2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - I
INSTALLATION MANUAL
XR FLUSH MOUNT
INSTALLATION MANUAL
CONTENTS
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 1
DISCLAIMER 1
RATINGS 2
MARKINGS 2
ATTACHMENTS 3
COMPONENTS 4
1. ATTACH BASES 5
2. PLACE RAILS 5
3. SECURE LUGS 6
4. SECURE MODULES 6
CAMO 7
BONDING JUMPER 7
EXPANSION JOINTS 8
ELECTRICAL DIAGRAM 9
COMPOSITION SHINGLE 10-12
TILE 13-15
ADDITIONAL ROOF TYPES 15
LOW SLOPE ROOFS 16
CONDUIT PENETRATION 17
CONDUIT MOUNT 18
END CAPS 19
WIRE CLIPS 19
JAYBOX 19
MICROINVERTER KITS 20
SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER AC MODULES 20
SYSTEMS USING MICROSTORAGE PRODUCTS 21
FRAMELESS MODULE KITS 21
CONTOUR 22
MODULE COMPATIBILITY 23-29
FRAMELESS MODULE COMPATABILITY 30
DISCLAIMER
This manual describes proper installation procedures and provides necessary standards required for product reliability.
Warranty details are available on website. All installers must thoroughly read this manual and have a clear understanding
of the installation procedures prior to installation. Any installation or use of this product not in accord with or not authorized
by this written instruction shall void any and all warranties, express or implied, on the product or the use of the product
and may cause failure, property damage and personal injury. IronRidge is not liable for any unauthorized use. Install and
use only with other IronRidge products to ensure proper t and function.
IT IS THE INSTALLER’S RESPONSIBILITY TO:
Ensure safe installation of all electrical aspects of the array. All electrical installation and procedures should be
conducted by a licensed and bonded electrician or solar contractor. Routine maintenance of a module or panel shall
not involve breaking or disturbing the bonding path of the system. All work must comply with national, state and local
installation procedures, product and safety standards.
Comply with all applicable local or national building and re codes, including any that may supersede this manual.
Ensure all products are appropriate for the installation, environment, and array under the site’s loading conditions.
Use only IronRidge parts or parts recommended by IronRidge; substituting parts may void any applicable warranty.
Review the Design Assistant and Certication Letters to conrm design specications.
Ensure provided information is accurate. Issues resulting from inaccurate information are the installer’s responsibility.
Ensure bare copper grounding wire does not contact aluminum and zinc-plated steel components, to prevent risk of
galvanic corrosion.
If loose components or loose fasteners are found during periodic inspection, re-tighten immediately. Any components
showing signs of corrosion or damage that compromise safety shall be replaced immediately.
Provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical
Code, including NEC 250: Grounding and Bonding, and NEC 690: Solar Photovoltaic Systems.
Disconnect AC power before servicing or removing modules, AC modules, microinverters and power optimizers.
Review module and any 3rd party manufacturer’s documentation for compatibility and compliance with warranty terms
and conditions.
Ensure that the roof is in good condition prior to instaling any IronRidge components.
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 2
RATINGS
Product markings are located on the Grounding Lug bolt
head.
MARKINGS
UL 2703 LISTED
Conforms to UL STD 2703 Standard for Safety First Edition: Mounting Systems, Mounting Devices, Clamping/
Retention Devices, and Ground Lugs for Use with Flat-Plate Photovoltaic Modules and Panels
Scope of Evaluation includes bonding, grounding, mechanical loading, and re classication
• Max Overcurrent Protective Device (OCPD) Rating: 40A
• Max Module Size: 30.5 ft²
Module Orientation: Portrait or Landscape
System Design Load Rating: 10 PSF downward, 5 PSF upward, 5 PSF lateral
Actual system structural capacity including spans and cantilevers are dened by PE stamped certication letters
CAMO Specic Design Load rating: 50 PSF downward, 50 PSF upward, 15 PSF lateral
Certied to CSA TIL No. A-40 Photovoltaic Module Racking Systems
Load Rating: 2400 PA [50 PSF]
CLASS A SYSTEM FIRE RATING PER UL 2703
Any Roof Slope with Module Types 1, 2, 3, 13, 19, 25, 29 and 38: Allowed with any roof slope. Any module-to-roof gap
is permitted, with no perimeter guarding required
Module Types 4 and 5: Allowed with Steep Slope Roofs (≥ 9.5°). Any module-to-roof gap is permitted, low edge
guarding (Trim) required
Class A rated PV systems can be installed on Class A, B, and C roofs without aecting the roof re rating
CLASS B SYSTEM FIRE RATING PER UL 2703
Module Types 4 and 5: Allowed with Steep Slope Roofs (≥ 9.5°). Any module-to-roof gap is permitted, with no
perimeter guarding required.
WATER SEAL RATINGS:
UL 441 and TAS100(A) (Flashfoot2, L-Mount, Flashvue, All Tile Hook, Knockout Tile, Halo UltraGrip)
• Tested and evaluated without sealant
Any roong manufacturer approved sealant is allowed.
Ratings applicable for steep roof slopes 2:12 and above.
UL 2703A RATINGS:
Conforms to UL SUBJECT 2703A - Halo UltraGrip and BUG
Steep Slope Ratings applicable for Asphalt Shingle roofs with slopes 2:12 and up
Low Slope Ratings applicable for Roll Roong (Rolled Comp) roofs with slopes 1:12 and up
Low Slope Ratings applicable for Modied Bitumen (Mod-Bit) roofs with slopes 1/4:12 and up
Installer must verify roof slope prior to installing HUG or BUG to validate applicable roof types
UL 1565 RATINGS:
Conforms to UL STD 1565 and Certied to CSA C22.2 #18.5-13 Positioning Devices - Wire Clip
• Operating Temperature Range: -35 to 90C
Maximum Load: 10lbs
For outdoor use
STRUCTURAL CERTIFICATION
Designed and Certied for Compliance with the International Building Code & ASCE/SEI-7
FLORIDA PRODUCT APPROVAL #FL29843
Approved for installation both inside and outside High Velocity Hurricane Zones (HVHZ)
• Additional details and full list of approved components can be found here
#5003807
#5028987
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 3
ATTACHMENTS
BONDING HARDWARE TORQUE VALUES
Please refer to each attachment's individual section for full details
on all torque values and instructions.
3/8" Bonding Hardware Nuts (7/16" Socket): 250 in-lbs
All Tile Hook Carriage Bolts (7/16" Socket): 132 in-lbs
Flat Tile Hook Carriage Bolts (7/16" Socket): 132 in-lbs
Flat Roof Attachment Nuts (9/16” Socket): 250 in-lbs
Lynx Set Screw (3/16" Hex Drive): 150 in-lbs
Lynx Flange Nut (1/2" Socket): 150 in-lbs
If using previous version of Integrated Grounding Mid Clamps,
End Clamps, Expansion Joints, Classic Composition Mount
and for a list of approved 3rd party components please refer to
Alternate Components Addendum (Version 2.1)
ATTACHMENTS
QM L-MountFlashVue
QM Quick Hook and
Flashing (optional)
QM QBase Tile
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
All Tile Hook and
Flashing (optional)
FlashFoot2
COMPOSITION SHINGLE
TILE
QM Tile Replacement
QM QBase
QM QBase MountFlat Roof Attachment
LOW SLOPE ROOF
QM Qbase Shake -
Slate - Metal Shingle
ADDITIONAL ROOF TYPES
PRE-INSTALLATION
Verify module compatibility. See Page 21 for info.
TOOLS REQUIRED
Cordless Drill (non-impact)
Impact Driver (for lag bolts)
Torque Wrench (0-250 in-lbs)
7/16” Socket
1/2" Socket
9/16" Socket
7/32" Drill Bit
3/8" Socket
1/8" Drill Bit
1/4" Drill Bit
T30 Bit
Channel Lock Pliers
#3 Phillips Bit
3/16" Hex Bit
QM Lynx Metal Roof
Attachment
QM Tile Conduit
Penetration
Knockout Tile
HUG
(Halo UltraGrip)
Flat Tile Hook and
Flashing (optional)
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 4
COMPONENTS
BONDING HARDWARE TORQUE VALUES
Please refer to each attachment's individual section for full details
on all torque values and instructions.
