9 / Commercial & Retail Spaces 31
SECTION 1 / Site Planning 33
SECTION 2 / Building Exterior 33
SECTION 3 / Outdoor Spaces 34
SECTION 4 / Building Planning 35
SECTION 5 / Apartment Planning 39
SECTION 1 / Homeownership 62
SECTION 2 / 1-3 Family Homes 62
SECTION 3 / Supportive Housing 63
SECTION 4 / Senior Housing 64
SECTION 5 / Inclusionary Housing Program Requirements 66
SECTION 6 / Inclusionary Housing Design Requirements 67
Appendix 1 / HPD BLDS New Construction Design Consultation 72
Submission Checklist
Appendix 2 / HPD BLDS New Construction Design Review 74
Submission Checklist
Table of ContentsTable of Contents
GENERAL GENERAL
REQUIREMENTSREQUIREMENTS
INTRODUCTIONINTRODUCTIONDESIGN DESIGN
REQUIREMENTSREQUIREMENTS
CHAPTER 3CHAPTER 3CHAPTER 4CHAPTER 4CHAPTER 5CHAPTER 5 CHAPTER 2CHAPTER 2 CHAPTER 1CHAPTER 1
PROGRAM PROGRAM
REQUIREMENTSREQUIREMENTS
APPENDICESAPPENDICES
44
The New York City Department of Housing Preservation and Development (HPD) Office of
Development’s Division of Building and Land Development Services (BLDS) has issued
the
HPD Design Guidelines for New Construction
for HPD-assisted multifamily new
construction, supportive, and senior housing projects, and they may also be used to guide
the design of 1-3 family homes. Projects participating in the Inclusionary Housing incentive
programs (either MIH or VIH) that are not subsidized through any HPD Loan Programs shall
not be subject to the
Guidelines
, but are subject to HPD review of zoning and accessibility
requirements. Projects receiving 421-a tax credits only are not subject to HPD Design
Review. Design Review to ensure compliance with the requirements of the
Guidelines
is a
prerequisite to loan closing for any new construction projects developed under applicable
HPD loan programs.
HPD seeks to support projects that meet several core principles. Projects should: have a
strong relation to the neighborhood (urban design and building planning), meet the needs
of households and individuals (apartment planning and accessible design), promote greater
equitability and health outcomes, encourage active design, utilize sustainable or renewable
products and promote energy efficiency, and select sustainable features that can potentially
reduce operating costs.
The
HPD Design Guidelines for New Construction
establishes the design criteria by which
BLDS and others in HPD will evaluate proposed developments upon application to HPD for
financial assistance. The Guidelines represent an effort to meet housing demand, respond
to market changes, and contain costs, and are intended to apply to HPD-assisted housing
developments across a variety of conditions.
The Guidelines are a policy document intended to establish a minimum design standard that
may exceed what would otherwise be required. Pertinent laws, rules, regulations, and codes
take precedence over the Guidelines in event of a conflict. Furthermore, HPD recognizes
that the Guidelines cannot address all development scenarios. When unique or special
circumstances, extraordinary market conditions, or special community characteristics
necessitate deviation from any aspect of the Guidelines, the development team must consult
with the applicable loan program and notify BLDS, in writing, in advance of the first design
submission. Submissions must identify known areas of non-compliance and explain project
constraints and the rationale behind design decisions.
SECTION 1 / SECTION 1 / INTRODUCTIONINTRODUCTION
SECTION 2 / SECTION 2 / INTENTION OF THE DESIGN GUIDELINESINTENTION OF THE DESIGN GUIDELINES
55
The following chapters address a specific set of goals or standards that HPD has established
as a baseline for projects to meet. These are referred to as Requirements. Each section
also contains “Reach” criteria which all development teams are encouraged to meet, as they
represent best practices and set a precedent for future baseline standards. Note that certain
Requirements may be waived by HPD if they are demonstrated to be infeasible.
2.1 Requirement vs. Reach At a minimum, all projects must comply with the
requirements for their project type or Program. However, projects are encouraged to
explore the feasibility of the “Reach” goals, as they set a precedent for future Requirements:
Requirements are mandatory for all projects. In some cases, there are different
requirements for different Programs or unique populations.
Reach criteria are optional but represent best practices for the specific criteria area.
These criteria may become mandatory in the future. Projects may choose individual
Reach criteria or follow a Reach Third-Party Certification, which covers many criteria.
2.2 Design Waivers Certain deviations from the baseline requirements will be considered
via a Design Waiver Request if necessary to avoid costly structural changes or tenant
hardship or if they result in a superior design solution. Evaluations of waiver requests will
include the determinations of the appropriateness of the proposed alternative(s). Waiver
requests will be reviewed on a case-by-case basis and determinations will be based on the
degree of:
technical infeasibility
financial infeasibility - including cost-effectiveness, availability of incentives,
impacts on operating costs, or if criteria would cause project to be reclassified (e.g.
a Mod Rehab to a Sub Rehab where project cannot support the additional costs)
impact on the residents, including whether it would result in higher tenant-borne
utility costs or would require tenant relocation during construction that is not
otherwise required
inability of the system to comply with HPD’s Electric Heating Policies
All waiver requests must be submitted via the Design Waiver Request Form for review and
determination by HPD prior to Design Consultation.
Every time you see an
orange bubble, it will
signify that a Design
Waiver is available!
Design Waivers
must be approved by
HPD prior to Design
Consultation.
66
All drawings and documents submitted to BLDS by the development team must be submitted
digitally through eBLDS, which is the system for storing, coordinating, and transferring
these documents. eBLDS is a suite of tools comprising an internal user interface, database
(Sharepoint), email (Outlook), and third-party file transfer system. Internal digital reviews
are conducted using Bluebeam Revu software. An eBLDS ‘gatekeeper’ within BLDS monitors
the system and submissions.
All project intakes for BLDS Design Consultation and BLDS Design Review are initiated
through HPD Program. The eBLDS system automatically sends messages when the project
status changes; statuses include ‘Awaiting Electronic Submission’, ‘Pending Review’, ‘In
Review’, ‘Awaiting Resubmission’, and ‘Design Acceptance’, among others. The system
correspondence outlines next steps for the development team, including submission
requirements.
The first phase of design review for all HPD-funded projects is the Design Consultation,
a virtual meeting between HPD Program, BLDS, and members of the development team
(including but not limited to the architect, owner, and sponsor). Projects submitting for
Design Consultation should have sufficiently resolved designs (well into the design
development phase) that have been coordinated among trades (architectural, MEP,
structural, etc.) as necessary. In advance of submission, the development team must also
coordinate the Dwelling Unit count and distribution with HPD Program to ensure compliance
with Term Sheets. The Design Consultation will not be scheduled until all materials have
been received by HPD and the project moved to ‘Pending’ status. Upon receiving a complete
design submission, BLDS will begin to review the submitted materials and schedule a date
for the Design Consultation with the development team through the HPD Program project
manager. HPD will send an invitation to the virtual meeting.
At the Design Consultation, HPD will present its findings on matters relating to the design
and planning of the proposed development; including compliance with the HPD Design
Guidelines for New Construction, HPD sustainability and resiliency goals, opportunities for
cost containment, and program requirements. Design Consultations also provide guidance
to the development team regarding applicable laws, rules, codes, and regulations, including
the New York City Building Code, New York City Zoning Resolution, New York City Housing
Maintenance Code, New York State Multiple Dwelling Law, the Fair Housing Act, Section
504 of the Rehabilitation Act of 1973, and the Americans with Disabilities Act. The Design
Consultation is both an initial design review and an opportunity for the various entities
involved in an affordable housing development project to ensure that the priorities of the
project align with the goals of all involved.
BLDS will issue a Summary of comments outlining topics for coordination between the
development team and HPD Program and specifying necessary revisions to achieve Design
Acceptance.
SECTION 3 / SECTION 3 / BLDS DESIGN CONSULTATION & REVIEWBLDS DESIGN CONSULTATION & REVIEW
eBLDSeBLDS
DESIGN CONSULTATIONDESIGN CONSULTATION
Projects participating
in an Inclusionary
Housing program but
not otherwise funded
or assisted by HPD
are not required to
participate in the
Design Consultation
process
77
After the Design Consultation, the project will be identified for one of three review tracks:
Full Design Review, Targeted Design Review, or Expedited Design Review.
FULL DESIGN REVIEW
Projects identified for Full Design Review will receive a new project intake through eBLDS
for BLDS Design Review. After receipt of a complete design review package, BLDS will
review the material and provide comments similar in scope and form to the feedback from
a Design Consultation. Once the review is completed, it will be returned to the development
team through eBLDS, and must then be resubmitted for BLDS Design Review until it receives
a Design Acceptance.
Projects selected for Full Design Review are expected to achieve ‘Design Acceptance’ by
the third review. If a project exceeds three rounds, BLDS and/or HPD Program may call a
meeting to resolve outstanding issues. In some cases, such meetings may occur earlier in
the process to resolve persistent or complex issues in a project identified during the Design
Review process.
TARGETED DESIGN REVIEW
At the discretion of HPD/BLDS, a Targeted Design Review track may be available for projects
whose design teams include a specialized accessibility consultant. In a Targeted Review,
BLDS will provide comments relating to compliance with the HPD Design Guidelines for New
Construction, but BLDS will not provide additional feedback related to accessibility after
the Design Consultation. In such cases, the development team will be expected to comply
with the comments outlined in the Design Consultation Memo, and the development team
retains responsibility to ensure that the buildings’ design and construction comply with all
laws, rules, regulations, and codes mandated by city, state, and federal authorities having
jurisdiction. Projects selected for a Targeted Design Review will remain eligible for a Full
Design Review upon request by the development team.
EXPEDITED DESIGN REVIEW
Upon completion of Design Consultation, some projects may be selected for an Expedited
Design Review if the required design changes are sufficiently minimal. The project team will
receive a deadline to resubmit with the required changes, and the project will receive Design
Acceptance if the development team complied with the comments outlined in the Design
Consultation Memo in a timely manner. Projects selected for an Expedited Design Review
will remain eligible for a Full Design Review upon request by the development team.
Threshold: In order to be considered for Expedited Design Review, a project must meet the
following criteria:
a. Only projects on privately-owned sites will be eligible for Expedited Design Review.
b. Only projects whose architects have received BLDS Design Acceptance for a New
Construction project in the previous three years will be eligible for Expedited Design Review.
DESIGN REVIEWDESIGN REVIEW
all projects, including
those only participating
in an Inclusionary
Housing program,
must submit a record
set for review
88
ENVIRONMENTAL REVIEWENVIRONMENTAL REVIEW DESIGN REVIEWDESIGN REVIEWTIMELINETIMELINE
Competitive: Projects meeting certain criteria will be more likely to qualify for Expedited
Design Review, including projects that:
a. conform to term sheet requirements for unit mix
b. have an Accessibility Consultant as part of the design team
c. have a developer who has closed on an HPD New Construction project in the previous
five years
Any projects whose unit designs change substantially after receiving HPB BLDS Design
Acceptance (and before project closing) must initiate and submit a design submission
for a BLDS PAA Review, clearly indicating the scope of changes visually and verbally, and
describing the reasons for the changes. Full submission requirements are outlined in the
BLDS PAA Submission Checklist.
Environmental Review is a policy-mandated process that requires governmental agencies
undertaking discretionary actions and approvals (such as construction financing, ULURP
approvals, or Article XI tax exemptions from City Council) to consider the impacts to the
environment that those actions may have, and to disclose those impacts to the public. Most
projects HPD finances involve discretionary actions, the notable exceptions being projects
solely funded through 421-a or Inclusionary Housing-only projects. BLDS Environmental
Planning Unit manages the review process for most HPD-funded projects, securing
compliance with a wide array of local, state, and federal environmental regulations.
BLDS Environmental Review process has to integrate many different regulatory frameworks,
so the level and complexity of Environmental Review can vary dramatically based on the
specific nature of the project being financed.
A list of submission requirements will be sent to the development team from the automated
system after the project has been initiated. Submissions must include all materials from the
checklist, submitted in a PDF not to exceed 50 megabytes (MB). Incomplete submissions will
be returned without review and must be resubmitted.
Design Consultation submissions should be received by HPD approximately 9 months ahead
of the project’s anticipated closing (plus or minus 2 months). Design submissions for design
review should be submitted after the Design Consultation and not before all comments from
the Design Consultation have been satisfactorily addressed.
SUBMISSION SUBMISSION
REQUIREMENTESREQUIREMENTES
POSTPOST
--
ACCEPTANCE ACCEPTANCE
AMENDMENT (PAA) AMENDMENT (PAA)
REVIEWREVIEW
99
BLDS REVIEW TIMELINEBLDS REVIEW TIMELINE
Submission Milestones Prior to Closing
* These bars represent the range of time during which a review may be submitted and a
review conducted. Project review is not intended to fill the entire range from beginning to end.
Projects receiving Expedited Review will submit an amended set after Design Consultation,
but will not participate in further rounds of Design Review.
** Note that if Environmental Assessment reveals adverse findings, the Environmental Review
process will require 1 year minimum to complete.
Notes:
1. The goal is to achieve BLDS Design Acceptance at least one month ahead of anticipated closing.
2. BLDS recommends submission to DOB after Design Consultation comments have been
issued and addressed. However, the development team remains responsible for securing DOB
approval independent of the HPD process.
DESIGN CONSULTATION * DESIGN CONSULTATION *
DESIGN REVIEW *DESIGN REVIEW *
ENVIRONMENTAL REVIEW ** ENVIRONMENTAL REVIEW **
CLOSINGCLOSING
12 MONTHS
9 MONTHS
6 MONTHS
3 MONTHS
1010
CHAPTER 2
GENERALGENERAL
REQUIREMENTSREQUIREMENTS
1111
In Mayor Adams’ Housing our Neighbors: A Blueprint for Housing and Homelessness, HPD
committed to fast-tracking equitable decarbonization and releasing Design Guidelines
that will ensure these goals can be met across our portfolio. HPD was also one of 35 city
agencies and offices to help develop PlaNYC: Getting Sustainability Done, New York City’s
long-term strategic climate plan that highlights efforts the city is taking to protect New
Yorkers from climate threats, improve quality of life, and build the green economy. The
Guidelines ensure that HPD’s new construction meets these ambitious goals and are poised
to meet future requirements, including Local Law 154 of 2021, which mandates all electric
new construction.
1.1 1.1 PERFORMANCE STANDARDSPERFORMANCE STANDARDS
a. All projects must certify with the current version of the NYC Overlay of Enterprise Green
Communities (EGC) or LEED v4 Gold or above.
b. Design building to meet Local Law 97’s 2050 GHG emissions limits in 2050, assuming
a 100% clean electric grid. Note that fossil-fuel usage from emergency backup power
generation should be excluded from calculation*
a. Certify project to one of the following high performance building standards:
Enterprise Green Communities Plus, or
PHIUS or PHI. Note that all PHIUS/PHI projects must also certify with Enterprise
Green Communities or LEED Gold or above. Note that PHIUS certification requires
compliance with Energy Star and DOE Zero Energy Ready Home (ZERH).
