o
Fast track tender package management for QS and QM teams, as well as substructure tender packages.
o
Regulatory approval submissions for Fangan, Kuochu, and Shigontu.
o
Implementing project controls. Facilitating bidding and contracting strategy.
o
Reviewing and approving feedback from operations, ride engineering, show set design, creative
entertainment, theme lighting, and graphics teams.
o
Negotiating with consultants and specialists to establish fees, respond to RFIs, and process change orders.
o
Delivering complex performance-based designs for the theater and flume ride, as well as submitting for fire
bureau approvals.
o
Establishing a system to track and log design input and sketches.
o
Resolving LDI queries, assembling responses from diverse parties.
o Collaborating with stakeholders to progress designs from SS to DD.
o
Creating and streamlining a method for incorporating design review comments
o
Participating in clash detection BIM work sessions.
o
Fostering team meetings with vendors for cladding, FRP, GRC, doors, hardware, and more.
o
Providing direction and issue resolution to functional teams to execute project objectives in alignment with
approved schedule and budget goals.
o
Working with the Shanghai based Local Design Institute to establish the WDI office.
o
Managing communication between Shanghai and Glendale, managing various contracts, and relationships
with Chinese Partners.
o
Effectively addressing and eliminating difficult issues with smoke evacuation, sprinkler, and fire load with RJA.
o
Building templates for IRL logs, transmittals, and distribution lists.
ALDAR PROPERTIES PJSC, www.aldar.com
,
Abu Dhabi, United Arab Emirates • 2008 to 2011
Project Manager (on site)
Managed a professional team of project managers, contractors, and design consultants to drive planning, design, and
delivery of
significant architectural mega projects as Owner's Rep with authority over design execution.
Involved in:
o
Coordinating project scope, RFPs, and project briefs for a portfolio of projects.
o
Managing feasibility studies, master planning, and master plan approval for proposed projects.
o
Contributing technical expertise to feasibility studies to ensure designs exceeded standards.
o Ensuring project schedules, budgets, and quality are in alignment with project goals.
o
Advising involved parties on construction procurement packaging and implementation.
o
Directing the activities of integrated project delivery teams.
o
Acting as Lead for design briefs, scope documentations, RFPs, and the consultant selection process.
o
Handling facility programming. Developing phasing and procurement strategies.
o
Integration of best practices, including sustainability
guidelines and requirements for planning, energy use,
façade systems, modular elements, structural
systems, and energy modeling.
o
Submitting master plans to key authorities such as UPC, TIS, EIA, ADM, and ADWEA.
o
Monitoring project profitability while simultaneously mitigating risks.
o
Gathering information from consultants on new and more efficient design and delivery methods.
o
Authoring project guidelines based on best practices for retail developments, residential communities, and
university campuses.
Key Projects:
o
Khalifa University: A 6 billion AED 76-hectare master plan New Science and Technology University in
Masdar City, Abu Dhabi with multiple building typologies, including Academic, R&D, Student Life, Medical,
and Residential campus. Worked with Sasaki, RMJM, AECOM, Buro Happold & Foster & Partners and Davis
Langdon.
o
Ferrari World: Abu Dhabi-based 4 billion AED theme park on Yas Island, at 86,000 sq.m. world’s largest
Indoor Theme Park, sitting under a 200,000 sq.m. red roof designed in style of classic double-curve Ferrari
GT body shell. Contains over 20 state-of-the-art attractions, each designed to bring to life different part of
Ferrari story. Completed on schedule in time for 2010 F1 race. Worked with Benoy, Jack Rouse Associates,
BeSix, Mivan Depa, RSM, Mesa, Halcrow, Ramboll Witby-Bird, and Blair Anderson.
o
Nareel Island Resort & Villas: A 92-acre island in Abu Dhabi, UAE with 74 Luxury Villas, 100-key Ritz
Carleton Hotel and 50-slip Marina. Delivered first 35M AED Show Villa. Worked with Denniston, RW
Armstrong and Parson Brickerhof.
o
Yas Mall: A 230,000 sq.m. Super Regional Mall on Yas Island in Abu Dhabi, next to Ferrari World. Expected
to open in 2014. Contains 250 stores, three department stores, entertainment courts, and Italian fashion
boulevard onsite. Worked with Benoy, Shankland Cox, Cyril Sweett, RSM and Blair Anderson.