Universal Fastening Object (7/16" Socket): 80 in-lbs
End Fastening Object (7/16" Socket): 80 in-lbs
Rail Grounding Lug Nut (7/16" Socket): 80 in-lbs
Module Grounding Lug
Grounding Nut (7/16" Socket): 60 in-lbs
Grounding Lug Terminal Screws (7/16" Socket): 20 in-lbs
Microinverter Kit Nuts (7/16" Socket): 80 in-lbs
Frameless Module Kit Nuts (7/16" Socket): 80 in-lbs
3/8" Bonding Hardware Nuts (7/16" Socket): 250 in-lbs
Contour Clamp (T-30 Torx Bit): 80 in-lbs
Unless otherwise noted, all components have been evaluated for
multiple use. They can be uninstalled and reinstalled in the same
or new location.
COMPONENTS
XR Rail
UFO and Stopper
Sleeve (30-46MM)
CAMO
Rail Grounding Lug
8" Bonding Jumper
Single Use Only
End Cap
JAYBOX
3/8" Bonding
Hardware
Microinverter Kit
Frameless Module Kit
Frameless
End/Mid Clamp
QM Classic Conduit
Comp Mount
QM Tile Conduit
Mount
PRE-INSTALLATION
Verify module compatibility. See Page 21 for info.
TOOLS REQUIRED
Cordless Drill (non-impact)
Impact Driver (for lag bolts)
Torque Wrench (0-250 in-lbs)
7/16” Socket
1/2" Socket
9/16" Socket
7/32" Drill bit
1/8" Drill bit
1/4" Drill bit
T30 Torx Bit
Channel Lock Pliers
#3 Phillips Bit
Paddle Bit
BOSS
Module Grounding
Lug
Wire Clip
Contour Trim
Contour Clamp
QM Composition
Conduit Penetration
L-Foot
EFO (30-40mm)
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 5
1. PLACE ATTACHMENTS
A. CONNECT SPLICES
Use BOSS(Bonded Structural Splice), as needed, to join multiple sections of Rail.
BOSS - Bonded Structual Splice
Insert BOSS into rst Rail up until the Stop Tab. Slide second Rail fully into place.
Rows using BOSS and exceeding 100 of rail for all roof attachments (60 feet
when using HUG) must use Expansion Joints.
Boss Splices may be installed in any location within a span.
UFO and Bonding Hardware must be installed 1" away from the point where
two Rails join together.
B. PREPARE HARDWARE
Slide square-headed bolts into side-facing rail slot. Space out bolts to match
attachment spacing.
Tape ends of rail, to keep bolts from sliding out while moving.
If using T-
bolts, carry hardware onto roof and proceed.
C. ATTACH RAILS
Drop rail with hardware into roof attachment. Level rail at desired height, then torque to
250 in-lbs.
Rail can face either upslope or downslope on roof.
When using attachments with longer slots, do not install Rail lower than the
top of the L-Foot to avoid damage to modules.
2. PLACE RAILS
Tested or evaluated third-party roof attachments:
S-5! Metal Roof Clamps - Certication of metal roof clamps
includes bonding to both painted and galvalume metal roofs.
Follow all instructions and installation practices outlined by S-5! in their Resources Page.
EcoFasten Green Fasten GF-1 Anchors
The general installation method for attachments is to
locate a rafter, drill a pilot hole and install the attachment.
For composition roof attachments installation instructions
refer to page 10. For tile roof attachments refer to page
12. For low slope roof attachments refer to page 14.
When using approved third party attachments, refer to
manufacturer's install instructions.
C
Torque to
250 in-lbs
B
Preload and Space
Square Bolts
BOSS
Insert Rail untill fully seated
against Stop Tab
A
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 6
3. SECURE LUGS
Use with one solid or stranded copper
wire, conductor size 10-4AWG.
4. SECURE MODULES
A. SECURE FIRST END
Place rst module in position on rails, a minimum of 1”
from rail ends. Snap Stopper Sleeves onto UFO. Fasten
module to rail using the UFO with stopper sleeve or EFO,
ensuring that the clamp is hooked over the top of the
module. Torque to 80 in-lbs.
Ensure rails are square before placing modules.
Hold Clamps on end while torquing to prevent rotation.
If using CAMO instead of UFO + Stopper Sleeve, refer to Page 19
for CAMO installation procedure.
UFO can be installed on modules 30 to 46mm.
EFO can be installed on modules 30 to 40mm.
B. SECURE NEXT MODULES
Place UFO into each rail, placing them ush against rst
module. Slide second module against UFO. Torque to 80
in-lbs. Repeat for each following module.
When reinstalling UFO, move modules a minimum of 1/16" so
UFOs are in contact with a new section of module frame.
When UFOs are loosened and re-tightened, ensure UFO T-bolt
bottoms out in rail channel before re-torquing UFO to achieve full
engagement between T-bolt and rail.
If using Wire Clips, refer to Page 18.
C. SECURE LAST END
Place last module in position on rails, a minimum of 1”
from rail ends. Snap Stopper Sleeves onto UFO. Secure
UFO with Stopper Sleeve or EFO on rails, ensuring they
are hooked over top of module. Torque to 80 in-lbs.
Hold clamps on end while torquing to prevent rotation.
Repeat all steps for each following row of modules, leaving a
minimum 3/8" gap between rows
If using CAMO instead of UFO + Stopper Sleeve/EFO, refer to
Page 19 for CAMO installation procedure.
A
B
C
1" From
Rail End
UFO or EFO
(80 in-lbs)
Stopper
Sleeve
or EFO
UFO
(80 in-lbs)
UFO
(80 in-lbs)
Terminal Screw
(20 in-lbs)
Hex Nut
(80 in-lbs)
Grounding Lugs
Only one Grounding Lug (Rail or Module) required per continuous
subarray, regardless of subarray size (Unless frameless modules are
used, see Page 20).
Grounding Lugs are intended to for use with one solid or
stranded copper wire, conductor size 10-4 AWG.
Rail Grounding Lug
Insert T-bolt in Top Rail slot and torque Hex Nut to 80 in-lbs. Install
a minimum 10 AWG solid copper or stranded grounding wire. Torque
terminal screw to 20 in-lbs.
Module Grounding Lugs can be installed anywhere along the Rail
and in either orientation shown.
Module Grounding Lug
Insert Bolt through Manufacturer approved grounding location and torque
Hex nut to 60 in-lbs. One Module Grounding Lug may be installed to
one module per row. Install a minimum 10 AWG solid copper or stranded
grounding wire. Torque terminal screw to 20 in-lbs.
Refer to module manufactuer for mounting location and
instructions.
FLANGE NUT
GROUNDING LUG
BOLT
STAR WASHER
Terminal Screw
(20 in-lbs)
Hex Head
(60 in-lbs)
Module Grounding Lug
Rail Grounding Lug
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 7
B. PLACE MODULE
Place module on rails (module cells not shown for
clarity). When installing CAMO the module can
overhang the rail no more than 1/4".
D. SECURE TO FRAME
Rotate handle with an upwards motion until CAMO
snaps into rail channel. Ensure CAMO bonding
pins are fully seated on top of module frame.
CAMO
A. SLIDE INTO RAIL
Slide CAMO into rail channel far enough to clear the
module frame. CAMO requires 6" of clearance from end of
rail.
C. PULL TOWARDS END
Pull CAMO towards rail ends, at 45 degree angle, so the
bonding bolt contacts the module ange edge.
B
C
D
A
6" Clearance
8" BONDING JUMPER
8" Bonding Jumper is an electrical bonding jumper that can
be used on the Flush Mount System for row to row bonding;
making the module frames the medium for the equipment
ground path.
Bonding jumper is pushed onto the bottom ange of the module.
New jumpers should be used if re-installation of jumper is required.
Supports bottom ange thicknesses from 1.2mm to 3.1mm.
FRAME COMPATIBILITY
CAMO has been tested or evaluated with all modules listed in the
Module Compatibility section having frames within the referenced
dimensions. Be sure the specic module being used meets the
dimension requirements.