1.2 1.2 ELECTRIFICATIONELECTRIFICATION
a. All projects must utilize high-performance all-electric heating/cooling and domestic hot
water equipment meeting the performance standards outlined in this document.
b. All appliances such as dryers and cooktops, ovens or ranges must meet the
performance standards outlined in this document.
a. Building is all-electric and designed to reduce electricity use by meeting one of the
reach certifications (EGC Plus, PHIUS or PHI). Note that use of on-site emergency back-
up power generation with fossil fuel is acceptable; high-efficiency fossil fuel generators
are permitted. Generators may only be used in no load tests/exercise and for emergency
purposes when the electric grid power fails.
b. Utilize induction cooking in lieu of electric resistance cooktops.
SECTION 1 /SECTION 1 / CORE SUSTAINABILITY STANDARDS CORE SUSTAINABILITY STANDARDS
CHAPTER 2
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS REACHREACHREACHREACH
System-based waivers
may be available at
the sole discretion
of HPD if project can
demonstrate that
electrification of a
system or an appliance
is technically or
financially infeasible
and building cannot
meet 2050 GHG
emissions limits as a
result.
System-based waivers
may be available at
the sole discretion
of HPD if project can
demonstrate that
electrification of a
system or an appliance
is technically or
financially infeasible.
If waived, system
should be designed
to be “Electric Ready”
per the guidance in
Appendix B to the
extent that the utility
can provide service.
The Inflation Reduction
Act (IRA) provides
up to $1,000/ DU for
projects that certify
with ENERGY STAR
and up to $2,500
per dwelling unit for
projects that certify
w/ DOE’s Zero Energy
Ready Homes program
(ZERH). All projects are
strongly encouraged to
seek these incentives.
ENERGY STAR is
required by EGC, and
ZERH is one path to
achieve Enterprise
Green Communities
Plus certification.
Note that high-
efficiency fossil
fuel generators are
permitted as of right.
1212
PlaNYC committed NYC to protect New Yorkers from higher temperatures, extreme rainfall
and coastal flooding, including implementing a multi-layered strategy for flood resiliency
and maximizing access to indoor cooling. HPD’s Design Guidelines support these efforts to
protect residents in affordable housing and will also ensure buildings are poised to meet
Local Law 41 of 2021, which will require that City-financed housing aligns with NYC’s Climate
Resiliency Design Guidelines.
As required by State law, New York City is a Participating Community in the National Flood
Insurance Program (NFIP), as administered by the Federal Emergency Management Agency
(FEMA). In New York City, the Department of Buildings is the flood plain administrator
and regulates building design and construction in accordance with the NFIP and FEMA
requirements. Appendix G of the New York City Building Code sets forth the comprehensive
regulations for flood plain management including the technical standards for compliance.
In addition, HPD-assisted projects that are defined as “flood-prone” below must meet the
requirements in Sections 2.1 and 2.2, and comply with all other baseline requirements as
applicable. The following sites are considered “flood-prone” for the purposes of the Guidelines:
Sites defined as being within the Special Flood Hazard Area, comprised of the 2007
effective Flood Insurance Rate Map (FIRM) and 2015 Preliminary Flood Insurance
Rate Map (PFIRM), whichever is more restrictive (includes both the 1% and 0.2%
annual chance floodplain).
Sites located within the 2080s 1% annual chance coastal floodplain per NYC’s Flood
Hazard Mapper.
Sites (or parts of sites) that are shown as adjacent to flooded areas in the extreme
stormwater flooding (100-year storm with 2080s SLR) scenario in the NYC
Stormwater Flood Map (see Section 2.2 Stormwater Management).
2.1 2.1 FLOODFLOOD
--
RESISTANT CONSTRUCTIONRESISTANT CONSTRUCTION
Sites defined as being within the Special Flood Hazard Area and/or the 2080s 1% annual
chance coastal floodplain per NYC’s Flood Hazard Mapper must meet the following
requirements.
a. Elevate all residential units, critical mechanical, electrical and life safety equipment and
controls, services critical to building function, and at least one point of egress for each
required egress pathway above the 2080s SLR-adjusted Design Flood Elevation (SLR-
adjusted DFE), as established by the New York City Climate Resiliency Design Guidelines
(CRDG) in Chapter II, Section C. Sea Level Rise.
b. Dry Flood-proof critical equipment that cannot be elevated, ensuring that the top of
permanent flood barriers are above 2080s SLR-adjusted DFE levels. Design foundation,
basement and ground floor structural elements for anticipated flood load.
SECTION 2 /SECTION 2 / RESILIENCY RESILIENCY
NYC’s Flood Hazard
Mapper utilizes
the high-end 90th
percentile projections
prepared by the
New York City Panel
on Climate Change
(NPCC) to identify
future projected
1% annual chance
floodplains.
REQUIREMENTSREQUIREMENTS
1313
c. Use flood-resistant construction materials for all construction below the DFE that is
susceptible to flooding. More information can be found here.
d. Install backwater valves with containment tanks and ejector pumps in the lowest level
of the building, and wire system to backup power system or emergency panel.
e. Provide permanent signage in buildings and flood disclosure information on tenant
leases notifying tenants of potential flood risk, including whether the unit is located
wholly or partially in a Federal Emergency Management Agency-designated 100-
year and 500-year floodplains, per FEMA Flood Insurance Rate Maps, and providing
resources to residents about emergency preparedness, encouraging them to subscribe
to NotifyNYC and to seek a National Flood Insurance Program renters’ flood insurance
policy to cover personal property and contents damaged by a flood.
f. Limit paved surfaces to where they are required for programmatic site elements in
favor of vegetated surfaces and/or vegetated stormwater retention systems (e.g., bio-
swales, green roofs, stormwater planters, grass filter strips). Where paved surfaces are
required, use open-grid or permeable systems to the maximum extent possible.
g. Procure flood insurance.
a. Provide additional flood mitigation features on the site, including deployable flood
barriers or natural systems-based approaches (e.g., living shorelines, restored
wetlands, landscape berms).
b. All paving or hardscaping to be open-grid or permeable pavement with drainage
underlayment, and be maintained to ensure ongoing permeability.
c. Additional measures can be found in Table 4 of the Climate Resiliency Design Guidelines.
2.2 2.2 STORMWATER MANAGEMENTSTORMWATER MANAGEMENT
a. Sites (or parts of sites) that are shown as adjacent to flooded areas in the extreme
stormwater flooding (100-year storm with 2080s SLR) scenario in the NYC Stormwater
Flood Map must meet the following requirements:
Elevate all residential units, critical mechanical, electrical and life safety equipment
and controls, services critical to building function, and at least one point of egress
for each required egress pathway above grade.
Install backwater valves with containment tanks and ejector pumps in the lowest
level of the building, and wire system to backup power system or emergency panel.
Procure flood insurance.
REQUIREMENTS FOR FLOODREQUIREMENTS FOR FLOOD
--
PRONE PROJECTSPRONE PROJECTSREACHREACH
Note that Design
Waivers may be
available if the team
can demonstrate that
designing to the 2080s
SLR-adjusted DFE
would result in loss
of residential units.
In such cases, the
building’s residential
units and equipment
should be elevated to
the maximum extent
possible.
Refer to NYC’s
Climate Resiliency
Design Guidelines for
additional information
and strategies to
address flooding. As
of publication the
CRDG Version 4.1
published in May 2022
is the more recent
version and should
be consulted until
superseded.
REQUIREMENTSREQUIREMENTS
1414
b. DEP’s Unified Stormwater Rules (USWR) now requires Stormwater Construction
Permits for projects that disturb 20,000 sf or more of soil or create 5,000 sf or more new
impervious surface. In addition, the Rules call for a retention-first approach and set new
stormwater quantity and flow rates for Site and House Connection Proposals.
c. For all projects, limit paved surfaces to where they are required for programmatic site
elements in favor of vegetated surfaces and/or vegetated stormwater retention systems
(e.g. bio-swales, green roofs, stormwater planters, grass filter strips). Where paved
surfaces are required, use open-grid or permeable systems to the maximum extent possible.
a. At least 50% of the site’s irrigation shall be satisfied by water use from rainfall capture
or greywater recycling/reuse.
b. All projects not subject to the USWR, especially those in flood-prone areas, are strongly
encouraged to follow DEP’s retention-first approach with a priority on vegetated
systems. See figures 4.2 and 4.3 in DEP’s USWR Stormwater Manual for guidance on
best practices.
2.3 2.3 EXTREME HEATEXTREME HEAT
a. All HPD-assisted projects must be designed and constructed to provide ENERGY STAR
rated or equivalent cooling to all residents in all habitable rooms in all buildings. Refer
to section 3.2 for additional info.
b. Senior Housing, buildings with low-mobility populations in 50% of units, and which are
located in high-heat risk areas (with Heat Vulnerability Index of 4 or 5) that are not
located within a 0.25-mile walk distance of dedicated, accessible public open space,
must provide permanent open space for use by all residents. The space must be at
least 80% unpaved except where necessary for programmatic uses, should provide
shade to at least 75% of the area, and include seating. Shade trees or solar canopies are
strongly encouraged to meet this requirement while providing multiple benefits. Non-
vegetated, non-solar structural shading devices shall have an initial SR of at least 0.33
as measured in accordance with ANSI/CRRC S100. Shade should be calculated for 12 pm
on June 21st and assume reasonable tree growth where trees are being proposed. Open
space may be located anywhere on the site, including grade or roof areas.
c. Over at least 50% of the site’s hardscaped areas must use:
light-colored, high-albedo materials with an initial minimum solar reflectance of 0.33, or
an open-grid pavement system.
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS REACHREACH
REACHREACH
Refer to NYC’s Climate
Resiliency Design
Guidelines and the
DEP’s Stormwater
Management
webpage for additional
information and
strategies to address
stormwater.
By the 2050s, the
number of days at
or above 90°F is
expected to double,
and the frequency of
heat waves will triple
to an average of six
heat waves annually.
1515
a. Provide permanent, shaded outdoor space for use by all residents in every building.
b. Minimize hardscaping and provide vegetated surfaces and/or shading (vegetated, solar
canopy, or shading devices having an initial SR of at least 0.33) over at least 50% of non-
roof areas.
c. In high heat areas, especially for south and west-facing walls, use exterior wall
finishes that are light in color and/or exhibit an initial solar reflectance of at least 0.60
and exhibit an initial thermal emittance of at least 0.75. Vegetated walls would also be
acceptable.
d. Provide shading on all south and west-facing windows to mitigate solar heat gain during
summer months. This can include appropriately designed exterior shading including
louvers, awnings, or deep recesses as well as appropriate interior shades (e.g., with
reflective backing) where exterior shading is not feasible or practical.
2.4 2.4 BACKUP POWER AND PASSIVE SURVIVABILITYBACKUP POWER AND PASSIVE SURVIVABILITY
a. Housing with seniors in at least 50% of units must provide the following:
Adequate backup power generation-in addition to service for critical/emergency
loads-to ensure that at least one elevator remains functional during an emergency
and
A community space (or spaces) that can serve as a “Place of Refuge” equal to 15
SF per bedroom that is accessible to all residents that includes backup power
for heating, cooling, lighting, outlets, WiFi, at least one refrigerator for every 50
bedrooms (or approximately 0.5 cubic feet per bedroom), and at least one accessible
bathroom with a potable water source. Ensure that the space has natural ventilation
and lighting.
b. Where backup power is not otherwise required, provide a dedicated emergency panel
that can be safely and easily connected to an efficient generator, mobile generator or
island-able solar system to power critical/ emergency loads. Prioritize emergency
systems such as egress lighting, life safety systems, small critical heating and cooling
loads, domestic water pumps to provide potable water, sewage ejector pumps, WiFi, and
convenience power for occupants (charging stations).
a. Provide a “Place of Refuge” (as defined above) in all buildings that is tied to an efficient
generator or dedicated emergency panel.
b. Design buildings to maximize the residents’ ability to “shelter in place” by providing
highly efficient building envelopes, natural ventilation, and natural light.
Refer to NYC’s
Climate Resiliency
Design Guidelines for
additional information
and strategies to
address extreme heat.
Projects may use an
efficient generator
or on-site battery
storage, possibly
paired with a solar
energy system
0-bedrooms and
Efficiency units should
count as 1 bedroom.
REACHREACHREQUIREMENTSREQUIREMENTSREACHREACH
1616
Highly efficient HVAC systems contribute to the comfort and safety of residents while
reducing energy use and putting buildings on a path to meet NYC’s ambitious climate goals
and laws, including Local Laws 97 and 154. This includes focusing on building electrification
—electrifying heating and hot water with high-performance heat pumps for heating and
cooling as well as ventilation to increase occupant and building health. Note that electric
heating and hot water systems must comply with HPD’s Electric Heating Policy which
ensures that efficient systems are encouraged, poorly performing systems are not allowed,
and tenants are protected. HPD’s Resident-Paid Heat Policy outlines the very restrictive
conditions under which heating may be paid for by building residents.
3.1 3.1 HEATING SYSTEMSHEATING SYSTEMS
a. All primary HVAC equipment must be all high-efficiency, all-electric, and carry an
ENERGY STAR certification or provide the equivalent in energy savings, quality and
operational costs. Heating Equipment shall be either cold climate air source or ground
source heat pumps. Acceptable equipment includes*:
Cold Climate Variable Refrigerant Flow (VRF) without Heat Recovery (2-pipe system)
with distinct zones for climate variations (E.G. North zone and South zone)
Cold Climate Variable Refrigerant Flow (VRF) with Heat Recovery (3-pipe system)
Residential/Light Commercial Air Source Heat Pumps
Ground Source Heat Pumps (GSHP)
b. Heat Pump equipment must meet the following conditions:
VRF Multi-Split must meet NEEP’s cold climate COP requirements @47°F, 17°F and
5°F based on outdoor unit capacity or equivalent, and must be certified by AHRI
Standard 1230
Packaged Terminal Heat Pump (PTHP) & Single Package Vertical Heat Pump
(SPVHP) must have a compressor with variable capacity (three or more distinct
operating speeds or continuously variable), have a COP @5°F 1.5 (at maximum
capacity operation), be certified by AHRI Standard 310/380 ·
Electric Resistance backup is not permitted, including when used as ‘auxiliary’ and
integrated within the PTHPs.
Boiler/tower water loop heat pumps are not permitted.
Central Equipment must be BAC-net capable to allow remote monitoring capability
of the temperature set-points.
SECTION 3 /SECTION 3 / HEATING, VENTILATION, AND HEATING, VENTILATION, AND
AIR CONDITIONING AIR CONDITIONING
REQUIREMENTSREQUIREMENTS
Refer to HDC’s new
Electric M&O Standard
for electric heating
and hot water.
Note that tenant-
paid electric hot
water must meet the
requirements of HPD’s
Electric Heating Policy
1717
VRF systems that do not include Heat Recovery shall be zoned appropriately to
ensure that all spaces on the same system have similar daily load profiles for
heating and cooling. Design of zones shall include analysis of unbalanced solar heat
gains and internal heat gains considering exposure and potential occupant load to
minimize instances where zone would require simultaneous heating and cooling.
