NewCastle‐MarineResearchFacility‐ElectricalDistributionUpgrade
2‐INDESIGN
FCR
MOZZONI,MINDYS
6/3/24ScottHealeyandOakPointworkedwithYatestodetermineatemporarysolutionto
allowforresearchtobegin.Mostfeasiblepathtosupportallandfutureresearchneedsisto
upsizeexisting75kVAtransformerto112.5kVA.OakPointwillreviewloadstudiesforcoast
guardreview.ICReedwill
replacetransformeruponcoastguardandfundingapproval.
DesignFirm:
OakPoint
Contractor: ContractorName:
Yates
2023‐0082
YearApproved:
2023
MemorialUnionBuilding
ProjectsinBuilding
3
MemorialUnionBuilding‐110TonRooftopChiller
2.5‐INPROCUREMENT
FCR
MOZZONI,MINDYS
6/3/24ContractwasawardedtoStructureTone.Continuingtoreviewsubmittalsandscheduling
.EstimatedinstallforrooftopandgranitestateroomchillerisFallof2024‐Spring2025
dependingonmulti‐stackchillershipping.RentalchillerwillbeprovidedbyMultiStackin
eventcoolingbefore4/1/25cannotbeachieved.
DesignFirm: SMRT Contractor: External ContractorName: StructureTone
2021‐0070
YearApproved:
2024
MemorialUnionBuilding‐Granit eStateRoomChillerReplacement
2.5‐INPROCUREMENT
FCR
MOZZONI,MINDYS
6/3/24ContractwasawardedtoStructureTone.Continuingtoreviewsubmittalsandscheduling
.EstimatedinstallforrooftopandgranitestateroomchillerisFallof2024‐Spring2025
dependingonmulti‐stackchillershipping.RentalchillerwillbeprovidedbyMultiStackin
eventcoolingbefore4/1/25cannotbeachieved.
DesignFirm:
SMRT
Contractor: ContractorName:
2016‐0453
YearApproved:
2022
MemorialUnionBuilding‐RoofDeckPartialRepl acement
3‐INCON STRUC TI O N
FCR
IRELAN,PETERD
04‐26‐2024:
Electronicleakdetectionpassed.Floodtestinitiated4/26andscheduledforthenext48hrswith
monitoringbythecontractor.
DesignFirm:
ARMConsultants
Contractor: ContractorName:
ChartersBrothers
2023‐0092
YearApproved:
MorseHall
ProjectsinBuilding
4
MorseHall‐HVACAHURepl acements
2‐INDESIGN
RR
MANCINI,MATTHEWE
6/3/2024:TheRFQ/Pfora ConstructionManagerwillbeginthismonth.Onceselec ted,the
designeffortw illresume.
DesignFirm:
ConsultingEngineeringServi
Contractor: ContractorName:
2016‐0401
YearApproved:
Wednesday,June5,2024
Page8of16
UniversityofNewHampshire
FacilitiesProjectManagement