For module manufacturer specic compatibility where applicable, please refer
to IronRidge online Design Assistant
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 8
EXPANSION JOINTS
BOSS
Insert BOSS into rst Rail up to the Alignment Circle, Slide
second Rail over BOSS to the second Alignment Circle,
leaving a 1" gap between the Rails.
There must be a 1" of space between the edge of the Rail
and the edge of the panel to allow proper installation of the
UFO and Stopper Sleeve.
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
No Modules Over Gap
One Bonding Strap Per Break In
Array
A A
B B
C C
D D
E E
F F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
No Modules Over Gap
No Bonding Strap required for
BOSS
Expansion Joints are required every 100' of continuous rail to allow for thermal expansion and contraction of the system.
Do not install modules over expansion joint.
Expansion Joints are required every 60' of continuous rail when installing on HUG.
1" Gap Alignment
Circles
END CAPS (OPTIONAL)
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 9
ELECTRICAL DIAGRAM
UFO
Grounding Lug
Minimum 10 AWG
Copper Wire
Fault Current
Ground Path
Bonded Splice (Rail Connection)
*
*
*One Module Grounding Lug or Rail Grounding lug is required per row of a system.
** The use of the 8" Bonding Jumper eliminates the need for row to row bonding. A minimum of one grounding lug
per continuous array is required for earth ground.
CAMO
or
UFO or
CAMO
8" Bonding Jumper (Alternative row to row bond)**
Rail Grounding Lug*
Module Grounding Lug*
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 10
COMPOSITION SHINGLE
Locate roof rafters and mark locations on roof. Drill 1/4"
pilot holes perpendicular to the roof and back ll with
roong manufacturers' approved sealant. Slide ashing
between 1st and 2nd course of shingles, ensuring both
that the ashing reaches under the 3rd shingle course and
doesn't overhang the downhill shingle course. Line up with
pilot hole and insert supplied lag bolt with washer through
ashing. With a 7/16" Socket fully seat lag bolt. Place Cap
onto ashing in desired orientation for E/W or N/S rails and
rotate 180 degrees until it locks into place.
Rail can be installed on either side of FlashFoot2 Cap.
For additional details refer to the full FlashFoot2 Installation
Manual.
FLASHFOOT2
FLASHVUE
Locate rafters and snap vertical and horizontal lines to
mark locations of ashings. Drill 1/4” pilot holes, then
backll with an approved sealant. Slide ashing between
1st and 2nd course of shingles, ensuring both that the
ashing reaches under the 3rd shingle course and doesn't
overhang the downhill shingle course. Line up pilot hole
with View Port. Press Grip Cap onto ashing in desired
orientation for E/W or N/S rails. Insert Lag Bolt with
mechanically bonded washer through ashing. With a
7/16" Socket drive Lag Bolt until fully seated. FlashVue
is now installed and ready for IronRidge XR Rails.
Attach rails to either side of the open slot using bonding
hardware. Level rail at desired height, then torque to 250
in-lbs (21 ft-lbs).
When installing Gripcap+ on roofs with undulations greater
than 1 inch, install GripCap+ in low points across the array
as required.
For additional details refer to the full FlashVue Installation
Manual.
For additional details on the GripCap+ refer to the full GripCap+
Installation Manual.
Torque to
250 in-lbs
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 11
COMPOSITION SHINGLE
QM L-MOUNT
Locate roof rafters and mark locations on roof. Drill
7/32”(Lag) or 1/8"(ST) pilot holes perpendicular to the roof
and back ll with roong manufacturers' approved sealant.
Slide ashing between 1st and 2nd course of shingles,
ensuring both that the ashing reaches under the 3rd
shingle course and doesn't overhang the downhill shingle
course. Place L-foot on ute and rotate into desired
position. Prepare lag bolt or structural screw with sealing
washer. Use 1/2" socket to drive prepared lag bolt through
L-foot until fully seated and L-foot can no longer rotate
easily.
Torque Nut to 156 in-lbs (13 ft-lbs) for ST.
Attach
rail to L-Foot with Bonding Hardware and torque to 250
in-lbs (21 ft-lbs).
Structural screw can be driven with T-30 hex head bit.
For additional details refer to the full QM Installation Manual.
QM QBASE COMPOSITION MOUNT
Locate roof rafters and mark locations on roof. Align
QBase vertical holes over center rafter and mark. Drill two
pilot holes with 7/32" drill bit, perpendicular to roof and
back ll with roong manufacturers' approved sealant.
Set grade 8 cap screw through bottom of QBase, place
QBase over drilled holes and secure lags. Screw Post to
QBase. Proceed with roong up until the ashing should
be installed. Install ashing over mount. Allow roong to
proceed to the next course. Apply sealant where post and
ashing meet, install EPDM counter ashing collar. Attach
L-Foot on Stando with hardware. Torque to 174 in-lbs
(14.5 ft-lbs). Attach rail to L-Foot with Bonding Hardware
and torque to 250 in-lbs (21 ft-lbs).
For additional details refer to the full QM Installation Manual.
Torque to
174 in-lbs
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 12
COMPOSITION SHINGLE
Conrm shingle step does not exceed 1/8”. Locate and
mark centers of rafters to be mounted. Select the courses of
shingles where mounts will be placed. Peel o release liner.
Align HUG horizontally using the shingle edge or chalk line
with the alignment grooves on the mount. Once in desired
location, lightly press against roof to preliminarily hold the
mount in place. Drive RD Structural Screw using 5/16”
socket, ensuring that two screws are correctly installed into
the center of the rafter. Drive screws until fully seated.
Rail can be installed on either side of HUG.
For complete installation requirements and limitations, please
refer to the HUG Installation Manual.
HUG is only approved for installation with IronRidge RD
Structural Screws.
HUG cannot be installed between courses.
HUG (RAFTER)
Conrm shingle step does not exceed 1/8”. Locate and mark
attachment loactions. Select the courses of shingles where
mounts will be placed. Peel o release liner. Align HUG
horizontally using the shingle edge or chalk line with the
alignment grooves on the mount. Once in desired location,
lightly press against roof to preliminarily hold the mount in
place. Drive screws using 5/16” socket, until fully seated.
All 6 RD Structural Screws must be used in deck mounted
conditions.
Rail can be installed on either side of HUG.
For complete installation requirements and limitations, please
refer to the HUG Installation Manual.
HUG is only approved for installation with IronRidge RD
Structural Screws.
Rows of rail exceeding 60 feet require a thermal expansion joint
when using HUG.
HUG (DECK)
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 13
TILE
Orient Base to desired position
Tighten until fully seated
Torque to
250 in-lbs
QM TILE REPLACEMENT
Remove tile and mark rafter. Measure up 8 3/4" from the
adjacent tiles and mark horizontal across rafter. Align
baseplate over rafter so that the lag holes align with the
post groove. The orientation of the plate can be adjusted
cross roof, mark location of lag holes on the roof. Drill two
1/8" Pilot holes and back ll with roong manufacturers'
approved sealant. Waterproof at underlayment level
according to roong manufacturers' instructions and the
Tile Roong Industry Alliance guidelines. Use T-30 Torx
bit to lag base into position. Insert Grade 8 Serrated
Flange Bolt into bottom of the Post, slide Post into
Base channel. Line up post with the hole in the Tile
Replacement Flashing. Leave loose for adjustments.
Place Tile Replacement Flashing over the Post and Mount,
allowing the ashing to properly interlock with surrounding
tiles. Secure Post by tightening with channel lock pliers.
Replace all tiles. Apply a bead of sealant where the post
meets the ashing, slip EPDM collar over post and down to
ashing. Attach L-Foot on Stando with hardware. Torque
to 174 in-lbs (14.5 ft-lbs). Attach rail to L-Foot with
Bonding Hardware and torque to 250 in-lbs (21 ft-lbs).
If deck level ashing is required, approved ashing methods
include user supplied adhesive backed exible ashing.
For additional details refer to the full QM Installation Manual.
Remove tile and mark rafter. Use base as guide to
drill 1/4” pilot hole and ll with roong manufacturer’s
approved sealant. Install optional Roof Flashing and seal
appropriately. Insert lag bolt with bonded washer through
base (and ashing if used) and drive until fully seated.