Electric resistance space heating may be used with HPD pre-approval in spaces
such as common stairwells, utility rooms, basements, vestibules, and other spaces
where heat pumps may not be appropriate. Total heating capacity is limited to 3.5
kW per enclosed space. Heaters located in bathrooms must have timer controls; all
other heaters must have automatic controls (maximum time 30 minutes); and set at
50 degrees maximum. Electric resistance space heating is not allowed in garages
or plenums or for ice melting. Electric resistance heat IS allowed in high volume
situations such as laundry make-up air (but not for ventilation air).
c. Heating systems shall meet the following design considerations as applicable:
Projects must comply with HPD’s Electric Heating Policy.
For projects considering tenant/ resident-paid heating, projects must receive prior
permission from HPD Program and HPD Sustainability Office and must comply
with the requirements of HPD’s Resident-Paid Heating Requirements – including
adjusting the M&O and rent to account for shifting costs – using the appropriate
utility allowance.
Split System Heat Pumps must be installed per HPD’s Space Heating Heat Pump
Technical requirements: Split Systems
Room Heat Pumps (PTHPs) must be installed per HPD’s Space Heating Heat Pump
Technical Requirements: Cold Climate Room Heat Pumps
All loads must be calculated according to ACCA Manual J 8th Edition or according to
the Residential Cooling and Heating Load Calculations chapter of ASHRAE Handbook
of Fundamentals and ANSI/ASHRAE Standard 183-2007.
All equipment must be sized according to ACCA Manual S.
Exterior units shall be screened from horizontal view or located so they are not
visible from dwelling units, common spaces, or sidewalks.
Refrigerant leaks can greatly affect system efficiency and comfort, as well as posing
significant harm to the environment. Projects must meet the Refrigerant Charging
and Leak Prevention Requirements.
REQUIREMENTSREQUIREMENTS
Waivers may be
available at the
sole driscretion of
HPD if project can
demonstrate that
the requirement
is technically or
financially infeasible
and is not otherwise
required by codes and
laws.
1818
a. Use higher-than-minimum equipment efficiencies or utilize ground source heat pumps.
b. Use low-GWP refrigerants to the extent possible, and/or water-based distribution
systems in lieu of refrigerant-based systems.
c. For central equipment with BACnet capability, provide means to control in-unit set
points.
d. meet reach criteria for building performance to reduce heating and cooling load.
3.2 3.2 COOLING SYSTEMSCOOLING SYSTEMS
a. All HPD-assisted projects must be designed and constructed to provide energy-efficient
air conditioning to all residents in all habitable rooms in all buildings.
This requirement can be satisfied by systems that provide both heating and cooling,
and this type of system is preferred for HPD-assisted projects.
b. If standalone air conditioning units are proposed in lieu of heat pumps for cooling:
Owner must provide and install one air conditioning unit, as specified below, in every
habitable room in all dwelling units.
All air conditioning units must be ENERGY STAR certified.
Any air conditioning units installed in a through-wall sleeve must be designed to be
used in such an application.
All through-wall air conditioning units must be installed through an insulated,
well-fit panel that is fully air-sealed at the opening and structurally supported as
necessary. If through-wall or window air conditioning units remain installed year-
round, owners must provide insulated covers for all air conditioning units and store
them seasonally if requested by tenant.
For project proposing window units, windows must be sized for natural light and
ventilation as if one window unit in each room is permanent (e.g. that portion of
window designed to hold air-conditioning equipment may not contribute to light and
air calculations).
c. Air conditioning controls must be fully accessible: either (1) air conditioning units or
permanent unit controls must be located within required accessible reach ranges in all
units; or (2) the air conditioning unit must include a remote control and an accessible
wall switch.
REACHREACHREQUIREMENTSREQUIREMENTS
1919
a. Provide exterior or interior window shading devices to reduce solar heat gain.
b. Provide ceiling fans in dwelling units and common areas, provided that the lowest part
of the fan remains at least 7’-6” above the finished floor and only where resident and
guest safety can be assured. Ceiling fans must be coordinated with NFP requirements.
3.3 3.3 VENTILATIONVENTILATION
a. Window screens must be provided and installed on at least one operable sash in each
habitable room in every dwelling unit. Window screens must be designed and installed
to facilitate window cleaning.
b. Verify that in-unit ventilation system ductwork is installed to achieve design flow
rates, and that installed flow rates are within +/- 15 CFM or +/- 15% of design value, as
mandated through the EGC and ENERGY STAR Multifamily New Construction program.
c. Projects designing to Passive House performance levels must include Energy Recovery
Ventilation in all spaces regardless of whether they plan to certify.
d. If the system includes Constant Air Regulators (CAR) at exhaust registers for vertical
exhaust systems, provide access for servicing or repairs of CAR and Fire Damper
devices.
e. Operation and Maintenance (O&M) training materials for the ventilation system must be
provided to building staff and residents. Specify an appropriate maintenance regimen for
building owners, facility managers, and superintendents for both normal and enhanced
operations, and reflecting manufacturer’s recommendations for regular equipment
upkeep (e.g. the replacement schedule of filters, checking condensation lines, etc.).
a. Provide screens on all operable windows. Screens outside windows may help to satisfy
code-mandated bird safety glazing requirements.
b. In common areas, provide operable windows and replace factory-installed window
limiters for alternative window guard devices to maximize airflow while maintaining
safety and security.
c. Install balanced ventilation with fresh air and MERV-13 (or higher) filters to provide
filtered fresh air to all dwelling units. Prioritize the following buildings:
Buildings in NYC neighborhoods where the estimated annual rate of asthma
emergency department visits related to PM2.5 for children under 18 is more than 150
per 100,000 children. See the NYC’s Environment and Health Data Portal to identify the
five NYC neighborhoods in the Bronx and Harlem meeting these conditions.
REACHREACHREACHREACH REQUIREMENTSREQUIREMENTS
2020
Buildings within 500’ of a heavily trafficked roadway
Buildings located in areas with high ambient noise levels, which typically include
those near highly trafficked thoroughfares, airports, heliports, train facilities, or
other loud activities
d. Ventilation systems should include a high-speed or “boost” setting. Confirm ductwork
has been sized to have additional capacity in order to minimize friction & noise and is
properly sealed.
e. Incorporate additional fresh air into mechanical systems if it can be done without
compromising industry standard proposed design temperature and humidity criteria.
f. Consider a regime of boosting ventilation seasonally, especially in senior housing.
Systems should be sized/ designed to accommodate MERV 13 filters on all outdoor (but
not return) air intakes.
g. Where applicable, use pleated filter media and appropriately sized filter housings with
well-fitting filter slots and racks. Thicker (4”) filters are more effective than thinner
filters. Consider flexible, rather than permanent, solutions including manual Demand
Control Ventilation (DCV) overrides, flushing sequences and bypass options on HVAC
systems, and multi-speed fans. Incorporate standalone, plug-in filtration as needed.
3.4 3.4 DOMESTIC HOT WATER (DHW)DOMESTIC HOT WATER (DHW)
a. All projects must utilize high-efficiency electric domestic hot water systems, including:
Central heat pump water heaters
Ground source systems tied to space conditioning system
Sub-central electric water heaters with plants that provide distribution on a floor-
by-floor basis where possible
Projects serving senior residents and/or containing supportive housing units
should not assume tenant-paid hot water. Otherwise, in-unit/ resident-paid electric
resistance water heaters may be allowed on HPD projects under the following
conditions:
Project must demonstrate that when factoring in distribution losses, system is
at least as efficient and cost effective as a central heat pump system
For projects considering resident-paid DHW, projects must receive prior
permission from HPD Program and HPD Sustainability Office and must comply
with the requirements of HPD’s Resident-Paid Heating Requirements – including
adjusting the M&O and rent to account for shifting costs
REACHREACH
REACH FOR HIGHREACH FOR HIGH
--
OCCUPANCY/OCCUPANCY/
HIGHHIGH
--
USE COMMON AREASUSE COMMON AREAS
REQUIREMENTSREQUIREMENTS
2121
Projects must underwrite the project using the appropriate utility allowance.
In-unit recirculation systems must be demand-initiated.
Instantaneous electric hot water heaters may be used on common and
commercial areas only.
b. Heat Pump Water Heating (HPWH) equipment must comply w/ ENERGY STAR Water
Heater requirements as applicable:
Residential:
Energy Star Water Heater Key Product Criteria
Commercial:
Energy Star Program Requirements for Commercial Water Heaters
c. Heat Pump Water Heating (HPWH) equipment must meet the Federal Energy
Management Program high-efficiency requirements for electric water heaters have an
AHRI Certificate if applicable.
d. HPWH equipment must be capable of storing minimum 140 degree water at 5 degree
outdoor air temperature.
e. DHW systems shall be designed to store no more than 0.5 gallon of water in any piping/
manifold between any fixture and the water heating source or recirculation line. No
more than 0.6 gallon of water shall be collected from the fixture before a 10-degree
Fahrenheit rise in temperature is observed.
f. All Heat Pump Water Heating equipment must be installed per HPD’s Technical
Requirements for Heat Pump Water Heaters and should follow the guidelines outlined in
HPD’s Best Practices Documents.
a. Incorporate drain-water or wastewater heat recovery to the extent feasible.
b. Harvest, treat, and reuse greywater to meet a portion of the project’s non-potable water
needs
Note that tenant-
paid electric hot
water must meet the
requirements of HPD’s
Electric Heating Policy
REQUIREMENTSREQUIREMENTSREACHREACH
2222
3.5 3.5 THERMOSTATSTHERMOSTATS
a. Preset all units with reasonable and code-compliant heating & cooling temperatures,
typically
Heating: 70 degrees daytime and 66 degrees night-time. Minimum temperatures
during heating season must comply, at minimum, with NYC’s Heat Laws
Cooling: 76 degrees occupied, and 82 degrees when away
b. Preset maximum/minimum limits to prevent overuse, typically 74 degrees maximum for
heating (or 76 degrees for seniors) and 72 degrees minimum for cooling. Note that these
are recommendations and may be adjusted per the Owner’s discretion.
c. Preset off hour controls with thermostatic setback controls that are controlled by either
an automatic time clock or programmable\control system.
d. Provide easy-to-read guidance in multiple languages (e.g., signage, videos, etc., for
residents on system use and energy saving thermostat settings, especially where
heating is resident-paid. Refer to HPD’s Resource Packet for Residents.
e. In common areas, remote wall thermostats accessible to the public should be in a
locked enclosure and controlled by the building operations team.
f. A 7-day programmable thermostat is required, per the energy code. Controls shall be
fixed, wall-mounted types that are simple and easy to read and adjust.
3.6 3.6 SYSTEM COMMISSIONINGSYSTEM COMMISSIONING
a. All HVAC systems, including at least 20% of heating systems not meeting the minimum
capacity required by NYC, should be commissioned per the functional testing via the
ENERGY STAR National HVAC Functional Testing Checklist (the most current version
available).
b. All compressor-based units with >70% Outside Air must include seasonal tuning and
adjustment including 1 week of trend data showing proper operation of energy recovery,
temperature and humidity control.
c. Buildings with Central VRF based systems shall
Meet manufacturers extended warranty requirements.
Show error logs for at least 1 week of operation during 1 heating and 1 cooling season
at normal occupied conditions and loads, all units shall be labeled by apt number.
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS
For further reference:
ENERGY STAR
Functional Testing
Checklist and ENERGY
STAR Field Checklist
2323
Reducing energy use is a key step toward decarbonization but is especially critical to ensure
that electrification doesn’t increase energy costs or burdens on the grid. Optimizing building
envelopes, offsetting loads with solar, and reducing energy use with efficient fixtures will
reduce energy costs, reduce impacts on the NYC electric grid, and put buildings on a path to
meet long term decarbonization goals. Requirements for this section are generally covered by
the NYC Overlay of Enterprise Green Communities (EGC) or, where applicable, LEED.
Requirements that are not covered by EGC or LEED include:
4.1 4.1 SOLARSOLAR
a. All projects are subject to HPD’s Solar Where Feasible Mandate.
b. All solar projects are required to comply with HPD’s Solar Technical Requirements.
c. Further information, including access to free design and technical assistance, can be
found on HPD’s Solar Where Feasible webpage.
a. All projects, but especially projects with resident-paid heating or other utilities, should
consider Community Shared Solar that provide at least 20% savings to benefit residents,
either onsite or by subscribing residents to offsite Community Solar Projects. Through
HPD’s Solar Where Feasible Program, our non-profit partner Here Comes Solar can help
owners explore onsite community solar options or connect residents with community
solar projects.
b. Projects are encouraged to consider battery storage, or where deemed infeasible, to
design projects to accommodate storage in the future.
4.2 4.2 APPLIANCESAPPLIANCES
a. All ranges, cooktops, ovens and clothes dryers shall be all-electric, including
commercial equipment.
b. All refrigerators, dishwashers and clothes washers must meet or exceed ENERGY STAR
where available. Commercial washers may be non-ENERGY STAR rated provided they
meet or exceed the energy efficiency, quality, and reduced operational costs associated
with ENERGY STAR rated appliances.
a. Utilize induction cooking in lieu of electric resistance cooktops. Providing a starter set of
cookware to tenants can be used to encourage participation in resident training events.
SECTION 4 / SECTION 4 / ENERGY EFFICIENCY & ENVELOPEENERGY EFFICIENCY & ENVELOPE
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS REACHREACHREACHREACH
System-based waivers
may be available at
the sole discretion
of HPD if project can
demonstrate that
electrification of a
system or an appliance
is technically or
financially infeasible.
If waived, system
should be designed
to be “Electric Ready”
per the guidance in
Appendix B to the
extent that the utility
can provide service.
Note that starting in
November 2024, all
projects, regardless
of affordability status,
will be subject to
Local Laws 92 & 94.
2424
4.3 4.3 ELECTRIC VEHICLE CHARGINGELECTRIC VEHICLE CHARGING
a. Provide infrastructure to accommodate future EV charging in all parking lots and garages,
regardless of the project’s affordability status or AMI levels. Electrical raceway to the
electrical supply panel serving the garage shall be capable of providing a minimum of 3.1
kW of electrical capacity to at least 20% of the parking spaces, or as required by code.
b. Provide at least one Level 2 electric vehicle (EV) charging station for 5% of parking
spaces provided in a project. EV charging stations shall be equitably distributed
throughout the project to allow residents equal convenience in accessing the EV
charging stations and must serve at least %5 of accessible parking spaces, or as
required by code. Note that typically one charger can serve two parking spaces.
c. For projects with individual driveways, provide a dedicated branch circuit that is not less
than 40-amp and 208/240-volt terminating in a receptacle for EV charging capabilities
located adjacent to the driveway.
a. Provide infrastructure to accommodate future EV charging for up to 60% of parking
spaces in all parking lots and garages.
b. Provide at least one Level 2 electric vehicle (EV) charging station to up to 20% of all
parking spaces.
c. Provide safe and secure means for parking and charging e-bikes and other micro-
mobility devices for at least 10% of regular building occupants.
