Curriculum Vitae – Wael Abo Daia
1
WAEL SAKR ABO DAIA
Interior Fit-out Construction Manager
PERSONAL DETAILS
Date of Birth 19/05/1977.
Marital Status Married.
Nationality Egyptian.
Address Doha, Qatar.
Cellphone +974 7765 7065
Skype ID wael.abodaia
PROFESSIONAL PROFILE
15+ years of Interior Fit-out and finishing works experience as a Project Manager, Project Coordinator and
Construction Manager.
Skilled in all facets of Project Management and Construction Management with sound knowledge of various
engineering disciplines such as Planning & Scheduling, Cost Control, Contracts Administration, Site Supervision,
Quality and Site Safety.
Demonstrated versatility in managing projects of various types, sizes and complexities including residential
towers, Hotels, Palaces, Villas, Commercial Buildings, Shopping Malls, Banks, Offices, Government Holdings.
Strong relation with clients, contractors, subcontractors, consultants, and government authorities.
Dedicated to ensuring highest level of interior fit out quality complying with deadlines and specifications.
EDUCATION
Sep 1995 – June 2000 B.Sc. Interior Design & Furniture from Faculty of Applied Arts, Helwan University in Cairo
– Egypt.
PROFESSIONAL POSITIONS
June 2015 – Present ID Manager at Al-Ali Engineering Company W.L.L – Doha, Qatar.
June 2014 – May 2015
ID Construction Manager & ID Coordinator at Haramain Gate Company for Construction
LLC subsidiary of Saudi Bin Ladin Group – Riyadh, KSA.
July 2013 – May 2014
Feb 2012 – Jan 2013
ID Coordinator at ELBU for Projects Execution, Redecoration and Investments – Poznan,
Poland.
Apr 2011 – Sep 2011 ID Coordinator at Nabud for Designing Expertise & Building Supervision – Poznan,
Poland.
July 2010 - Mar 2011
Fit-out Project Manager at Unipods L.L.C Member of Alrajhi Holding Group – RAK,
UAE.
Jan 2007 – May 2010 ID Construction Manager at J.C Maclean International Free Zone Co. – Dubai, UAE.
Jan 2006 – Dec 2006 ID Coordinator at United Decoration Co. Subsidiary of Belhasa International Group of
Curriculum Vitae – Wael Abo Daia
2
Companies – Dubai, UAE.
Dec 2004 – Dec 2005 Site Manager at Almasrya for Contracting and Trading – Suez, Egypt.
Mar 1999 – July 2004 Junior Finishing Manager at Consolidated Contractor International Co. J.V with Orascom
Construction Industrials Co. – Cairo, Egypt.
COMPLETED PROJECTS
June 2015 – Present
ID and Architectural Finishing Works (Block, Plaster, Paintings, Traffic Coatings, Ceramic
tiles, Granite, False ceiling, Wooden Doors, Metal Doors, ….etc.) for Al-Bidda Car Park 1,
2, 3A, & 3B in Doha, Qatar.
June 2014 – May 2015
Interior fit-out and Finishing works for Damac Esclusiva Luxury Residential Towers A & B
in Riyadh, KSA.
July 2013 – May 2014
Interior fit-out and Finishing works for Grafmaj AM Head Office with the company
Warehouses.
Feb 2012 – Jan 2013 Interior fit-out and Finishing works for ELBU Head Office with a Residential House (area
900 m2) in Borkowice – Poznan – Poland.
Apr 2011 - Sep 2011 Interior design, interior fit-out and Finishing works for the Residential Houses (area 3800
m²) located in Chomecice - Wypalanki – Poznan – Poland.
July 2010 – Mar 2011 Joinery design, manufacture and installation of kitchens for 20 Villas (2 levels per villa) in a
Residential Complex for Force 10 Trading Co in Abu Dhabi – UAE.
June 2009 – May 2010 Interior Fit-out, joinery manufacture and installation and Finishing works from paintings,
marble, glass works, falsie ceiling …etc. for luxury beach villa of Umm Qwain governor
(Sheikh Saud Bin Rashid Al-Mu’alla) with Arenco Engineering Consultancy Co. in Umm
Qwain – UAE.