Insert Tile Replacement Flashing, lower onto base and
apply pressure over the threaded post until it dimples the
ashing. Place L-Foot over dimple and tap with hammer to
punch threaded post through the ashing. Ensure punched
pieces of ashing are cleared away. Form ashing as
needed to sit ush with surrounding tiles, position L-Foot in
desired orientation and torque hardware to 132 in-lbs (11
ft-lbs). Attach rail to L-Foot with Aire Dock and torque to
250 in-lbs (21 ft-lbs).
Base can be installed in any orientation relative to rafter.
Ensure L-Foot does not extend above rail.
Optional deck level ashing is available. Standalone installation
manual available on website
Standalone Knockout Tile manual available on website.
Rafter
Dimple
Tap With
Hammer
Torque to
132 in-lbs
KNOCKOUT TILE
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 14
TILE
Remove tile and mark rafter, use Base Plate to mark two
holes on rafter. Drill two 7/32" pilot holes and back ll
with roong manufacturers' approved sealant. Use 1/2"
socket to drive lag into place. Slide hook into place and
adjust to desired position. Drive self-tapping screw using
a #3 Phillips bit to lock hook in place. Clean underlayment
and apply a bead of sealant compatible with roong
manufacturer, install ashing over mount. Fasten sub-
ashing to deck with one roong nail in each corner.
Waterproof at underlayment level according to roong
manufacturers' instructions and the Tile Roong Industry
Alliance guidelines. Cut clearance notch in the weather
guard of tile as needed or utilize QM Tile Replacement
Flashings. Attach rails to either side of slot using Bonding
Hardware and torque to 250 in-lbs (21-ft-lbs).
Position arm near the center of valley for curved tiles.
Position arm away from seam of joining at tiles.
Ensure top of hook does not extend above rail.
For additional details refer to the full QM Installation Manual.
QM QUICK HOOK
Remove tile and mark rafter. Position base over rafter,
adjust arm if necessary and torque hardware to 132 in-lbs
(11 ft-lbs). Use base as guide to drill 1/4" pilot holes, back
ll with roong manufacturer’s approved sealant, then
insert lag bolts and tighten until fully seated. Replace tiles
and notch as necessary to ensure proper t. Attach rails to
either side of slot using Bonding Hardware and torque to
250 in-lbs (21-ft-lbs).
Position arm near the center of valley for curved tiles.
Position arm away from seam of joining at tiles.
Ensure top of hook does not extend above rail.
Standalone All Tile Hook manual available on website.
Rafter
Torque to
132 in-lbs
Torque to
250 in-lbs
Tighten Until
Fully Seated
ALL TILE HOOK
Torque to
250 in-lbs
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 15
TILE
ADDITIONAL ROOF TYPES
QM QBASE METAL, SHAKE AND SLATE
The QM QBase can be used to install on multiple roong
types with dierent installation methods.
For instructions on installing the QBase on Slate refer to the full
QM Installation Manual.
For instructions on installing the QBase on Shake refer to the full
QM Installation Manual.
For instructions on installing the QBase on Metal Shingle refer to
the full QM Installation Manual.
Remove tile and mark rafter. Measure up 6 5/8" from
bottom of tiles and mark horizontally. Align QBase over
rafter center and drill two 7/32" pilot holes, back ll with
roong manufacturers' approved sealant. Place grade-8
Cap Screw under QBase, lag QBase into rafter location.
Install Sub-ashing, waterproof at underlayment level
according to roong manufacturers' instructions and the
Tile Roong Industry Alliance guidelines. Cut tile with
diamond blade to allow post to pass through. Place tile
in position and then install Post. Install 18"x18" ashing,
pre-bent to follow the contour of the tile as required. Apply
sealant where Post and Flashing meet and install EPDM
counter ashing. Attach L-Foot on Stando with hardware.
Torque to 174 in-lbs (14.5 ft-lbs). Attach rails to L-Foot
using Bonding Hardware and torque to 250 in-lbs (21-ft-
lbs).
For additional details refer to the full QM Installation Manual.
QM QBASE UNIVERSAL TILE MOUNT
Torque to
174 in-lbs
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 16
LOW SLOPE ROOFS
Flat Roof Attachment can be used with an L-foot for ush
mounting modules on low sloped roofs. Mark locations
for Flat Roof Attachment. Screws should be installed
symmetrically to each other. If using a membrane ashing,
remove the silicone washer's protective liner prior to
attaching the membrane. Attach L-foot with washers and
3/8” hardware torqued to 250 in-lbs (21 ft-lbs). Seal
attachment and/or membrane per roong manufacturer’s
requirements.
Type, size, and quantity of roof screws to be specied by
Structural Engineer. Fastener size not to exceed #15.
Membrane ashing available for TPO, PVC, and KEE roofs.
Ensure membrane ashing is compatible with existing roong
material.
If membrane ashing is not used, only washer on top of L-Foot is
required.
Standalone Flat Roof Attachment Manual available on website.
250 in-lbs
Flat Roof
Attachment
Hardware
L-Foot
Flat Roof
Attachment
Membrane
Flashing
FLAT ROOF ATTACHMENT
Locate the desired mount placement over a rafter. Using
the base as a template, mark the two penetration
points. Drill two 7/32" pilot holes, back ll with roong
manufacturers' approved sealant. Place the grade-8 hex
bolt in the bottom of the base and screw the Post. Attach
L-Foot on Stando with hardware. Torque to 174 in-lbs
(14.5 ft-lbs). Attach rail to L-Foot with Bonding Hardware
and torque to 250 in-lbs (21 ft-lbs).
The mount can be ashed with available 9", 12" or
18" aluminum ashings, pitch pocket or curb, or with a
membrane cone ashing. If using a membrane ashing
utilize the services of a qualied roofer
For additional details refer to the full QM Installation Manual.
QM QBASE MOUNT
Screws provided by
others. Shown for
refrence
Torque to
174 in-lbs
METAL ROOF
Locate the desired mount placement over a roong seam,
make sure block is fully seated on metal seam. Torque
Set Screws to 150 in-lbs(12.5 ft-lbs) using 3/16" Hex
Drive, alternate driving each bolt till required torque is met.
Slide Hex Bolt into slot and to desired position. Place rail
attachment bracket over Hex Bolt and secure with Flange
Nut, torque Flange Nut to 150 in-lbs(12.5 ft-lbs) using
1/2" socket.
For additional details refer to the full QM Installation Manual.
Certication of Lynx calmp includes bonding to both painted and
galvalume metal roofs.
The technology in this product is licensed by S-5!
QM LYNX
Slide hardware in to
desired position
Torque to
150 in-lbs
END CAPS (OPTIONAL)
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 17
CONDUIT PENETRATION FLASHINGS
QM CONDUIT PENETRATION FLASHING - COMP SHINGLE
Mark a drill point so that the ashing reaches up to the 3rd
shingle course. Drill your conduit hole next to the rafter
so you can secure the conduit below the roof surface.
Cut shingle and remove nails as needed to center the
drilled hole and ashing hole. Apply roong manufacturer's
approved sealant on the underside of the ashing in a
Upside down U and to top of ashing. Under the 3rd
course and through the second course secure ashing
with 2 roong nails, apply sealant over the nail heads. Cut
EPDM collar to appropriate size. Apply a bead of sealant
compatible with the roong manufacturer and EPDM
rubber to anywhere the EPDM collar contacts.
Be sure to secure conduit to rafters below the roof surface per
local building codes and NEC code requirements.
Cut EPDM collar to appropriate size using the sizing chart in the
installation manual, approved for 1/2" to 1" EMT.
For additional details refer to the full QM Installation Manual.
Nails under the third
course
Rafter
Drill your conduit hole next to the rafter so that you can
secure the conduit below the roof surface. Apply roong
manufacturer approve sealant to the underside of the
sub-ashing in the shape of an upside down U. Clear away
any dust and debris to install sub-ashing. Waterproof at
under laminate level according to roong manufacturer
instructions and Tile Roong Institute Guidelines. Under
the top layer of felt, secure the sub-ashing with two
roong nails. Cut EPDM collar to appropriate size. Apply a
bead of sealant compatible with the roong manufacturer
and EPDM rubber to anywhere the EPDM collar contacts.