4.4 4.4 BUILDING ENVELOPEBUILDING ENVELOPE
a. Buildings must minimize geometric irregularities that negatively impact a building’s
ability to air-seal or achieve high levels of energy efficiency.
b. Design envelope based on forward looking climate data. Refer to Table 2 of the Climate
Resiliency Design Guidelines for data.
c. In high heat areas, especially for south and west-facing walls, use exterior wall
finishes that are light in color and/or exhibit an initial solar reflectance of at least 0.60
and exhibit an initial thermal emittance of at least 0.75. Vegetated walls would also be
acceptable.
a. Provide shading on all south and west-facing windows to mitigate solar heat gain during
summer months. This can include appropriately designed exterior shading including
louvers, awnings, or deep recesses.
b. Avoid large expanses of unshaded glazing, especially on south and west facades.
Projects that do not
provide parking in a
lot are exempt from
this requirement.
Waivers may be
available at the
sole discretion of
HPD if project can
demonstrate that
the requirement
is technically or
financially infeasible
and is not otherwise
required by codes and
laws.
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS REACHREACHREACHREACH
2525
SECTION 5 / SECTION 5 / HEALTH & WELLNESSHEALTH & WELLNESS
The items in this section cover measures that contribute to the health, safety, and well-
being of residents during and after construction. Additional Requirements related to Health
and Wellness are covered by the NYC Overlay of Enterprise Green Communities (EGC) or,
where applicable, LEED. In the event of a conflict between requirements in these Guidelines
and the most current EGC or LEED requirements adopted by the agency, the more stringent
requirement shall prevail.
5.1 5.1 HEALTHY & ENVIRONMENTALLY RESPONSIBLE MATERIALHEALTHY & ENVIRONMENTALLY RESPONSIBLE MATERIAL
a. Coordinate with structural engineer to incorporate low-carbon concrete specifications
for all batch plant ready-mixed concrete where practicable and not preempted by State
or Federal requirements. Specifications may include less cement, limestone cement and
low-carbon concrete mixes, fly ash, slag, calcined clays, larger aggregate, and longer
cure times.
b. Specify concrete block with high supplementary cementitious material (SCM) content.
c. Submit a publicly disclosed Environmental Product Declaration (EPD) for all structural
concrete and steel on the project.
a. Use recycled steel and/or steel from electric arc furnaces (EAFs) to the extent possible.
b. Specify concrete block with carbon sequestering additives or Carbon Cure technology,
which can reduce CO2 by 25%.
c. Do not utilize foam-based insulation containing flame retardants or that are made with
HCFCs and PFCs – including extruded polystyrene (XPS) and closed cell spray foam
insulation.
d. Avoid PVCs and phthalates, which are common in many building materials, especially
vinyl flooring.
e. Complete a Whole Building Life Cycle Assessment or Hotspots Analysis
f. Use low emission construction machinery where available.
g. Use lower-density block on upper floors where strength requirements are lower.
h. Procure publicly disclosed Environmental Product Declaration (EPD) for as many
products as feasible, prioritizing concrete, steel, and insulation as well as major building
elements including wallboard, exterior cladding, and paints/coatings.
i. When proposing product substitutions for lower embodied carbon products, submit final
product data to HPD to add to HPD’s pending database of clean/ safe products. Products
may be submitted here: [email protected]yc.gov with the subject line “Design
Guidelines Product EGP”
REQUIREMENTSREQUIREMENTSREACHREACH
2626
5.2 5.2 WASTE MANAGEMENTWASTE MANAGEMENT
a. Per DSNY, all new construction with at least 150 dwelling units are required to submit
a Waste Management Plan and schedule a consultation with DSNY early in the design
process.
b. All other projects are required to use the DSNY Waste Calculator (or other similar
calculator including the Zero Waste Design Waste Calculator) and are strongly
encouraged to schedule a free 1-hour consultation w/ DSNY on Zero Waste Strategies
EARLY in design process.
c. Projects must provide refuse storage at a rate of 2.9 cubic feet per dwelling unit to allow
for future waste stream collection. Cardboard breakdown areas located proximate to
mail and package delivery room may be counted toward this requirement.
d. Buildings in Community Districts where DSNY’s s Curbside Composting is available must
sign up for and participate in the program.
a. Buildings with 10 or more units shall:
Require building management to attend DSNY’s free 9-hour Zero Waste Training.
Design for and enroll in DSNY’s free eCycle and reFashion programs.
b. On-site source separation of materials should be practiced to the greatest extent
feasible. BLDS encourages separate bins for recycling of organic waste, and designated
space for the recycling of cardboard, electronics, textiles, and special waste such as
paint, light bulbs, etc.
5.3 5.3 ACTIVE DESIGNACTIVE DESIGN
The City of New York and partners published Active Design: Affordable Designs for Affordable
Housing as a guide for designing affordable housing developments that benefit resident
health and well-being. The document supplements New York City’s Active Design Guidelines,
which outline a broad array of architectural and urban design strategies to encourage,
walking, bicycling, climbing stairs, using transit, active recreation, and a healthy diet. Active
Design: Affordable Designs for Affordable Housing is more focused on feasible, low-cost
strategies to integrate active design in affordable housing developments. The principles
outlined in this document must be considered for new HPD development projects.
REQUIREMENTSREQUIREMENTSREACHREACH
2727
SECTION 6 / SECTION 6 / ACCESSIBILITY & AGEACCESSIBILITY & AGE
--
FRIENDLY DESIGNFRIENDLY DESIGN
HPD-assisted projects must comply with federal accessibility laws and regulations—
including Section 504 of the Rehabilitation Act of 1973, the Fair Housing Act, and HUD’s
implementing Regulations (24 CFR Parts 8¹ and 100, respectively). HPD team must also
affirmatively further the goals of the Fair Housing Act. These, and related laws and
regulations, prohibit discrimination based on disability and establish design requirements
for program accessibility and physical accessibility in connection with housing programs. In
addition, HPD team must ensure that such comply with the local accessibility requirements
of Chapter 11 of the New York City Building Code. As an assurance that HPD-assisted
projects meet all the applicable accessibility laws and regulations, each architect must
provide an “Accessibility Statement”, pre-construction and post-completion, certifying that
the design and construction of the project complies with the accessibility requirements of
the New York City Building Code, Section 504 of the Rehabilitation Act of 1973, and the Fair
Housing Act, as applicable. The form is available in the Appendices section.
6.1 6.1 FAIR HOUSING ACTFAIR HOUSING ACT
All new construction housing projects built for first occupancy after March 13, 1991 consisting
of four or more units are required to comply with the design and construction requirements
of the Fair Housing Act. A Joint Statement of The United States Department of Housing and
Urban Development and U.S. Department of Justice, Accessibility (Design and Construction)
Requirements for Covered Multi-family Dwellings Under the Fair Housing Act, dated April
30, 2013 included ten (10) safe harbors satisfy these requirements. The Joint Statement is
available at http://www.ada.gov/doj_hud_statement.pdf. Information on the Fair Housing Act
design and construction requirements is also available at https://www.fairhousingfirst.org/
6.2 6.2 SECTION 504 OF THE REHABILITATION ACT OF 1973SECTION 504 OF THE REHABILITATION ACT OF 1973
All HPD-assisted projects (including Inclusionary Housing) with five or more dwelling units
must comply with the accessibility requirements of Section 504 of the Rehabilitation Act
of 1973. Section 504 requires that, for projects involving the new construction of housing
containing five or more dwelling units and for projects involving the substantial alteration of
housing containing 15 or more dwelling units, a minimum of five percent (5%) of the total number
of dwelling units must be accessible and designated for households with a person with a
mobility-impairment. An additional minimum of two percent (2%) of the total dwelling units
must be designated for households with a person with a hearing or vision impairment. These
units must be distributed throughout the project and made available in a sufficient range of
sizes as not to limit the choice of individuals/ households with physical impairments. These
units must be distributed proportionally across affordability brackets to the extent possible.
In a mixed market-rate/Inclusionary development project, the 5% and 2% requirements apply
both to the project in its entirety and to the Inclusionary portion considered separately.
When calculating the required minimum number of accessible units, any fraction of a whole
number must be rounded up (as described in HUD Notice PIH 2010-26).
Various laws,
regulations, and
architectural
standards use the
terms “accessible
and “adaptable”. For
the purposes of this
document, the term
“accessible” is used
throughout, with the
recognition that the
apartments/units
may require adaption
(e.g. installation of
grab bars, lowering
of countertop height,
etc.) to meet the
specific needs of
households or
individuals.
While 24 CFR Part 8
Regulations indicate
the minimum of 5%
mobility impairment
and minimum of
2% hearing or
visual impairment
requirements apply
to projects receiving
federal assistance,
subsequent
civil rights laws
broadened the
requirement to
all programs and
activities of housing
agencies, such as
HPD, that receive
federal assistance
For further reference,
see the HPD
Accessibility Guide.
2828
The Uniform Federal Accessibility Standards (UFAS) or the 2010 ADA Standards for
Accessible Design serve as the design standards for compliance with Section 504 of the
Rehabilitation Act of 1973. The requirements for new construction and substantial alteration
projects differ from those for moderate alterations of existing housing; refer to Section 8.23
Alterations of Existing Housing Facilities” of the implementing regulations.
6.3 6.3 2010 AMERICANS WITH DISABILITIES (ADA) STANDARDS2010 AMERICANS WITH DISABILITIES (ADA) STANDARDS
Places of public accommodation and commercial facilities (e.g. retail spaces, community
facilities, leasing offices, etc.) must comply with the Americans with Disabilities Act (ADA)
guidelines, 2010 ADA Standards for Accessible Design.
For architects seeking to use the 2010 ADA standards to meet the Section 504 requirement,
HUD has identified certain provisions in the 2010 Standards that provide less accessibility
than is currently required by UFAS and/or HUD’s Section 504 regulation. As a result, HUD is
not deeming use of those specific provisions of the 2010 Standards as a means of providing
accessibility under Section 504. For more information and instructions for use of this
alternative design standard, please refer to the HUD notice.
6.4 6.4 AGEAGE
--
FRIENDLY DESIGNFRIENDLY DESIGN
Many adults prefer to live in their own home and community as they age, wishing to
live safely, comfortably, and independently for as long as possible. In addition to the
requirements set forth in the Guidelines for Senior Housing projects, BLDS encourages
cost-effective measures to implement the recommendations of Aging in Place Guide for
Building Owners.
a. Provide sufficient, consistent light levels throughout the building and site, especially on
pathways and at entrances.
b. Install dual handrails and slip-resistant stair strips in common and exterior areas.
c. In all dwelling units in elevator buildings, and ground floor units where ground floor is
accessible, include grab bars & accessible bathroom fixtures (including walk-in/low
threshold showers, ADA-compliant toilets, sinks with removable cabinets, and anti-
scald devices).
d. Design interior and exterior doors to be easily accessible, including minimal thresholds/
saddles, lever handles, and/or automatic openers.
REACHREACH
2929
SECTION 7 / SECTION 7 / BROADBANDBROADBAND
Right now, half of New Yorkers living in poverty do not have internet at home. The
neighborhoods with the lowest rates of internet adoption are also the focus of most of the
City’s affordable housing development. Multifamily housing projects present opportunities
to close this digital divide and improve the socioeconomic outcomes of many of the city’s
most vulnerable populations. Internet service that is robust enough to perform daily tasks is
essential for enrolling in government programs, seeking employment, and attending college.
Broadband has become as necessary as a utility.
These design guidelines outline the requirements for the installation of fast and reliable
broadband for all HPD-assisted multifamily projects currently in HPD’s development
pipeline. “Fast” is defined as speeds of at least 100 Megabits per Second (Mbps) upload and
download, per unit, while “reliable” is defined as 99.9% uptime for the service.
a. Broadband service must be part of the tenant’s lease contract and at no additional cost
to the tenant.
b. Provide wireless service in common areas, including: lobbies, lounges and common
rooms, laundry rooms, outdoor areas, and other shared spaces.
c. Speeds must be at least 100 Mbps upload and download, per apartment.
d. Each household must have secured access through a unique profile.
e. Households should be given the option to enhance their individual level of service at
their own cost, if additional service plans are offered by the internet service provider.
f. The building may choose to contract with and/or provide access to one or more internet
service providers (ISPs), including fiber ISPs, wireless ISPs, and managed ISPs.
g. While available, ISPs should take advantage of the Federal Affordable Connectivity
Program (ACP), if applicable.
h. Installation: Fiber to be run vertically from the network switch in the basement to the
rooftop for use by a wireless internet service provider.
i. Distribution: Fiber or cable to terminate at a hallway access point (hotspot) outside
groups of multiple dwelling units.
j. Building owners should retain ownership of the network infrastructure within the
building. As a result, maintenance should be part of the contract with the ISP.
k. All vertical and horizonal cabling pathways should be easily accessible and have room
for the addition of more cabling in the future.
l. The buildings network equipment should be accessible both in the basement and from
the rooftop of the building.
Projects participating
in the Inclusionary
Housing incentive
programs (either
MIH or VIH) that
are not subsidized
through any HPD
Loan Programs and
projects receiving
421-a tax credits only
are not subject to
these guidelines.
REQUIREMENTSREQUIREMENTS
3030
a. Installation: Fiber is in a conduit that is trenched from the basement to the nearest
telecommunications vault in the street and connected to a network switch in the
basement. Additionally, fiber run from the network switch in the basement to the rooftop
for use by a wireless internet service provider, or
Fiber is in a conduit that is trenched from the basement to the nearest telecommunications
vault in the street and connected to a network switch in the basement.
b. Distribution: Fiber or cable terminates in the living room or an easily accessible area of
each dwelling unit at a wall jack, where it can be plugged into a router, or
Fiber or cable terminates at a ceiling-mounted access point (hotspot) in each dwelling
unit vestibule.
REACHREACH
3131
SECTION 8 / SECTION 8 / BUILDING OPERATIONSBUILDING OPERATIONS
Regular building Operations & Maintenance (O&M) practices minimize building maintenance
needs and utility consumption and ensure a healthy, safe, and durable living environment for
residents. Additional Requirements related to Building Operations are covered by the NYC
Overlay of Enterprise Green Communities (EGC) or LEED where applicable.
8.1 8.1 BENCHMARKING & DATA COLLECTIONBENCHMARKING & DATA COLLECTION
a. All projects with 5+ unit buildings are required to benchmark energy and water use per
HPD’s Benchmarking Protocol.
b. Buildings are required to retain a listed, pre-qualified benchmarking service provider for
the restriction period governed by the regulatory agreement.
a. Submit projected and actual energy/water use data directly to HPD upon request and
allow data to be published.