June 2009 – May2010 Joinery manufacture and installation plus the interior fit-out with Finishing works from
paintings, ceramic tiles, marble, falsie ceiling …etc. for luxury 2 Nos. of residential villas at
Emirates Hills for Bhatia Contracting Co. in Dubai, UAE.
June 2008 – May 2009 Joinery design, manufacture and installation of timber doors, kitchens, wardrobes and
vanities plus the interior fit-out with Finishing works from plaster, paintings, ceramic tiles,
marble, falsie ceiling … etc. for 27 levels of residential tower (MX04) at Downtown Jebel
Ali for Limitless Development Co in Dubai – UAE.
Dec 2008 – May 2009 Joinery manufacture and installation for wooden, leather and acoustic panels with the
interior fit-out for the Limitless Development Co. – CEO Head office and theater with
Arab Construction Co. in Dubai – UAE.
Apr 2008 – Dec 2008 Joinery manufacture and installation of the timber doors and installation of ceramic tiles for
Dubai Cricket Stadium at Dubai Sports City with Alpine Construction Co. Dubai – UAE.
Jan 2008 – Mar 2008 Interior design and fit-out with Finishing works from plaster, paintings, ceramic tiles,
marble, falsie ceiling … etc. for Althoraya Lectures Building at Zayed University with
Alhabtoor Construction Co. in Dubai – UAE.
Jan 2007 – Dec 2007 Joinery manufacture and installation of timber doors, wooden handrails, wardrobes, and
kitchen cabinets for 300 Nos. of residential villas at Palm Jumeriah with Hill International
Co Dubai – UAE.
July 2006 – Dec 2006 Interior design and Interior fit-out plus joinery design, manufacture and installation with
Finishing works from plaster, paintings, ceramic tiles, marble, falsie ceiling … etc. for
Damac Sales Office for Damac Properties Co. in Sharjah – UAE.
Curriculum Vitae – Wael Abo Daia
3
Jan 2006 – June 2006 Interior design and Interior fit-out plus joinery design, manufacture and installation with
Finishing works from plaster, paintings, ceramic tiles, marble, falsie ceiling … etc. for the
lobbies and banquet hall at the Waves Residential Tower, Dubai Marine for Damac
Properties Co. in Dubai – UAE.
Dec 2004 – Dec 2005 Interior fit-out with Finishing works from block work, plaster, paintings, ceramic tiles,
marble, falsie ceiling … etc. plus the infrastructure works, Portable water lines, IT lines, and
paving all the container areas by a paver block at Alsokhna Port in Suez – Egypt.
Mar 1999 – July 2004 Interior design and Interior fit-out with Finishing works from block work, plaster, paintings,
ceramic tiles, marble, falsie ceiling … etc. plus the polyurethane protective coating for
85,000 m² parking area, sidewalks, helipad, staircases MEP rooms and screed floors for a
fully Complex of Hotels (Holiday Inn and Intercontinental City Stars), Shopping Malls,
Residential and Offices Towers (Golden Pyramids Plaza – City Stars) from the conception
to the completion in Cairo – Egypt.
COURSES
2003 Auto CAD – 2D – YAT Learning Solutions Institute in Cairo – Egypt.
2004 English Language and Conversation Level (B1) – American university in Cairo – Egypt.
2005 English Language and Conversation Level (C1) – Defense Language Institute in Cairo –
Egypt.
2007 Communication Management – Cambridge Educational Institute in Sharjah - UAE.
2010 PMP – Project Management Professional – Cambridge Educational Institute in Sharjah -
UAE.
Oct 2011 – Jan 2012 Polish Language and Culture Level (A1) Scholarship Financed by Polish Labor Ministry and
Co-financed from EU funds – Adam Mickiewicz University in Poznan - Poland.
Feb 2013 – June 2013 Polish Language and Culture Level (A1) Scholarship Financed by Polish Labor Ministry and
Co-financed from EU funds – Adam Mickiewicz University in Poznan - Poland.
SOFTWARE SKILLS
Well versed with customized engineering software.
MS Office Suite Included MS Project.
E-Mail Applications.
Internet Research.
Auto Cad – 2D.
LANGUAGES
A
rabic
Mother tongue.
English Fluently (Read, Write, and Speak).
Polish Intermediate (Read, Write, and Speak).
REFERENCES
Available upon request