With a diamond blade cut tile to allow conduit to pass
through, replace all tiles. Bend the ashing to follow the
contour of the tiles. Place ashing over the conduit and
tuck up under the next course of tiles. Apply a bead of
sealant compatible with the roong manufacturer and
EPDM rubber to anywhere the EPDM collar contacts.
Slide collar onto conduit all the way down to the ashing.
Be sure to secure conduit to rafters below the roof surface per
local building codes and NEC code requirements.
Cut EPDM collar to appropriate size using the sizing chart in the
installation manual, approved for 1/2" to 1" EMT.
For additional details refer to the full QM Installation Manual.
Rafter
QM CONDUIT PENETRATION FLASHING - TILE
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 18
CONDUIT MOUNT
Remove the tile that the mount will be installed on, and the
tiles in the course above it. Lift the bottom of the tile and
slide the bottom clamp over the bottom edge of the tile.
Insert the 4" tap bolt through the slot into the threaded hole
and use a 7/16" socket to thread the screw. Tighten until
the top clamp hook end unbends and forms a 90 degree
angle with the tile. Use the Cap Screw (included) to attach
your pipe clamp (not included) to bottom clamp. Insert
conduit and tighten with 7/16" socket.
The clamp is reversible, use the wider hook end on tile greater
than 1" thick and the thinner hook end on tiles less than 1" thick.
The installation process is the same on curved tile, make sure
that the Conduit Mount is installed on the crown(high point) of the
tile.
Install mounts as required to support conduit across the roof.
For additional details refer to the full QM Installation Manual.
QM CONDUIT MOUNT - TILE
Place conduit mounts along path of conduit. Lift shingle
above mount location and insert ashing into position.
Mark center for drilling, remove ashing and drill pilot
hole with 1/8" bit. Clean area, ll hole with roong
manufacturer's approved sealant. Lift shingle and slide
Conduit Mount into place. Prepare the lag bolt with sealing
washer and pipe clamp (not included). Insert lag through
hole in block and drill with 7/16" socket until block is tight.
Install mounts as required to support conduit across the roof.
For additional details refer to the full QM Installation Manual.
QM CONDUIT MOUNT - COMPOSITION SHINGLE
End Caps add a completed look and keep debris and
pests from collecting inside rail.
Firmly press End Cap onto rail end.
End Caps come in sets of left and right. Check that the proper
amount of each has been provided.
END CAPS
QM BUG - COMPOSITION SHINGLE
Place BUG conduit mounts along path of conduit. Clean
area, place mount and drive RD Structural Screw using
5/16” socket. Prepare the Tri-lobe Screw and pipe clamp
(not included). Insert screw in an unused hole in block and
drill with 5/16" socket until screw is tight.
Install mounts as required to support conduit across the roof.
For additional details refer to the full QM Installation Manual.
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 19
END CAPSWIRE CLIPS
Wire Clips oer a simple wire management solution.
Firmly press Wire Clip into top rail slot. Run electrical wire
through open clip. Snap closed once all wires have been
placed.
Wire Clip ts up to quantity 10 - 10 AWG PV Wire or
equivalent bundled diameter.
Press Clip
into Slot
Run Wire
Snap Clip
Closed
JAYBOX
A.
Prior to installation, use step drill bit to place pass through
holes for conduits or water-tight connectors. Drill bit
starter locations are provided on the sides and front of
enclosure.
Do not install conduit facing up roof.
B (Rail).
Use rail-specic MLPE mounting hardware to attach Rail
Hangers to rail. Ensure junction box is pushed as close
to the rail as possible. Torque to 80-in lbs (1/2" or 7/16"
socket).
Do not overtighten
If installing in areas with ground snow loads greater than
40 psf, install JayBox under module directly next to module
frame edge.
B (Shingle).
Align sealing oval of box to align with mating feature on
ashing. An EPDM foam gasket is pre-installed to the
underside of the junction box to seal the ashing to the
box without the need for additional sealant. Secure with
supplied #12 x 1-¾" deck screws (2x) until the junction
box is pulled tight to the ashing. Do not over-tighten
screws to avoid stripping screws in OSB.
If installing pass through ttings, ensure that the JayBox and
roof deck are both properly prepared. Complete installation
process before attaching the Jaybox to the deck.
Do not install JayBox under shingle seam as illustrated below.
C.
Install wiring, conduit and ttings per NEC
requirements and following local AHJ guidance.
Using Philips Head Driver tighten the bolt.
For additional details refer to the full QM Installation Manual.
Keyways and
shingle joints
Drill starter
locations
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 20
MICROINVERTER KITS
One Microinverter
Kit Required
(80 in-lbs)
Use IronRidge's Microinverter Kit to bond compatible
microinverters and power optimizers to the racking system.
Insert Microinverter Kit T-bolt into top rail slot. Place
compatible microinverter or power optimizer into position
and tighten hex nut to 80 in-lbs.
MLPE devices shall be installed near modules frames whenever
possible.
On AP Systems and Yotta
equipment, remove Grounding
Washer
Two Microinverter
Kits Required
(80 in-lbs)
Remove Grounding Washer on AP Systems QS1, QT2, DS3 and YC600
and Yotta inverters before installing to XR rails.
Remove the Stainless Steel Clip on Tigo-”A” MLPE Devices before
attaching to XR rails.
Use the number of IronRidge Microinverter kits allowed by the MLPE
mounting ange. Some will require 1 kit and others 2 kits.
AP Systems DS3, QS1, QT2 and YC600
Darfon MIG240, MIG300, G320, G640
Duracell D350-M1, D700-M2, D1500-M4
Enphase M250-72, 250-60, M215-60, C250-72, S230, S280,
IQ 6, IQ 6+, IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q
Aggregator; IQ8-60, IQ8PLUS-72, IQ8A-72, IQ8H-
208-72, IQ8H-240-72, IQ8M-72, may be followed
by -2-US; IQ8H-3P-72-E-US or IQ8P-3P-72-E-US
Generac S2502
Hoymiles HMA-xxxYY-ZZ
where "A" can be blank or S, xxx can be 300,
350, 400, 450, 500, 600, 700, 800, 900, 1000, 1200,
1500, 1600, 1800 or 2000; "YY" can be NT, 1T, 2T,
4T; and "ZZ" can be blank, NA or 208-NA
NEP
Microinverters
BDM-xxx-yyy
Where "xxx" can be 300, 300X2, 350, 400, 500,
550, 650, 800, 1000; and "yyy" can be blank, 208A
or 240A
NEP Rapid
Shutdown
PVG-1, PVG-2, PVG-3, PVG-4
SMA RoofCommKit-P2-US, TS4-R Module Retrot Kits
(TS4-R-S,
TS4-R-O, TS4-R-F)
Solar Edge M1600, P300, P320, P340, P370, P400, P401,
P405, P485, P505, P600, P700, P730, P750,
P800p, P800s, P801, P850, P860, P950, P960,
P1100, P1101, S440, S500, S500B, S650B, S1200,
S1201
Tigo Tigo Access Point (TAP)
TS4-R-X (where X can be F, M, O, or S)
TS4-R-X-DUO (where X can be M, O, or S)
TS4-A-X (where X can be F, 2F, O, O-DUO, or S)
Yotta DPI 208/480
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 21
Use IronRidge's Microinverter Kit to bond compatible microstroage
devices to the racking system. Insert Microinverter Kit T-bolt into top
rail slot. Place compatible microstorage into position and tighten hex
nut to 80 in-lbs.
Microinverter Kit
(80 in-lbs)
SYSTEMS USING MICROSTORAGE PRODUCTS
COMPATIBLE PRODUCTS
PHAZR
PHAZR Devices PHAZR-X, where X is 6-12.
Solpad
Solpad Inverter model SI-1k
Solpad Battery Storage model SB-2K
Solpad Junction Box model SJB-4k
Running a separate equipment grounding conductor to the PHAZR or
Solpad devices is not required.
If installing in areas with ground snow loads greater than 40 psf and
underneath a module, install PHAZR and Solpad devices as close as
possible to module frame edge.