8.2 8.2 RESIDENT RESOURCESRESIDENT RESOURCES
a. An HPD Resource Packet for Residents must be provided to residents who pay for their
own electric heating and hot water and is a useful resource to any resident who has
heat pumps or pays for utilities. Link: https://nyc-csg-web.csc.nycnet/site/hpd/services-
and-information/underwriting-electric-high-performance-buildings.page
REQUIREMENTSREQUIREMENTSREQUIREMENTSREQUIREMENTS REACHREACH
SECTION 9 /SECTION 9 / COMMERCIAL & RETAIL SPACES COMMERCIAL & RETAIL SPACES
HPD is interested in the long-term viability of retail space in affordable housing
developments. To succeed, spaces must be able to address the needs of existing
neighborhood contexts and adapt to changes in those needs. In collaboration with the
Design Trust for Public Space, HPD has developed guidelines of the most cost-effective
strategies to develop high-quality, flexible retail spaces. The publication is available on
HPD’s website.
3232
CHAPTER 3
DESIGNDESIGN
REQUIREMENTSREQUIREMENTS
3333
CHAPTER 3
SECTION 1 / SECTION 1 / SITE PLANNINGSITE PLANNING
SECTION 2 / SECTION 2 / BUILDING EXTERIOR BUILDING EXTERIOR
Projects must consider the logistical and financial constraints of construction on their site
and optimize their design proposals. While every site and program are unique, the following
general principles should be addressed:
a. Avoid excessive excavation. Particularly in areas with unknown subsurface conditions,
and where rock or high water tables are prevalent, proposed cellars may have to be
reduced, relocated, or even eliminated. Early planning for such contingencies (including
determining alternate locations and even eliminating cellars in some locations) may
preserve essential design elements.
b. Avoid underpinning adjacent structures by locating excavation areas away from them
when possible.
c. Avoid excessive lot-line windows. Such fenestrations are subject to additional code
requirements, as outlined in the Department of Buildings-issued ‘Buildings Bulletin
2015-17’ issued by the Department of Buildings.
a. The massing of buildings should relate to the surrounding context, avoiding abrupt
changes in height from adjacent buildings and deviations from the street wall. Proportions,
dimensions, and spacing of fenestration should complement neighborhood patterns.
b. Avoid overcomplicated geometry and design irregularities which negatively impact a
buildings ability to air-seal or achieve high levels of energy efficiency.
c. Avoid overglazing and minimize unshaded glazing that will contribute to solar heat gain
in summer.
d. Articulation of massing, material, color, and texture should be used to define elements
of buildings. Building facades should be dynamic: HPD encourages variation in the type,
color, texture, and depth of material in the building envelope to create a sense of depth
with light and shadow and to avoid a flat, planar appearance.
e. All HPD projects should be constructed of high quality, attractive, sustainable, and
durable materials that minimize maintenance costs. When choosing exterior finish
materials, consider the new building’s relationship to the surrounding neighborhood in
terms of color, texture, and pattern.
f. Avoid matching materials and patterns of nearby affordable housing.
a. Designs should relate to the human scale at the base level and activate the ground floor
along the street frontage. The main residential entrance should be distinguished from
the rest of the building and should provide shelter from inclement weather.
REQUIREMENTSREQUIREMENTS REQUIREMENTSREQUIREMENTSREACHREACH
3434
SECTION 3 / SECTION 3 / OUTDOOR SPACES OUTDOOR SPACES
a. All areas of programmed outdoor space must be fully mobility-impaired accessible, and
changes in elevation must be shown on all plans included in the submission.
b. Paved areas must be constructed of cost-effective and durable materials.
c. Outdoor spaces must provide reasonable amount of seating spaces.
d. Provide low-maintenance, attractive landscaping that incorporates native plants (or
plants adapted to the local climate) to limit the need for artificial irrigation.
a. Maximize the tenant use of outdoor space including all yards at ground level, terraces,
and rooftops.
b. When providing multiple outdoor spaces, differentiate each space through design and
programming.
c. Provide outdoor electrical outlets for resident use and special events.
d. In developments including family-oriented dwelling units, provide a toddler play area
with safe equipment and matting located to allow nearby supervision. Group play
areas with other programmatic elements such as laundry rooms, outdoor seating, and
recreation spaces. Play areas should be secured and screened from street traffic.
e. Reduce impervious surfaces and include green infrastructure elements that help reduce
stormwater runoff while providing benefits such as cleaner air, habitat, and aesthetic value.
f. HPD encourages landscaping that reduces heat island effects and keeps outdoor
spaces comfortable including light colored surfaces, green roofs and shade trees.
These measures will be increasingly valuable as temperatures rise due to climate
change. Note that per Local Laws 92 & 94, buildings will be required to install solar
or green roofs on available roof area, with certain exceptions including roofs used for
recreational purposes.
REQUIREMENTSREQUIREMENTSREACHREACH
3535
SECTION 4 / SECTION 4 / BUILDING PLANNINGBUILDING PLANNING
4.1 4.1 LOBBY & CIRCULATIONLOBBY & CIRCULATION
a. Each building must have a ground floor residential entrance lobby that is distinctly
articulated and clearly visible from the street. This lobby must be restricted exclusively
to residential use and must be entirely separate from the circulation of non-residential
uses such as commercial, retail, or community facilities.
b. The residential lobby must be an inviting space, distinguished from corridor circulation
by choice of materials, high ceilings, seating areas or other design strategies. The lobby
must have ample daylight and a direct view to the street or landscaped areas.
c. Residential corridors must be at least 5’-0” clear width from wall to wall with minimal
obstructions.
d. Separate residential circulation, including secondary means of egress, from that of non-
residential uses (except for Use Group 3 Community Facilities.)
a. Larger buildings, particularly those with multiple building segments, should provide
multiple lobbies, each with direct ingress and egress.
b. Building services—including waste management, utilities, janitorial and mechanical
rooms—should not open directly into the lobby.
c. Mailroom or mail alcove should be located in an area that is visible and accessible from
the lobby. The residential lobby establishes circulation patterns within the building: the
primary vertical circulation/elevator must be visible and accessible from the lobby.
d. BLDS encourages natural lighting throughout public circulation spaces and corridors,
and separation of these corridors from trash route.
e. A parcel room is recommended to store delivered packages. Note that USPS still
requires parcel lockers even if a parcel room is provided.
f. Locating cardboard breakdown area and associated recycle bin in parcel room and
paper recycle bin in mail room can improve waste diversion.
g. On each floor, the public circulation space should be minimal. Long corridors are
strongly discouraged except when designed to capture natural light: location of 3- and
4-bedroom units at the ends of corridors may reduce corridor length. The interior
circulation system should minimize changes in corridor direction, recesses, and offsets.
h. BLDS recommends a centralized core to diminish travel distances and multiple vertical
circulation cores for larger buildings. Walking distance from the elevators to the farthest
unit should not exceed 180 feet.
REQUIREMENTSREQUIREMENTSREACHREACH
3636
4.2 4.2 ELEVATORSELEVATORS
Planning and functionality of elevators in each building greatly impacts the quality of
life of its residents, especially seniors and people with disabilities. When elevators are
required, the following elevator chart must be used to determine the minimum number of
passenger elevators based on the number of stories and residents. Elevator Occupant Load
is calculated by assuming 2 people per bedroom and 1.5 people per each 0-bedroom or
Efficiency unit. Note that service elevators may not be considered for general passenger use
and do not count towards requirements of passenger elevators specified here.
a. If a building requires more than one passenger elevator, elevators must be grouped
together to minimize the impact of service and repair on traffic.
b. Each building segment must be served by at least two elevators, unless the building
requires fewer than two elevators in total.
a. BLDS encourages accommodation of excess capacity so that vital traffic is maintained
when one car is out of service.
REACHREACH REQUIREMENTSREQUIREMENTS
3737
REQUIRED NUMBER OF ELEVATORSREQUIRED NUMBER OF ELEVATORS
25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
600
625
650
675
700
17
18
19
20
1 ELEVATOR
2 ELEVATORS
3+ ELEVATORS
EXAMPLE A
If a multifamily building is 12 stories and has a mix of (60) 0-bedrooms, (25) 1-bedrooms and
(10) 2-bedroom units, the required number of elevators should be calculated as follows:
0-bedroom: 60 x 1.5 = 90
1- bedroom: 25 x 1 x 2 = 50
2-bedroom: 10 x 2 x 2 = 40
total elevator occupant load = 90 + 50 + 40 = 180
Per the chart above, the building requires (2) passenger elevators.
ELEVATOR OCCUPANT LOADELEVATOR OCCUPANT LOAD
# OF STORIES# OF STORIES
Example A
3838
4.3 4.3 COMMON SPACESCOMMON SPACES
BLDS recommends providing a variety of thoughtfully designed and situated common spaces
in all new buildings to the extent that they enhance the tenant experience and promote
resident engagement. However, common spaces must not be so excessive as to reduce the
number, capacity, or quality of residential units in the building. Otherwise, the occupancy and
program of each space should determine its size, finishes, and furniture capacity.
a. Resident Recreation Space must be located adjacent to primary entryways, circulation,
or outdoor space. This space should be adaptive to various uses and have access to
natural light.
b. Laundry Room must be conveniently located and directly accessible from the public
circulation.
c. Childrens Play Room, when provided, must be furnished with safe, durable, and
aesthetically pertinent finishes.
d. Bicycle Storage is required by ZR 25-80 and should be located near circulation and
easily accessible by the tenants.
a. Recreation Spaces should be considered for use as areas of refuge in the event of
prolonged loss of utility service. Such spaces should be powered by an emergency
generator, climate controlled, and equipped with charging stations and refrigerators (for
storing essentials such as medicine).
b. Laundry and Exercise Rooms to be located in areas with direct access to fresh air and
natural light.
c. Childrens Play Room to be visible from other common spaces, such as the laundry room
or tenant recreation space.
d. Storage Area should be provided when possible, and located in a secure and fully
accessible Storage for residents. The storage area should be close to the elevator core.
REQUIREMENTSREQUIREMENTSREACHREACH
The New York City
Zoning Resolution
establishes
minimum areas,
dimensions, and
design requirements
for common spaces
in Quality Housing
buildings, including
tenant recreation
spaces and refuse
storage, and it
incentivizes the
inclusion of laundry
facilities in these
buildings.
3939
SECTION 5 / SECTION 5 / APARTMENT PLANNINGAPARTMENT PLANNING
The following pages describe the unit requirements and calculation methodology. HPD
Program may permit limited variation from these requirements. For consideration,
a proposal must identify known areas of non-compliance no later than the Design
Consultation submission, accompanied by an explanation of the rationale behind design
decisions, project constraints, and other considerations contributing to non-compliance.
Projects receiving Housing Trust Fund (HTF) funding may exceed the maximum allowable
areas, up to the lower end of the unit area ranges required by the New York State Homes
and Community Renewal (HCR) Design Handbook.
5.1 5.1 UNIT DISTRIBUTION & EQUITABILITYUNIT DISTRIBUTION & EQUITABILITY
a. Amenities and resources must be equitably distributed among the dwelling units in a
project. For instance, if any units have in-unit washer/dryers, then all units must have
in-unit washer/dryers.
b. All units must have the same level of access to common areas.
c. In the event that a project comprises of multiple buildings, building segments, or
otherwise duplicative building elements (e.g. multiple lobbies in a large building), such
elements must be designed and operated similarly.
Some projects must separate units into categories, which may be differentiated based
on intended population (senior, supportive housing), financing (in mixed market and
Inclusionary projects), types of accessibility (‘Section 504’ designated units for mobility
impaired / hearing and visually impaired), or by income band, among other distinctions.
These categories must be:
d. Distributed throughout the building and/or project to the maximum extent feasible so as
to maximize options and choice.
e. Distributed both horizontally and vertically (note that Inclusionary projects have
separate specific requirements).
f. In the event of overlapping categories, the requirements must be applied proportionally.
For instance, a project including both market units and Inclusionary affordable units
must apply Section 504 accessibility requirements to the project as a whole, but must
also meet the requirements within the affordable units considered separately.
REQUIREMENTSREQUIREMENTS
5.2 5.2 ADJACENCYADJACENCY
The design of dwelling units must consider not only the unit itself, but the unit situated in
relation to other units in the building, internal circulation patterns, exterior spaces, building
systems and equipment, and other buildings.
a. Unit entrances must be located and designed to preserve the privacy of residents: they
should not abut common areas, should not be visible from prominent windows, and
should not directly face high circulation areas such as elevator cores, doors to common
spaces, or stairs.
b. Unit windows (especially bedroom windows) must not face common areas, public areas,
or mechanical equipment without adequate screening, sound attenuation, and/or vertical
separation.
a. Unit windows should avoid facing directly into other unit or common windows.
REQUIREMENTSREQUIREMENTSREACHREACH
Dwelling unit area calculation refers to the area within the perimeter walls, which includes all
area between the finished surfaces of all exterior walls and demising partitions.
Structural members that are integral components of exterior walls and demising partitions,
as well as all mechanical and plumbing chases will be excluded from area calculations for the
purpose of determining compliance with unit size requirements. Structural members (such
as freestanding columns) that are not integral components of exterior walls or demising
partitions will be included in the unit and room area calculations. PTACs or similar equipment
protruding less than 1’-0” into the space under a window will not be deducted from area
calculations but will be considered for maneuvering clearances.
Room area is calculated to include the space meeting the minimum dimensions stipulated in
the unit design requirements. Room area must generally maintain a minimum 8’-0” ceiling
height. However, BLDS will accept a soffit that reduces ceiling height to no less than 7’-0”
at the perimeter of a room only, and only providing that the space maintains sufficient area
and minimum room dimension at 8’-0” ceiling height to comply with Building Code and other
requirements.
Mechanical and plumbing chases are NOT
included in the unit area.
Measurements are taken to the finished face
of demising partitions and exterior walls.
Structural, mechanical, and plumbing elements
embedded in or protruding from exterior walls
or demising partitions are NOT included in the
unit area.
Freestanding structural elements are
included in the unit area.
Room area only includes spaces with
minimum required dimensions.