Solpad may only be installed on XR-100 and XR-1000
Solpad may only be installed with modules having a frame thickness of
35mm or greater.
Use the number of IronRidge Microinverter kits allowed by the microstorage
mounting ange. Some will require 1 kit and others 2 kits.
Insert Frameless Kit T-bolt in top rail slot. Place star
washer over T-bolt, allowing it to rest on top of rail.
Secure module clamps with a hex nut and torque to 80
in-lbs.
Place
Star Washer
Module Clamp
(80 in-lbs)
Grounding Lugs
Required on Every Rail
FRAMELESS MODULE KITS
COMPATIBLE PRODUCTS
Sunforson
Sunforson silver or black SFS-UTMC-200(B) mid and SFS-UTEC-
200(B) end clamps.
Sunpreme
Sunpreme silver or black mid and end clamps with part numbers
7500105X where "X" is 1, 5, 6 or 7.
Ironridge
IronRidge silver or black mid and end clamps with part numbers
FMLS-XC-001-Y where "X" is E or M and "Y" is B or blank.
Follow module manufacturer's installation instructions to install
the module clamps.
Frameless modules require using a Grounding Lug on every rail.
For Sunpreme Modules Only: If required to use slide prevention
hardware, see Module Slide Prevention Addendum (Version
1.10).
Two sets of two
Microinverter Kits
(80 in-lbs)
Solpad
PHAZR
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 22
CONTOUR
Install Contour
Install Contour on a completed array.
A. Start by placing Contour Clamp on module frame within
12 inches of the down roof corner of the array. Each piece
of 84" Contour Trim must be suppported by two Clamps.
Clamps must be installed in the 12" clamping zones at
edge of trim. Once trim is placed and in position, secure
trim by tightening Clamp set screw to 80 in-lbs.
B. Multiple Contour pieces can be joined using Contour
Splice. Install Splice on exsisting Contour edge and install
Clamps in appropriate clamping zones for next piece of
trim. Place trim on Clamps, slide into splice to join two
pieces together. Secure Contour by tightening Clamp set
screw to 80 in-lbs. Repeat as needed across the array.
C. Cut trim to line up with edge of array.
D. Install Clamps within clamping zones on side of array.
Install second Clamp as needed up array. Place Corner
Cap on trim and slide side trim to align with Cap. Repeat
as needed along roof for both inside and outside corners.
E. Use optional End Caps to cover any exposed edges of
Contour as desired.
Do not install on side of array facing roof peak.
Contour can be installed with 1 clamp if trim section is 12" long
(or shorter) and has a splice attached on one end, on which the
section of trim the 12" section is spliced to also has 2 clamps.
Contour Trim when installed when installed up roof requires the
use of Aire Stealth Clamps.
Wind Speed: no restrictions
Ground Snow: up to 90 PSF
12.00 12.00
A.
Clamping Zones
E.
D.C.
B.
Push Trim and
install ush
FRAME COMPATIBILITY
Contour Clamp has been tested or evaluated with all
modules having frames within the referenced dimensions.
Be sure the specic module being used meets the
dimension requirements.
Flange Thickness: 1-3.5mm
Usable Flange Length: 0-33mm.
Frame Compatibility:
X = 1-3.5mm
Y = 0-33mm
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 23
MODULE COMPATIBILITY
MAKE MODELS
The Flush Mount System has been tested and evaluated to UL 2703 for bonding, grounding, mechanical loading and re
classication, and may be used to ground and/or mount PV modules listed to UL 1703 or UL 61730. A list of approved
modules is included below. Unless otherwise noted, “xxx” refers to the module power rating and both black and silver
frames are included in the certication.
FRAMED MODULE LIST
Adani
Adani modules with 30, 35 and 40 mm frames
ASX-Y-ZZ-xxx
Where "X" can be B, M or P, "Y" can be 6, 7 or M10 and "ZZ" can be blank, 144, PERC, B-PERC, or AB-
PERC
AIONRISE
AIONRISE modules with 35 and 40 mm frames
AIONyyG1-xxx
Where "yy" can be 60 or 72
Amerisolar
Amerisolar modules with 35 and 40 mm frames
AS-bYxxxZ
Where "b" can be 5 or 6; "Y" can be M, P, M27, P27, M30, or P30; and "Z" can be blank, W or WB
Aptos Solar
Aptos modules with 35 and 40 mm frames
DNA-yy-zzaa-xxxbb
Where "yy" can be 108, 120 or 144; "zz" can be MF or BF; "aa" can be 10, 23 or 26; and "bb" can be blank
or W-DG
Astronergy Solar
Astronergy modules with 30, 35 and 40 mm frames
aaSMbbyyC/zz-xxx
Where “aa” can be CH or A; "bb" can be 60, 66, or 72; “yy” can be blank, 10 or 12; "C" can M, P, M(BL),
M-HC, M(BL)-HC, P-HC, M(DG), M(DGT) or N(DG); and “zz” can be blank, HV, F-B, or F-BH
ASUN
ASUN modules with 35 and 40 mm frames
ASUN-xxx-YYZZ-aa
Where "YY" can be 60 or 72; "ZZ" can be M,or MH5; and "aa" can be blank or BB
Auxin
Auxin modules with 35 and 40 mm frames
AXNCyzAxxxB
Where "C" can be 6, 10 or G1; "y" can be M or P; "z" can be blank, 08, 09, 610, 11, or 612; and "A" can be
blank, F, M or T; and "B" can be blank, A, B, C or W
Axitec
Axitec Modules with 30, 35 and 40 mm frames
AC-xxxY/aaZZb
Where "Y" can be M, P, MB, MBT or MH; "aa" can be blank, 125- or 156-; "ZZ" can be 54, 60, 72, 108, 120,
or 144; "b" can be S, X, V, VB, XV, or MX
Bluesun Solar
Bluesun modules with 30 and 35 mm frames
BSMxxxY-AAA
Where "Y" can be M or M10; and "AAA" can be 54HPH, 60HPH or 72HBD
Boviet
Boviet modules with 35 and 40 mm frames
BVMZZaaYY-xxxBcc
Where "ZZ" can be 66 or 76; "aa" can be 9, 10 or 12; "YY" is M or P; and "B" can be blank, L or S; and "cc"
can be blank, H, H-BF, H-BF-DG, H-HC, H-HC-BF, H-HC-BF-DG, HC-BF or HC-BF-DG
BYD
BYD modules with 35 mm frames
BYDxxxAY-ZZ
Where "A" can be M6, P6, MH, MLT or PH; "Y" can be C or K; and "ZZ" can be 30 or 36
Canadian Solar
Canadian Solar modules with 30, 32, 35 and 40 mm frames
CSbY-xxxZ