UNIT AREA CALCULATIONUNIT AREA CALCULATIONROOM AREA ROOM AREA
CALCULATIONCALCULATION
UNIT AREA CALCULATION DIAGRAMUNIT AREA CALCULATION DIAGRAMROOM AREA CALCULATION DIAGRAMROOM AREA CALCULATION DIAGRAM
Buildings with Supportive Housing units may opt to use Efficiency units throughout the building
in lieu of 0-Bedrooms. Buildings may not include both Efficiency and 0-Bedroom units.
a. The Efficiency unit, is a Class A apartment must consist of the following:
Living Room/ Dining Area /Sleeping Area (LR/DA/SA)
Kitchenette* consisting at minimum of a 30-inch range, 24-inch refrigerator, 24-inch
sink with a 30-inch removable base cabinet, one continuous 30-inch work surface
with removable base cabinets underneath, and adequate wall hung cabinets above
countertops and appliances. Countertop segments must have a minimum width
of nine (9) inches. Base cabinets must be two feet deep and countertops must be
25 inches deep. Shelving must be minimally 11.5 inches deep. This kitchen must be
accessible (see Accessibility Guide). Only electrical appliances will be allowed within
dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Storage including clothing closets, linen closets, pantry, and/or bulk storage. All
clothing closets must be at least two (2) feet deep. The clothing closet space may be
divided, but must total no less than four (4) feet wide, and no segment may be less
than two (2) feet wide. Separate linen closets are encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
4242
5.3 5.3 DESIGN REQUIREMENTS FOR EFFICIENCY UNITSDESIGN REQUIREMENTS FOR EFFICIENCY UNITS
EfficiencyEfficiency
AreaArea 160 sf 10 sf 300-350 sf**
Min. Dim.Min. Dim. 9’-0”
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
Efficiency Units in buildings containing any Affordable Independent Residences for Seniors (AIRS) units must be
minimally 325 sf.
see description -
LR/SA/DALR/SA/DA STORAGESTORAGE TARGET NETTARGET NET
REQUIREMENTSREQUIREMENTS
4343
326 SF326 SF
343 SF343 SF 343 SF343 SF
335 SF335 SF
LR/SA/DALR/SA/DA
170 SF170 SF
LR/SA/DALR/SA/DA
191 SF191 SF
>=>= min. dimension min. dimension
<< min. dimension min. dimension
LR/SA/DALR/SA/DA
163 SF163 SF
LR/SA/DALR/SA/DA
175 SF175 SF
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
Efficiency Unit DiagramsEfficiency Unit Diagrams
UNIT EFF-aUNIT EFF-a
UNIT EFF-cUNIT EFF-c UNIT EFF-dUNIT EFF-d
UNIT EFF-bUNIT EFF-b
Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
a. The 0-Bedroom unit, is a Class A apartment must consist of the following:
Living Room/ Dining Area /Sleeping Area (LR/DA/SA)
Kitchenette* consisting at minimum of a 30-inch range, 24-inch refrigerator, 24-inch
sink with a 30-inch removable base cabinet, one continuous 30-inch work surface
with removable base cabinets underneath, and adequate wall hung cabinets above
countertops and appliances. Countertop segments must have a minimum width
of nine (9) inches. Base cabinets must be two feet deep and countertops must be
25 inches deep. Shelving must be minimally 11.5 inches deep. This kitchen must be
accessible (see Accessibility Guide). Only electrical appliances will be allowed within
dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Storage including clothing closets, linen closets, pantry, and/or bulk storage. All
clothing closets must be at least two (2) feet deep. The clothing closet space may be
divided but must total no less than four (4) feet wide, and no segment may be less
than two (2) feet wide. Separate linen closets are encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
4444
0-BR0-BR
AreaArea 200 sf 10 sf 350-400 sf**
Min. Dim.Min. Dim. 9’-0”
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
see description -
LR/SA/DALR/SA/DA STORAGESTORAGE TARGET NETTARGET NET
5.4 5.4 DESIGN REQUIREMENTS FOR 0-BEDROOM UNITSDESIGN REQUIREMENTS FOR 0-BEDROOM UNITS
REQUIREMENTSREQUIREMENTS
4545
359 SF359 SF
361 SF361 SF
Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
351 SF351 SF
UNIT 0-aUNIT 0-a
UNIT 0-cUNIT 0-c
UNIT 0-bUNIT 0-b
0-Bedroom Unit Diagrams0-Bedroom Unit Diagrams
LR/SA/DALR/SA/DA
208 SF208 SF
LR/SA/DALR/SA/DA
200 SF200 SF
LR/SA/DALR/SA/DA
207 SF207 SF
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
4646
a. The 1-Bedroom unit is a Class A apartment must consist of the following:
Bedroom with a closet, allowing flexible furniture arrangement.
Living Room / Dining Area allowing suitable furniture placement
Kitchen / Kitchenette* consisting at minimum of a 30-inch range, 24-inch
refrigerator, 24-inch sink with a 30-inch removable base cabinet, base cabinets
with at least three (3) linear feet of countertop surface (including one continuous
30-inch work surface with removable base cabinets underneath), and adequate
wall hung cabinets over countertops and appliances. Countertop segments must
have a minimum width of nine (9) inches. Base cabinets must be two feet deep and
countertops must be 25 inches deep. Shelving must be minimally 11.5 inches deep.
This room must be accessible (see Accessibility Guide). Only electrical appliances will
be allowed within dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Storage including clothing closets, linen closets, pantry, and/or bulk storage.
All clothing closets must be at least two (2) feet deep. The clothing closet space
may be divided but must total no less than four (4) feet wide, and no segment
may be less than two (2) feet wide. BLDS recommends providing a variety of
closet configurations in similar layouts when possible. Separate linen closets are
encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
1-BR1-BR
AreaArea 170 sf 12 sf 500-550 sf110 sf
Min. Dim.Min. Dim. 9’-0” see description9’-6”
LR/DALR/DA STORAGESTORAGE TARGET NETTARGET NETBRBR
-
5.5 5.5 DESIGN REQUIREMENTS FOR 1-BEDROOM UNITSDESIGN REQUIREMENTS FOR 1-BEDROOM UNITS
REQUIREMENTSREQUIREMENTS
4747
1-Bedroom Unit Diagrams1-Bedroom Unit Diagrams
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
LR/DALR/DA
176 SF176 SF
LR/DALR/DA
183 SF183 SF
BRBR
115 SF115 SF
BRBR
126 SF126 SF
513 SF513 SF
UNIT 1-bUNIT 1-b Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
514 SF514 SF
UNIT 1-aUNIT 1-a
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
4848
518 SF518 SF
504 SF504 SF
UNIT 1-cUNIT 1-c
UNIT 1-dUNIT 1-d
LR/DALR/DA
170 SF170 SF
LR/DALR/DA
177 SF177 SF
BRBR
147 SF147 SF
BRBR
118 SF118 SF
1-Bedroom Unit Diagrams1-Bedroom Unit Diagrams
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
4949
Image Credits: Dunn Development
5050
a. The 2-Bedroom unit is a Class A apartment must consist of the following:
Bedrooms, each with a closet, allowing flexible furniture arrangement.
Living Room / Dining Area allowing suitable furniture placement
Kitchen / Kitchenette* consisting at minimum of a 30-inch range, 30-inch
refrigerator, 24-inch sink with a 30-inch removable base cabinet, base cabinets
with at least three (3) linear feet of countertop surface, (including one continuous
30-inch work surface with removable base cabinets underneath), and adequate
wall hung cabinets over countertops and appliances. Countertop segments must
have a minimum width of nine (9) inches. Base cabinets must be two feet deep and
countertops must be 25 inches deep. Shelving must be minimally 11.5 inches deep.
This room must be accessible (see Accessibility Guide). Only electrical appliances will
be allowed within dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Storage including clothing closets, linen closets, pantry, and/or bulk storage.
All clothing closets must be at least two (2) feet deep. The clothing closet space
may be divided but must total no less than eight (8) feet wide, and no segment
may be less than two (2) feet wide. BLDS recommends providing a variety of
closet configurations in similar layouts when possible. Separate linen closets are
encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
2-BR2-BR
AreaArea 170 sf 20 sf 650-725 sf110 sf 100 sf
Min. Dim.Min. Dim. 10’-0” see description9’-6” 9’-0”
LR/DALR/DA STORAGESTORAGE TARGET NETTARGET NETBRBR BR2BR2
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
-
5.6 5.6 DESIGN REQUIREMENTS FOR 2-BEDROOM UNITSDESIGN REQUIREMENTS FOR 2-BEDROOM UNITS
REQUIREMENTSREQUIREMENTS
5151
2-Bedroom Unit Diagrams2-Bedroom Unit Diagrams
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
719 SF719 SF
UNIT 2-bUNIT 2-b
705 SF705 SF
UNIT 2-aUNIT 2-a
LR/DALR/DA
170 SF170 SF
LR/DALR/DA
176 SF176 SF
BRBR
111 SF111 SF
BRBR
128 SF128 SF
BRBR
101 SF101 SF
BRBR
107 SF107 SF
Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
5252
653 SF653 SF
679 SF679 SF
UNIT 2-cUNIT 2-c
UNIT 2-dUNIT 2-d
LR/DALR/DA
191 SF191 SF
LR/DALR/DA
170 SF170 SF
BR 2BR 2
100 SF100 SF
BR 1BR 1
140 SF140 SF
BR 1BR 1
116 SF116 SF
BR 2BR 2
100 SF100 SF
2-Bedroom Unit Diagrams2-Bedroom Unit Diagrams
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
5353
Image Credits: Leong Leong ArchitectsImage Credits: Dattner Architects
5454
a. The 3-Bedroom unit is a Class A apartment must consist of the following:
Bedrooms, each with a closet, allowing flexible furniture arrangement.
Living Room / Dining Area allowing suitable furniture placement
Kitchen / Kitchenette* consisting at minimum of a 30-inch range, 30-inch
refrigerator, 24-inch sink with a 30-inch removable base cabinet, base cabinets
with at least three (3) linear feet of countertop surface (including one continuous
30-inch work surface with removable base cabinets underneath), and adequate
wall-hung cabinets over countertops and appliances. Countertop segments must
have a minimum width of nine (9) inches. Base cabinets must be two feet deep and
countertops must be 25 inches deep. Shelving must be minimally 11.5 inches deep.
This room must be accessible (see Accessibility Guide). Only electrical appliances will
be allowed within dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Secondary Bathroom / Half-bath minimally containing a sink and toilet.
Storage including clothing closets, linen closets, pantry, and/or bulk storage.
All clothing closets must be at least two (2) feet deep. The clothing closet space
may be divided but must total no less than twelve (12) feet wide, and no segment
may be less than two (2) feet wide. BLDS recommends providing a variety of
closet configurations in similar layouts when possible. Separate linen closets are
encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
3-BR3-BR
AreaArea 170 sf 26 sf 850-950 sf110 sf 100 sf 100 sf
Min. Dim.Min. Dim. 10’-0” see description9’-6” 9’-0” 9’-0”
LR/DALR/DA STORAGESTORAGE TARGET NETTARGET NETBRBR BR2BR2 BR3BR3
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
-
5.7 5.7 DESIGN REQUIREMENTS FOR 3-BEDROOM UNITSDESIGN REQUIREMENTS FOR 3-BEDROOM UNITS
REQUIREMENTSREQUIREMENTS
5555
857 SF857 SF
UNIT 3-bUNIT 3-b
887 SF887 SF
UNIT 3-aUNIT 3-a
LR/DALR/DA
177 SF177 SF
LR/DALR/DA
198 SF198 SF
BR 1BR 1
110 SF110 SF
BR 1BR 1
123 SF123 SF BR 2BR 2
111 SF111 SF
BR 3BR 3
111 SF111 SF
BR 2BR 2
102 SF102 SF
BR 3BR 3
102 SF102 SF
3-Bedroom Unit Diagrams3-Bedroom Unit Diagrams
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
5656
937 SF937 SF
UNIT 3-cUNIT 3-c Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
LR/DALR/DA
170 SF170 SF
BR 1BR 1
110 SF110 SF
BR 2BR 2
101 SF101 SF
BR 3BR 3
101 SF101 SF
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
3-Bedroom Unit Diagrams3-Bedroom Unit Diagrams
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
5757
Image Credits: Iwan BaanImage Credits: Dattner Architects
5858
a. The 4-Bedroom unit is a Class A apartment consisting of the following:
Bedrooms, each with a closet, allowing flexible furniture arrangement.
Living Room / Dining Area allowing suitable furniture placement
Kitchen / Kitchenette* consisting at minimum of a 30-inch range, 30-inch
refrigerator, 24-inch sink with a 30-inch removable base cabinet, base cabinets
with at least three (3) linear feet of countertop surface (including one continuous
30-inch work surface with removable base cabinets underneath), and adequate
wall-hung cabinets over countertops and appliances. Countertop segments must
have a minimum width of nine (9) inches. Base cabinets must be two feet deep and
countertops must be 25 inches deep. Shelving must be minimally 11.5 inches deep.
This room must be accessible (see Accessibility Guide). Only electrical appliances will
be allowed within dwelling units (including ranges, ovens, etc.).
Bathroom containing a bathtub and/or shower with a showerhead, a sink, and a
toilet. This bathroom must be accessible (see Accessibility Guide).
Secondary Bathroom / Half-bath minimally containing a sink and toilet.
Storage including clothing closets, linen closets, pantry, and/or bulk storage. All
clothing closets must be at least two (2) feet deep. The clothing closet space may be
divided but must total no less than twelve (12) feet wide, and no segment may be less
than two (2) feet wide. BLDS recommends providing a variety of closet configurations
in similar layouts when possible. Separate linen closets are encouraged.
Office or Workspace (optional) designating a space with minimum dimensions of
4’-0” x 5’-0” not overlapping with other required spaces, circulation, or maneuvering
clearances, and provided with an electrical outlet. Units with such spaces may
exceed the maximum target net area by up to 25 sf.
b. The areas in the following table describe minimum areas and dimensions to the inside
finished surfaces of the walls and partitions. All spaces must be accessible. All doors
must be 3’-0” wide minimum along accessible routes.
3-BR3-BR
AreaArea 170 sf 32 sf 950-1075 sf110 sf 100 sf 88 sf
Min. Dim.Min. Dim. 10’-0” see description9’-6” 9’-0” 9’-0”
LR/DALR/DA STORAGESTORAGE TARGET NETTARGET NETBRBR BR2 & 3BR2 & 3 BR4BR4
*Requirements for appliance sizes are listed as absolutes, but nominal sizing may be applied, especially in the case
of high-quality appliances. Verify market availability of selected appliances and provide product dimensions
**Units designed to the
Universal Federal Accessibility Standards
, in accordance with Section 504 of the
Rehabilitation Act of 1973
, and all units in vertical line with such units, may exceed target net area by up to 25 sf.
-
5.8 5.8 DESIGN REQUIREMENTS FOR 4-BEDROOM UNITSDESIGN REQUIREMENTS FOR 4-BEDROOM UNITS
REQUIREMENTSREQUIREMENTS
5959
4-Bedroom Unit Diagrams4-Bedroom Unit Diagrams
1,070 SF1,070 SF
UNIT 4-bUNIT 4-b
1,016 SF1,016 SF
UNIT 4-aUNIT 4-a Section 504 Mobility Impaired UnitSection 504 Mobility Impaired Unit
LR/DALR/DA
195 SF195 SF
LR/DALR/DA
175 SF175 SF
BR 1BR 1
111 SF111 SF
BR 1BR 1
120 SF120 SF
BR 2BR 2
101 SF101 SF
BR 2BR 2
101 SF101 SF
BR 3BR 3
101 SF101 SF
BR 4BR 4
101 SF101 SF
BR 3BR 3
111 SF111 SF
BR 4BR 4
110 SF110 SF
Drawings for illustrative purposes; refer to Guideline text and other applicable regulations for requirements
ROOM AREAROOM AREA
DWELLING UNIT AREADWELLING UNIT AREA
6060
EFF.EFF.
0-BR0-BR
1-BR1-BR
2-BR2-BR
3-BR3-BR
4-BR4-BR
AreaArea
AreaArea
AreaArea
AreaArea
AreaArea
AreaArea
160 sf
200 sf
170 sf
170 sf
170 sf
170 sf
10 sf
10 sf
12 sf
20 sf
26 sf
26 sf
300-350 sf
350-400 sf
500-550 sf
650-725 sf
850-950 sf
950-1075 sf
110 sf
110 sf
110 sf
110 sf
100 sf
100 sf
100 sf
100 sf
100 sf 88 sf
Min. Dim.Min. Dim.
Min. Dim.Min. Dim.
Min. Dim.Min. Dim.
Min. Dim.Min. Dim.
Min. Dim.Min. Dim.
Min. Dim.Min. Dim.
9’-0”
9’-0”
9’-0”
10’-0”
10’-0”
10’-0”
- -
-
-
-
-
-
-
-
-
-
-
9’-6”
9’-6”
9’-6”
9’-6”
9’-0”
9’-0”
9’-0”
9’-0”
9’-0” 9’-0”
LR/SA/DALR/SA/DA
LR/SA/DALR/SA/DA
LR/DALR/DA
LR/DALR/DA
LR/DALR/DA
LR/DALR/DA
STORAGESTORAGE
STORAGESTORAGE
STORAGESTORAGE
STORAGESTORAGE
STORAGESTORAGE
STORAGESTORAGE
TARGET NETTARGET NET
TARGET NETTARGET NET
TARGET NETTARGET NET
TARGET NETTARGET NET
TARGET NETTARGET NET
TARGET NETTARGET NET
BRBR
BRBR
BRBR
BRBR
BR2BR2
BR2BR2
BR2BR2
BR3BR3
BR3BR3 BR4BR4
HPD DESIGN GUIDELINES UNIT SIZE SUMMARY CHARTHPD DESIGN GUIDELINES UNIT SIZE SUMMARY CHART
6161
CHAPTER 4
PROGRAMPROGRAM
REQUIREMENTSREQUIREMENTS
6262
HPD recognizes that the best design solutions for 1–3 family homes may require flexibility
in size and minimum dimensions relative to larger multifamily buildings. Units in 1-3 family
homes may deviate from the Guidelines in the following ways:
The area of any individual room in a 1-3 family home may be as much as 10 sf less
than the minimum required by the Guidelines.
One minimum dimension (but not both) of any individual room in a 1-3 family home
may be as much as 6 inches less than the minimum dimension required by the
Guidelines.
Situations requiring special consideration beyond these allowances require advance notice
to HPD Program project management and possibly a Design Consultation with HPD Program
and BLDS.
Applicable accessibility requirements are outlined in the Accessibility section of this
document and in greater detail in the
HPD Accessibility Guide
. However, please note that some of
the requirements may have thresholds that affect how they are applied to smaller buildings.
New York City Building Code
defines a Multiple Dwelling as a building with three or more
families living independently, while the
Fair Housing Act
applies to structures containing
four or more units. Section 504 of the
Rehabilitation Act of 1973
applies to projects of five
or more units: when projects involve multiple buildings, even if they are smaller, the statute
would apply, and may require the designated mobility- and hearing/vision-impaired units
to be located within smaller structures. In any scenario requiring accessible units, an
accessible path to the ground floor must also be provided.
Due to the divergent demands of homeownership relative to rental programs, HPD applies
some design requirements uniquely to the units included in the homeownership programs.
a. All units designed for homeownership projects (whether the unit itself is owner’s unit or
is a rental unit in a homeownership building) must include the necessary infrastructure
and hook-ups for dishwashers and clothing washers and dryers in the units.
b. All units must also comply with the following unit size requirements:
SECTION 1 /SECTION 1 / HOMEOWNERSHIP HOMEOWNERSHIP
SECTION 2 /SECTION 2 / 1-3 FAMILY HOMES 1-3 FAMILY HOMES
ACCESSIBILITYACCESSIBILITY
UNIT TYPEUNIT TYPE
0-BR0-BR 400 sf
550 sf
725 sf
950 sf
1075 sf
475 sf
650 sf
825 sf
1050 sf
1175 sf
1-BR1-BR
2-BR2-BR
3-BR3-BR
4-BR4-BR
MINIMUMMINIMUM MAXIMUMMAXIMUM
6363
Supportive Housing is permanent, affordable housing with on-site support services to serve
the needs of the most vulnerable New Yorkers, including homeless individuals and people
with disabilities. Apartments are rent-stabilized and buildings are owned and operated by
experienced community organizations that maintain a high standard of property management.
Projects are typically filed under R-2 Residential Occupancy Group
As per Department of Buildings Bulletin 2011-003, projects that contain a minimum of 60%
Supportive dwelling units may be classified as Use Group 3 buildings (Non-Profit Institution
with Sleeping Accommodations). However, projects may contain a combination of Use Group
3 and Use Group 2 (Residential).
Note that a 50-unit minimum is preferred for SHLP buildings.
HPD finances the construction of supportive housing through many loan programs including
the Supportive Housing Loan Programs. Supportive housing may be included in any HPD
loan program that includes a homeless set-aside.
a. One dwelling unit must be provided on-site for a building superintendent as required by
Housing Maintenance Code.
b. Projects must provide community space for building residents and space for social
services when appropriate.
c. Security personnel must be present at all times.
d. On-site support services that foster a sense of well-being and safety are required
for all SHLP projects. These social service spaces should be located for ideal tenant
engagement while also optimizing the proposed floor area for residential units.
a. Program offices may have to be located in the basement due to the limited floor area.
b. Natural lighting where physically and economically viable should be maximized so
that offices are inviting for tenants and staff (possibly with lightwells). Program offices
should also be carefully designed to ensure the privacy of the tenants.
c. A multi-purpose room should also be located in high circulation areas for tenant
engagement and have access to natural light. This room should be adaptive to various
uses and accommodate different groups of tenants simultaneously.
d. It is suggested that a common kitchen is also provided in this room as it is often a great
way to bring people together with cooking classes, wellness seminars, and events
around food. Other common spaces with less therapeutic functions, such as a laundry
room, storage room, exercise room, etc. may be placed in the basement, or away from
high circulation areas, as tenants will seek these rooms out if they need to.
SECTION 3 /SECTION 3 / SUPPORTIVE HOUSING SUPPORTIVE HOUSING
REQUIREMENTSREQUIREMENTS CODE & ZONINGCODE & ZONINGREACHREACH
6464
A 75-unit minimum is preferred for participation in HPD SARA Program. Projects may
include studio and 1BR apartments.
Projects are typically filed under either:
Residential Use Group 2 Affordable Independent Residences for Seniors (AIRS), or
Residential Use Group 2, utilizing Quality Housing bonuses.
ZR23-23 requires that AIRS dwelling units have a minimum net area of 325 sf.
Projects should try to use a non-AIRS zoning designation for their required 30% homeless
set aside, in order to potentially support a 55+ age restriction. This can be either UG2 Income
Restricted Housing Units (IRHUs) or, if the homeless units are supportive homeless units
(15/15 or ESSHI), then UG3 units.
a. One unit must be provided on-site for a building superintendent.
b. Projects must provide community space for building residents and space for social
services.
c. Building must provide an emergency back-up power supply (e.g. back-up generator) and
a Place of Refuge (see Resiliency Section 2.4 of this document).
d. Handrails throughout the corridors (on both sides) must be provided.
e. Bathrooms must be outfitted for the mobility-impaired use at the time of construction.
Grab bars must be installed for all apartment bathrooms.
f. Showers that are walk-in or no-threshold instead of bathtubs must be provided.
Collapsible shower lips will be accepted only if they do not obstruct the required
maneuvering clearances in the bathroom.
g. Provide accessible appliances (self-cleaning ranges with front controls and accessible
refrigerators) for all units.
h. Provide hardware that is lever-type for doors, sinks, showers/baths, and toilets.
i. Provide cabinets that are self-closing with D-type pulls.
Many adults prefer to live in their own home and community as they age, wishing to live safely,
comfortably, and independently for as long as possible. The population of city residents who
are at least 65 years old is projected to increase by 40 percent between 2010 and 2040. This
means that we will need to house more than 400,000 additional seniors in the coming years.
Our seniors are more likely to be low-income, to be rent-burdened, and to live on a fixed
income than other city residents.
SECTION 4 /SECTION 4 / SENIOR HOUSING SENIOR HOUSING
CODE & ZONINGCODE & ZONINGREQUIREMENTSREQUIREMENTS
Note that these
requirements apply to
AIRS Dwelling Units
regardless of HPD
Program affiliation.
6565
REACHREACH
a. The project should provide convenient, comfortable seating areas near the residential
entry, situated to maximize views of outdoor activity and pedestrian areas.
b. The social service area should be in a prominent location so that tenants are more likely
to participate in events, programming, and services. Within the building, a high degree of
social interaction should be encouraged, and community areas should be programmed
to allow for a variety of activities.
c. Circulation space throughout the common areas should comfortably accommodate
occupants with limited mobility, including those using walkers, canes, and wheelchairs.
Proposed furniture should facilitate senior use and be adaptive in terms of heights,
angles, and appropriate clearances
d. All floors should be slip-resistant. Soft, resilient interior flooring materials such as
cork, rubber, or linoleum should be used throughout the building.
e. Frequently used doors and passageways should be emphasized by the use of different
colors and textures for guidance.
f. Units should be designed to accommodate two persons.
g. Provide light switches that are easily identifiable in the dark or illuminated.
h. A master or three- way switch adjacent to the bed is suggested.
i. Under-cabinet kitchen lighting should be considered.
6666
The Inclusionary Housing Program (IHP) is designed to preserve and promote affordable
housing within neighborhoods where zoning has been modified to encourage new
development. There are two types of Inclusionary Housing: voluntary and mandatory.
HPD’s Voluntary Inclusionary Housing (VIH) Program was created in 1987 to encourage
economically integrated communities and incentivize the creation or preservation of affordable
housing in certain areas, including R10 districts Inclusionary Housing Designated Areas, and
Special Districts. The program offers a density bonus for developments that provide permanently
affordable housing. The bonus floor area generated by providing affordable housing can be
used either on the bonus-generating affordable site or transferred off-site, within the same
Community District as the bonus development, or within a half-mile. Additional information
regarding the Voluntary Inclusionary Housing Program is available online at
https://www1.nyc.gov/site/hpd/services-and-information/inclusionary-housing.page
HPD’s Mandatory Inclusionary Housing (MIH) Program, created in 2016, requires a share of
new housing in medium- and high-density areas that are rezoned to promote new housing
production—whether rezoned as part of a city neighborhood plan or a private rezoning
application—to be permanently affordable. The requirement applies to new construction
developments with more than 10 dwelling units or an area greater than 12,500 sf. Additional
information regarding the Mandatory Inclusionary Housing Program is available online at
https://www1.nyc.gov/site/hpd/services-and-information/inclusionary-housing.page
For development proposals in the Mandatory Inclusionary Housing Program, BLDS reviews
the project to verify compliance with Section 23-154 of the
New York City Zoning Resolution
.
Refer to Chapter 41 of the Rules of the City of New York. In addition, projects are reviewed for
compliance with accessibility regulations.
SECTION 5 /SECTION 5 /
INCLUSIONARY HOUSING PROGRAM REQUIREMENTSINCLUSIONARY HOUSING PROGRAM REQUIREMENTS
6767
SECTION 5 /SECTION 5 /
INCLUSIONARY HOUSING PROGRAM REQUIREMENTSINCLUSIONARY HOUSING PROGRAM REQUIREMENTS
Projects that are developed under HPD’s Inclusionary Housing Program must be designed
in accordance with the requirements set forth in the New York City Zoning Resolution,
Section 23-96, “Requirements for Generating Sites.” This section describes requirements
for unit sizes, vertical and horizontal distribution of affordable units, and proportion of
affordable units to market-rate units. Information that demonstrates compliance with these
requirements must be provided by the development team on the four charts described below.
6.1 6.1 CHART A: VERTICAL DISTRIBUTIONCHART A: VERTICAL DISTRIBUTION
For compliance with ZR 23-96 (b) (1). Inclusionary Housing Affordable Dwelling Units (IH
Apartments) shall be distributed on a minimum of sixty-five percent (65%) of the residential
floors.
6.2 6.2 CHART B: HORIZONTAL DISTRIBUTIONCHART B: HORIZONTAL DISTRIBUTION
For compliance with ZR 23-96 (b) (2). VIH Apartments shall comprise not more than one-
third (33.3%) of the apartments on each residential story of the generating site. However, on
a residential story where there are fewer than three apartments, only one apartment may be
a VIH Apartment, unless no less than one apartment on each floor is a VIH Apartment.
6.3 6.3 CHART C: UNIT MIX (BEDROOM MIX)CHART C: UNIT MIX (BEDROOM MIX)
For compliance with ZR 23-96 (c) (1) (i). IH Apartments shall contain a bedroom mix at
least proportional to the bedroom mix of apartments in the generating site that are not IH
Apartments.
-or-
For compliance with ZR 23-96 (c) (1) (ii) [for any mix of non-IH Units] not less than fifty
percent (50%) of the apartments that are IH Apartments shall contain two bedrooms or
more, and not less than seventy-five percent (75%) of the apartments that are IH Apartments
shall contain one or more bedrooms.
-and-
For compliance with ZR 23-96 (c) (2) [for 100% IH standalone] where all of the apartments in
a generating site are IH Apartments, not less than fifty percent (50%) of such IH Apartments
shall contain two or more bedrooms and not less than seventy-five percent (75%) of such IH
Apartments shall contain one or more bedrooms.
SECTION 6 /SECTION 6 /
INCLUSIONARY HOUSING DESIGN REQUIREMENTSINCLUSIONARY HOUSING DESIGN REQUIREMENTS
Be advised that the
Horizontal Distribution
requirement is not
applicable to MIH
stand-alone Projects
and MIH Hybrid
Projects.
Note that HPD
Inclusionary Program
is requiring within 1%
tolerance if using this
Proportionality option.
Deviations might
be entertained in
preference for larger
family units, only at
the written request
and consent from HPD
Inclusionary Program.
6868
6.4 6.4 UNIT SIZESUNIT SIZES
For compliance with ZR 23-96 (d) (1). Minimum apartment sizes relative to the number of
bedrooms are required for IH Apartments:
400 square feet of floor area for zero-bedroom (0-br) apartments
575 square feet of floor area for one-bedroom (1-br) apartments
775 square feet of floor area for two-bedroom (2-br) apartments
950 square feet of floor area for three-bedroom (3-br) apartments
For 100% Mandatory Inclusionary Housing with Market Rate units: Pursuant to the Average
Unit Size requirement for Mandatory Inclusionary Housing of the latter part of ZR 23-96(d)
(1), 100% of the affordable units of all varied bedroom counts must be equal or greater
than the average size of dwelling units that are non-Inclusionary Housing units (Market
Rate) with the same number of bedrooms. Unit Size Charts must be detailed adequately to
show net square footages of all proposed units, including apartment distribution totals for
Inclusionary and non-Inclusionary units, with their corresponding average unit sizes.