Where "b" can be 1, 3, 6, 6.1 or 7; "Y" can be H, K, L, N, P, R, U, V, W, X, Y, -54TM or -72TB; and "Z" can be
H, M, P, MS, PX , M-SD, P-AG, P-SD, MB-AG, PB-AG, MS-AG, MS-HL or MS-SD
CertainTeed
CertainTeed modules with 30, 35 and 40 mm frames
CTBBxxxYZZ-AA
Where "BB" can be blank or M10; "Y" can be M, P, or HC; "ZZ" can be 00, 01, 10, or 11; and "AA" can be 01,
02, 03, 04, 06, 08 or 09
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 24
MODULE COMPATIBILITY
Crossroads Solar
Crossroads Solar modules with 40 mm frames
Crossroads Solar xxx
CSUN
Csun modules with 35 and 40 mm frames
YYxxx-zzAbb
Where "YY" is CSUN or SST; "zz" is blank, 60, or 72; and "A" is blank, P, M or MM; "bb" is blank, BB, 5BB,
BW, or ROOF
Dehui
Dehui modules with 30, 35 and 40 mm frames
DH-MYYYZ-xxx
Where “YYY” can be 760, 772, 860, 872; and “Z” can be B, F or W
Ecosolargy
Ecosolargy modules with 35 and 40 mm frames
ECOxxxYzzA-bbD
Where “Y” can be A, H, S, or T; “zz” can be 125 or 156; “A” can be M or P; “bb” can be 60 or 72; and “D” can
be blank or B
Emmvee
Emmvee modules with 35 mm frames
Exxx-YYZZZ-A
Where "YY" can be M, P, HCM, HCMW, HCBG, HCBT; "ZZZ" can be 72, 120 or 144; and "A" can be blank or
B
ET Solar
(EliTe Solar)
ET Solar modules with 30, 35 and 40 mm frames
ET-YZZZxxxAA
Where "Y" can be P, L, M or N; "ZZZ" can be 660, 660BH, 672, 672BH, 754BH, 760BH, 766BH, 772BH,
760TBH, 766TBH or 772TBH; and "AA" can be GL, TB, TW, WB, WW, BB, WBG, WWG, WBAC, WBCO,
WWCO, WWBCO or BBAC
Flex
Flex modules with 35 and 40 mm frames
FXS-xxxYY-ZZ;
Where “YY” can be BB or BC; and “ZZ” can be MAA1B, MAA1W, MAB1W, SAA1B, SAA1W, SAC1B,
SAC1W, SAD1W, SBA1B, SBA1W, SBC1B, or SBC1W
Freedom Forever
Freedom Forever modules with 35 mm frames
FF-MPa-BBB-xxx
Where "a" can be blank or 1
Freevolt
Freevolt modules with 35 mm frames
ECP-PVGRAF-144HC-xxx
GCL
GCL modules with 35 mm and 40 mm frames
GCL-ab/YY xxx
Where “a” can be M or P; “b” can be 3 or 6; and “YY” can be 60, 72, 72H, or 72DH
GigaWatt Solar
Gigawatt modules with 40 mm frames
GWxxxYY
Where “YY” can be either PB or MB
Goldi
Goldi modules with 35 mm frames
GS10-Byyy-zz-xxx
Where "yyy" can be 108 or 144; and "zz" can be GF or TF
Grape Solar
Grape modules with 35 mm frames
GS-M120-xxx-FAB1
GreenWatts Solar
GreenWatts modules with 30 and 35mm frames
HSYY-A-xxx-ZZ
Where "YY" can be 54, 60, 66, 72 or 78; "A" can be blank or F; and "ZZ" can be MN or BOB
Hansol
Hansol modules with 35 and 40 mm frames
HSxxxYY-zz
Where “YY” can be PB, PD, PE, TB, TD, UB, UD, or UE; and “zz” can be AH2, AN1, AN3, AN4, HH2, HV1,
or JH2
Hanwa Solar
Hanwha Solar modules with 40 mm frames
HSLaaP6-YY-1-xxxZ
Where “aa” can be either 60 or 72; “YY” can be PA or PB; and “Z” can be blank or B
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 25
MODULE COMPATIBILITY
Hanwha Q CELLS
Hanwha Q CELLS Modules with 30, 32, 35, 40 mm frames
aaYY-ZZ-xxx
where "aa" can be Q. or B.; "YY" can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO, PEAK
DUO or TRON; and "ZZ" can be G3, G3.1, G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2,
L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1,
G4/SC, G4.1/SC, G4.1/TAA, G4.1/MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK G4.1/SC,
EC-G4.4, G5, G5/SC, G5/TS, BLK-G5, BLK-G5/SC, BLK-G5/TS, L-G5, L-G5.1, L-G5.2, L-G5.2/H, L-G5.3,
G6, G6/SC, G6/TS, G6+/TS, G6+, BLK-G6, L-G6, L-G6.1, L-G6.2, L-G6.3, G7, BLK-G6+, BLK-G6+/AC,
BLK-G6+/HL, BLK-G6+/SC, BLK-G6/TS, BLK-G6+/TS, BLK-G7, G7.2, G8, BLK-G8, G8+, BLK-G8+ L-G7,
L-G7.1, L-G7.2, L-G7.3, L-G8, L-G8.1, L-G8.2, L-G8.3, L-G8.3/BFF, L-G8.3/BFG, L-G8.3/BGT, M-G2+, BLK
M-G2+, ML-G9, BLK ML-G9, ML-G9+, BLK ML-G9+, BLK-G10, BLK-G10+, BLK G10+/AC, BLK-G10+/HL,
ML-G10, BLK ML-G10, ML-G10+, BLK ML-G10+, ML-G10.a, BLK ML-G10.a, ML-G10.a+, BLK ML-G10.
a+, BLK ML-G10 +/t, BLK ML-G10+/TS, XL-G2.3/BFG, XL-G9, XL-G9.2, XL-G9.3, XL-G9.3/BFG, XL-G10.2,
XL-G10.3, XL-G10.c, XL-G10.d, XL-G10.d/BFG, XL-G10.3/BFG, XL-G11.2, XL-G11.3, XL-G11.3/BFG or
XL-G11S.3/BFG
Heliene
Heliene modules with 35 and 40 mm frames
YYZZxxxA
Where "YY" can be 36, 60, 72, 96, 108, 120, 132, 144 or 156; "ZZ" can be HC, M, P, or MBLK; and "A" can
be blank, HomePV, Bifacial, M10-SL, M10-SL-BLK, M10 TPC SL, M10 Bifacial, M10 SL-Bifacial or M10 TPC
SL Bifacial
HT-SAAE
HT-SAAE modules with 35 and 40 mm frames
HTyy-aaaZ-xxx
Where "yy" can be 60, 66, 72 or 78, "aaa" can be 18, 156 or 166, "Z" can be M, P, M-C, P-C, M(S), M(VS),
M(V), P(V), M(V)-C, P(V)-C, or X
Hyperion Solar
(Runergy)
Hyperion modules with 30 and 35 mm frames
HY-DHzzzA8-xxxB
Where "zzz" can be 108 or 144; "A" can be N or P; and "B" can be blank or B
Hyundai
Hyundai modules with 32, 33, 35 and 40 mm frames
HiY-SxxxZZ
Where "Y" can be A, D or S; "S" can be M or S; and "ZZ" can be GI, HG, HI, KI, MI, MF, MG, OJ, PI, RI, RG,
RG(BF), RG(BK), SG, TI, TG, YH(BK) or XG(BK)
Itek
Itek Modules with 40 mm frames
IT-xxx-YY
Where “YY” can be blank, HE, or SE, or SE72
JA Solar
JA Solar modules with 30, 35 and 40 mm frames
JAyyzz-bbww-xxx/aa
Where “yy” can be M, P, M6 or P6; “zz” can be blank, (K), (L), (R), (V), (BK), (FA), (TG), (FA)(R), (L)(BK), (L)
(TG), (R)(BK), (R)(TG), (V)(BK), (BK)(TG), or (L)(BK)(TG); “bb” can be 48, 54, 60, 66, 72 or 78; "ww" can be
D09, D10, D20, D30, S01, S02, S03, S06, S09, S10, S12, S17, S20, S30 or S31; and “aa” can be BP, MB,
MR, SI, SC, PR, 3BB, 4BB, 4BB/RE, 5BB
Jakson Solar
Jakson Solar modules with 35mm frames
JH-xxxYY
Where "YY" can be BB or BT
Jinko
Jinko modules with 30, 35 and 40 mm frames
JKMYxxxZZ-aa
Where "Y" can either be blank or S; "ZZ" can be M, N, P, or PP; and "aa" can be blank, 54HL4-B, 60,
60B, 60H, 60L, 60BL, 60HL, 60HB, 60HBL, 6HBL-EP, 60-J4, 60B-J4, 60B-EP, 60(Plus), 60-V, 60-MX,