6.5 6.5 PROPORTIONALITY OF SECTION 504 UNITSPROPORTIONALITY OF SECTION 504 UNITS
BLDS requests that the Section 504 apartments be distributed proportionally across all
affordability brackets, to include both Inclusionary and non-Inclusionary apartments. See
following calculations for example only:
45 MIH / 200 Total DU = 22.5%
“Mobility Impaired” (5% = 10 required)
MIH: 10 x .225 = 2 min. is required
Non-MIH: 8 max. is suggested
Audio/Visual Impaired” (2% = 4 required)
MIH: 4 x .225 = 1 min. is required
Non-MIH: 3 max. is suggested
6.6 6.6 BUILDING PLANNINGBUILDING PLANNING
The configuration of a building determines how its unit distribution and unit mix will be
analyzed for compliance with unit distribution and unit mix requirements pursuant to
Section 23-90:
Inclusionary Housing Program
of the
New York City Zoning Resolution
.
Following are various building configurations with the quantity and types of distribution and
unit mix charts required for Design Review submissions:
A BUILDING CONSISTING OF A SINGLE TOWER WITH ONE MAIN RESIDENTIAL A BUILDING CONSISTING OF A SINGLE TOWER WITH ONE MAIN RESIDENTIAL
ENTRANCEENTRANCE
One (1) Chart A, Vertical Distribution
One (1) Chart B, Horizontal Distribution
One (1) Chart C, Unit Mix
One (1) Unit Size Chart
Note: Projects with
a mixture of IH and
other affordable units
complying with the
unit sizes specified
in this document
may receive a waiver
from the Inclusionary
Housing Program size
requirements.
6969
A THROUGHA THROUGH
--
LOT BUILDING CONSISTING OF TWO TOWERS CONNECTED AT THE LOT BUILDING CONSISTING OF TWO TOWERS CONNECTED AT THE
FIRST FLOOR WITH OR WITHOUT SEPARATE RESIDENTIAL ENTRANCESFIRST FLOOR WITH OR WITHOUT SEPARATE RESIDENTIAL ENTRANCES
Each tower forms the street line for its respective street and is separated above the
first floor by a courtyard and open space. Corresponding residential stories (floor
to ceiling heights) at each tower may or may not align. IH Apartments are located in
each tower.
One (1) Chart A, Vertical Distribution, for each tower
One (1) Chart B, Horizontal Distribution, for each tower
One (1) Chart C, Unit Mix, for the total building
One (1) Unit Size Chart
A BUILDING CONSISTING OF MULTIPLE BUILDING SEGMENTS OF WHICH ONE A BUILDING CONSISTING OF MULTIPLE BUILDING SEGMENTS OF WHICH ONE
BUILDING SEGMENT IS DESIGNATED WITH ALL IH APARTMENTSBUILDING SEGMENT IS DESIGNATED WITH ALL IH APARTMENTS
One (1) Chart A, Vertical Distribution, for the building segment with the IH Apts.
Chart B, Horizontal Distribution, is not applicable because the total building segment
is designed with IH Apts.
One (1) Chart C, Unit Mix, in compliance with
ZR 23-96 (c) (1) (ii)
for the building
segment with all IH Apts.
One (1) Unit Size Chart
Note: The above information shall not be construed to limit the number and / or type
of unit distribution and unit mix charts that may be required or requested for the
review and processing of an Inclusionary Housing Program project application.
Common laundry facilities must be provided if individual apartment washer / dryers
units are not provided.
Parity must be achieved when providing building amenities and determining the use
of such spaces by residents of the Inclusionary Housing units.
7070
CHAPTER 5
APPENDICESAPPENDICES
7171
CHAPTER 5
7272
APPENDIX 1APPENDIX 1 HPD BLDS New Construction Design ConsultationHPD BLDS New Construction Design Consultation
Submission Checklist Submission Checklist
Document Version 4.18.2024
HPD BLDS New Construction Design Consultation
Submission Checklist
HPD PROJECT ID
___________________________________________________________________________________
PROJECT NAME ___________________________________________________________________________________
PROJECT ADDRESS ___________________________________________________________________________________
PRE-ULURP DESIGN CONSULTATION? _________________________________________________________________
PROJECT SUMMARY WORKBOOK
As an Excel file and named: [borough]_[block]_[project name]_DGW-NC_2.xlsx
HPD New Construction Design Guidelines Workbook, filled out through Milestone 2 (Mandatory Design Consultation).
DRAWINGS
Combined as a single PDF and named: [borough]_[block]_[project name]_DWGS.pdf
REQUIRED FOR ALL DESIGN CONSULTATIONS (INCLUDING PRE-ULURP SUBMISSIONS)
Submission Checklist (this document, filled-out). This must be the first sheet in the ‘Drawings’ file.
Pre-Construction Accessibility Statement confirming that the project complies with the applicable accessibility requirements.
Renderings illustrating the proposed design from a variety of viewpoints, especially from sidewalk level at bordering streets.
Area Plan depicting the site and context, including blocks, lots, building outlines, nearby amenities, notable landmarks, five block
transit stop radii, and direction of traffic.
Tax Map using the DOF tax map as a base, depicting how proposed actions affect the tax lots within and surrounding the Project
Area and Development Site (see DCP document description online).
Photographs depicting the site(s) and the relation to surroundings, keyed to a plan (may include images from online sources).
Site Plan indicating the context of the development within nearest street intersection(s), including site boundaries & restrictions,
buildings, access points, adjacent structures, roads, sidewalks, parking, driveways, elevation grades, hard and soft surfaces, tree
locations, landscaping, fences, gates, lighting, easements, and encroachments.
Zoning Analysis locating the project on a zoning map, citing all pertinent sections of the zoning resolution, and including permitted
and proposed uses, unit density, FAR, bulk, lot coverage, height, setbacks, vehicle and bicycle parking, etc.
Building Code Summary indicating project strategy for compliance with building code highlighting questions and/or conflicts for
discussion, including for projects defined as “flood-prone” per the Design Guidelines. Note that projects subject to Appendix G
have additional compliance requirements based on HPD’s Design Guidelines. Projects seeking Waivers from this requirement will
be required to submit a Design Waiver demonstrating why compliance is infeasible.
Floor Plans representing all floors of the proposed development (cellar/basement, street level, typical floor, upper floors, and roof
plan, etc.); clear labeling of all community and common spaces; clear labeling of all rooms with names, dimensions, and area; and
clear labeling of each unit with a unique name and total net area.
Elevation Drawings representing all exterior elevations of the proposed development; indicating materials, ceiling heights, floor
elevation levels, and total building height; labeling all elements, and indicating existing adjacent and proximate buildings to
illustrate the context.
PROJECT STAMP
HPD USE ONLY
PROJECT THUMBNAIL
--
7373
Document Version 4.18.2024
REQUIRED FOR DESIGN CONSULTATIONS (NOT REQUIRED FOR PRE-ULURP SUBMISSIONS)
City Planning Commission (CPC) Reports and Presentation including any suggestions or notes from CPC for projects that have
previously gone through a Uniform Land Use Review Procedure (ULURP), if available.
Section 504 Unit Designation Table identifying and locating units that comply with the requirements of Section 504 of the
Rehabilitation Act of 1973.
Enlarged Detail Plans for Section 504-Designated Units
Accessibility Detail Drawings for all kitchens, bathrooms, single-user toilets, multi-user toilet rooms, elevators, mailboxes,
common/public laundry rooms, trash/recycling rooms, locker rooms, including plans, elevations, and door schedules, all of which
demonstrate compliance with Chapter 11 of
New York City Building Code
, the federal
Fair Housing Act
, and Section 504 of the
Rehabilitation Act of 1973
.
INCLUSIONARY PROJECTS MUST INCLUDE THE FOLLOWING CHARTS (NOT REQUIRED FOR PRE-ULURP SUBMISSIONS)
Chart A Vertical Unit Distribution
Chart B Horizontal Unit Distribution (VIH only)
Chart C Unit Bedroom Mix
Chart D Unit Size
Chart E Average Unit Size (MIH Hybrid only)
For Inclusionary Projects proposing both inclusionary and market rate buildings, all buildings must be included in the site plan
(including all proposed building entries) and in project renderings.
DOCUMENTS
Combined as a single PDF and named: [borough]_[block]_[project name]_DOCS.pdf
REQUIRED FOR ALL DESIGN CONSULTATIONS (INCLUDING PRE-ULURP SUBMISSIONS)
Architect Written Response from previous BLDS Design Consultation or Design Review (for resubmission only).
Topographic & Utility Survey by a licensed land surveyor.
Geotechnical Report & Preliminary Boring Logs (if available)
FEMA Base Flood Elevation Map identifying and delineating Special Flood Hazard Area by Zone. This must be the most current
published map.
REQUIRED FOR DESIGN CONSULTATIONS (NOT REQUIRED FOR PRE-ULURP SUBMISSIONS)
Cut Sheets for 1) Appliances from apartment kitchen and public use kitchen or pantry including refrigerators, dishwashers, ranges,
range hoods, microwaves, and sinks; 2) bathroom, half bath, and public toilet fixtures including bath tubs, showers, water closets,
urinals, and lavatory/vanities, baby changing stations, toilet paper holders, toilet seat cover dispensers, soap dispensers, hand
dryers, garbage disposal units; 3) washers & dryers in dwelling units and common/public laundry, laundry-product vending
machines, laundry sinks; and 4) drinking fountains, mailboxes, recycling bins in trash/recycling rooms.
7474
APPENDIX 2APPENDIX 2 HPD BLDS New Construction Design ReviewHPD BLDS New Construction Design Review
Submission Checklist Submission Checklist
Document Version 4.18.2024
HPD BLDS New Construction
Design Review Submission Checklist
HPD PROJECT ID
___________________________________________________________________________________
PROJECT NAME ____________________________________________________________________________________
PROJECT ADDRESS __________________________________________________________________________________
REVIEW PATHWAY ____________________________________________________________________________________
PROJECT SUMMARY WORKBOOK
As an Excel file and named: [borough]_[block]_[project name] ]_DGW-NC_3.xlsx
HPD New Construction Design Guidelines Workbook, filled out through Milestone 3 (Design Review).
DRAWINGS
Combined as a single PDF and named: [borough]_[block]_[project name]_DWGS.pdf
REQUIRED FOR FULL DESIGN REVIEWS AND TARGETED DESIGN REVIEWS
Submission Checklist (this document, filled-out). This must be the first sheet in the ‘Drawings’ file.
Pre-Construction Accessibility Statement confirming that the project complies with the applicable accessibility requirements.
Renderings illustrating the proposed design from a variety of viewpoints, especially from sidewalk level at bordering streets.
Area Plan depicting the site and context, including blocks, lots, building outlines, nearby amenities, notable landmarks, five block
transit stop radii, and direction of traffic.
Tax Map using the DOF tax map as a base, depicting how proposed actions affect the tax lots within and surrounding the Project
Area and Development Site (see DCP document description online).
Photographs depicting the site(s) and the relation to surroundings, keyed to a plan (may include images from online sources).
Site Plan indicating the context of the development within nearest street intersection(s), including site boundaries & restrictions,
buildings, access points, adjacent structures, roads, sidewalks, parking, driveways, elevation grades, hard and soft surfaces, tree
locations, landscaping, fences, gates, lighting, easements, and encroachments.
Zoning Analysis citing all pertinent sections of the zoning resolution, and including permitted and proposed uses, unit density, FAR,
bulk, lot coverage, height, setbacks, vehicle and bicycle parking, etc.
City Planning Commission (CPC) Reports and Presentation including any suggestions or notes from CPC for projects that have
previously gone through a Uniform Land Use Review Procedure (ULURP), if available.
Building Code Summary indicating project strategy for compliance with building code highlighting questions and/or conflicts for
discussion, including for projects defined as “flood-prone” per the Design Guidelines. Note that projects subject to Appendix G
have additional compliance requirements based on HPD’s Design Guidelines. Projects seeking Waivers from this requirement will
be required to submit a Design Waiver demonstrating why compliance is infeasible.
Floor Plans representing all floors of the proposed development (cellar/basement, street level, typical floor, upper floors, and roof
plan, etc.); clearly labeling all community and common spaces; clearly labeling all rooms with names, dimensions, and area; and
clearly labeling each unit with a unique name and total net area.
Elevation Drawings representing all exterior elevations of the proposed development; indicating finishes, materials, ceiling
heights, floor elevation levels, and total building height; labeling all elements; and indicating existing adjacent and proximate
buildings to illustrate the context.
PROJECT STAMP
HPD USE ONLY
PROJECT THUMBNAIL
--
7575
Document Version 4.18.2024
REQUIRED FOR FULL DESIGN REVIEWS ONLY (NOT TARGETED DESIGN REVIEWS)
Section 504 Unit Designation Table identifying and locating units that comply with the requirements of Section 504 of the
Rehabilitation Act of 1973.
Enlarged Detail Plans for Section 504-Designated Units
Accessibility Detail Drawings for all kitchens, bathrooms, single-user toilets, multi-user toilet rooms, elevators, mailboxes,
common/public laundry rooms, trash/recycling rooms, locker rooms, including plans, elevations, and door schedules, all of which
demonstrate compliance with Chapter 11 of
New York City Building Code
, the federal
Fair Housing Act
, and Section 504 of the
Rehabilitation Act of 1973
.
INCLUSIONARY PROJECTS MUST INCLUDE THE FOLLOWING CHARTS (BOTH FULL AND TARGETED)
Chart A Vertical Unit Distribution
Chart B Horizontal Unit Distribution (VIH only)
Chart C Unit Bedroom Mix
Chart D Unit Size
Chart E Average Unit Size (MIH Hybrid only)
For Inclusionary Projects proposing both inclusionary and market rate buildings, all buildings must be included in the site plan
(including all proposed building entries) and in project renderings.
DOCUMENTS
Combined as a single PDF and named: [borough]_[block]_[project name]_DOCS.pdf
REQUIRED FOR FULL DESIGN REVIEWS AND TARGETED DESIGN REVIEWS
Architect Written Response from previous BLDS Design Consultation or Design Review (for resubmission only).
Topographic & Utility Survey by a licensed land surveyor.
Geotechnical Report & Preliminary Boring Logs (if available)
FEMA Base Flood Elevation Map identifying and delineating Special Flood Hazard Area by Zone. This must be the most current
published map.
REQUIRED FOR FULL DESIGN REVIEWS ONLY (NOT REQUIRED FOR TARGETED DESIGN REVIEWS)
Cut Sheets for 1) Appliances from apartment kitchen and public use kitchen or pantry including refrigerators, dishwashers, ranges,
range hoods, microwaves, and sinks; 2) bathroom, half bath, and public toilet fixtures including bath tubs, showers, water closets,
urinals, and lavatory/vanities, baby changing stations, toilet paper holders, toilet seat cover dispensers, soap dispensers, hand
dryers, garbage disposal units; 3) washers & dryers in dwelling units and common/public laundry, laundry-product vending
machines, laundry sinks; and 4) drinking fountains, mailboxes, recycling bins in trash/recycling rooms.