6RL3, 6RL3-B, 6TL3-B, 7RL3-V, 7RL3-TV, 72, 72B, 72-J4, 72B-J4, 72(Plus), 72-V, 72H-V, 72L-V, 72HL-V,
72HBL-V, 72HL4-V, 72HL4-BDV, 72HL4-TV, 72-MX, 72H-BDVP, 72HL-TV, or 72HL-V-MX3
KB Solar
KB Solar modules with 35 mm frames
KBS-xxx-Mono-YY
Where "YY" can be blank or BF
Kyocera
Kyocera Modules
KYxxxZZ-AA
Where “Y” can be D or U; “ZZ” can be blank, GX, or SX; and “AA” can be LPU, LFU, UPU, LPS, LPB, LFB,
LFBS, LFB2, LPB2, 3AC, 3BC, 3FC, 4AC, 4BC, 4FC, 4UC, 5AC, 5BC, 5FC, 5UC, 6BC, 6FC, 8BC, 6MCA, or
6MPA
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 26
MODULE COMPATIBILITY
LA Solar
LA Solar modules with 35 mm frames
LSxxxYY
Where "YY" can be BF, BL, BLA, HC or ST
LG
LG modules with 35 and 40 mm frames
LGxxxYaZ-bb
Where "Y" can be A, E, M, N, Q, S; "a" can be A, 1, 2 or 3 "Z" can be C, K, T, or W; and "bb" can be A3, A5,
A6, B3, B6, E6, E6.AW5, G3, G4, J5, K4, L5, N5, V5, V6
Longi
Longi modules with 30, 35 and 40 mm frames
LRa-YYZZ-xxxM
Where "a" can be 4, 5, 6 or 7; "YY" can be blank, 54, 60, 66, or 72; and "ZZ" can be blank, BK, BP, HV, PB,
PE, PH, HBD, HGD, HIB, HIH, HPB, HPH, HIBD, HABB or HABD
Maxeon
Maxeon modules with 35, 40 and 46 mm frames
SPR-AAAY-xxx-zzz
Where "AAA" can be MAX, P or X; "Y" can be 3, 5, 6, 21 or 22; and "zzz" can be R, BLK, BLK-R, COM or
UPP
Meyer Burger
Meyer Burger Modules with 35 mm frames
Meyer Burger Black, White or Glass
Mission Solar
(mSolar)
Mission Solar modules with 30, 33, 35 and 40 mm frames
YYYbb-xxxZZaa
Where "YYY" can be MSI, MSE, TXI or TXS; "bb" can be blank, 6, 10 or 60A; "ZZ" can be blank, HN, HT,
MM, SE, SO, SQ , SR, SX, TS, 108, 120 or 144; and "aa" can be blank, 0B, 2B, BB, BW, 1J, 4G, 4J, 4S, 5K,
5R, 5T, 60, 6J, 6S, 6W, 6Z, 8K, 8T, 9R, 9S or 9Z
Mitrex
Mitrex modules with 30 and 40 mm frames
Mxxx-XYZ
Where "X" can be A, B, I or L; "Y" can be 1 or 3; and "Z" can be F or H
Mitsubishi
Mitsubishi modules
PV-MYYxxxZZ
Where “YY” can be LE or JE; and “ZZ” can be either HD, HD2, or FB
Moltech IM and XS series modules with 40 mm frames
Navitas
Navitas Modules with 35 mm frames
NSMxxx-yyy
Where "yyy" can be 120, 132 or 144
Next Energy Alliance
Next Energy Alliance modules with 35 and 40 mm frames
yyNEA-xxxZZ
where “yy” can be blank or US; “ZZ” can be M, MB or M-60
NE Solar
NE Solar modules with 30, 35 and 40 mm frames
NESExxx-zzAAX-yy
Where "zz" can be 54, 60 or 72; "AA" can be MH or TH; "X" can be blank or B; and "yy" can be M6 or M10
Neo Solar Power
Neo Solar Power modules with 35 mm frames
D6YxxxZZaa
Where “Y” can be M or P; “ZZ” can be B3A, B4A, E3A, E4A, H3A, H4A; and “aa” can be blank, (TF), ME or
ME (TF)
Panasonic (HIT)
Panasonic modules with 35 and 40 mm frames
VBHNxxxYYzzA
Where “YY” can be either KA, RA, SA or ZA; “zz” can be either 01, 02, 03, 04, 06, 06B, 11, 11B, 15, 15B, 16,
16B, 17, or 18; and “A” can be blank, E, G, or N
Panasonic (EverVolt)
Panasonic modules with 30 mm frames
EVPVxxxA
Where "A" can be blank or H, K, HK, HK2 or PK
Peimar
Peimar modules with 40 mm frames
SbxxxYzz
Where “b” can be G, M or P; “Y” can be M or P; and “zz” can be blank, (BF) or (FB)
Philadelphia Solar
Philadelphia modules with 30, 35 and 40 mm frames
PS-YzzAA-xxxW
Where "Y" can be M, MNB, MNG or P; "zz" can be 60, 72, 108 or 144; "AA" can be blank, (BF), (HC),
(HCBF) or (HCBF)-GG; and "W" can be blank or W
MODULE COMPATIBILITY
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 27
Phono Solar
Phono Solar modules with 30, 35 and 40 mm frames
PSxxxY-ZZ/A
Where "Y" can be M, M1, MH, M1H, M4, M4H, M5GF, M5GFH, M6, M6H, M8, M8H, M8GF, M8GFH or P;
"ZZ" can be 18, 20 or 24; and "A" can be F, T, TH, THB, TNH, U, UH, UHB, VH or VHB
Prism Solar
Prism Solar modules with 35 mm frames
PST-xxxW-M72Y
Where "Y" can be H, HB or HBI
Rayzon Solar
Rayzon Solar modules with 35 and 40 mm frames
RSYxxxWC
Where "Y" can be blank or B
Recom
Recom modules with 35 and 40 mm frames
RCM-xxx-6yy
Where “yy” can be MA, MB, ME or MF
REC Solar
REC modules with 30 and 38 mm frames
RECxxxYYZZ
Where “YY” can be AA, M, NP, NP2, NP3, PE, PE72, TP, TP2, TP2M, TP2SM, TP2S, TP3M or TP4; and “ZZ”
can be blank, Black, BLK, BLK2, SLV, 72, Pro M, Pure, Pure-R, Pure-RX or Pure 2
Renesola
ReneSola modules with 35 and 40 mm frames
AAxxxY-ZZ
Where "AA" can be SPM(SLP) or JC; "Y" can be blank, F, M or S; and "ZZ" can be blank, Ab, Ab-b, Abh,
Abh-b, Abv, Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, Db-b, or 24/Bb
Renogy
Renogy Modules with 35 and 40 mm frames
RZZ-xxxY-AAA
Where "ZZ" can be NG or SP; "Y" can be D or P; and "AAA" can be blank, 144, BB-108, BB-120 or BK-120
Risen
Risen Modules with 30, 35 and 40 mm frames
RSMyy-a-xxxZZ
Where "yy" can be 60, 72, 110, 120, 132 or 144; "a" can be 6, 7 or 8; and "ZZ" can be M, P or BMDG
Saatvik
Saatvik Modules with 35 mm frames
SGExxx-YYYZZZ
Where "YYY" can be 108 or 144; and "ZZZ" can be MHC, MBHC or MHCB
S-Energy
S-Energy modules with 35 and 40 mm frames
SABB-CCYYY-xxxZ
Where “A” can be C, D, L or N; “BB” can be blank, 20, 25, 40 or 45; “CC” can be blank, 60 or 72; “YYY” can
be blank, BDE, MAE, MAI, MBE, MBI, MCE or MCI; and “Z” can be V, M-10, P-10 or P-15
SEG Solar
SEG Solar with 30, 35 and 40 mm frames
SEG-aYY-xxxZZ
Where "a" can be blank, 6 or B; "YY" can be blank, MA, MB, PA, or PB; and "ZZ" can be blank, BB, BG, BW,
HV, WB, WW, BMB, BMA-HV, BMA-BG, BMA-TB, BMB-TB, BMB-HV, BMD-HV, BMB-BG, BTA-BG or BMD-
TB
Seraphim USA
Seraphim modules with 30, 35 and 40 mm frames
SRP-xxx-YYY-ZZ
Where "xxx" is the module power rating; and "YYY" can be BMA, BMD, 6MA, 6MB, 6PA, 6PB, 6QA-XX-XX,
and 6QB-XX-XX; ZZ is blank, BB, BG or HV
Sharp
Sharp modules with 35 and 40 mm frames
NUYYxxx
Where “YY” can be SA or SC
Shinsung E&G
Shinsung Modules with 35 mm frames
SSVxxx-144MH
Silfab
Silfab Modules with 35 and 38 mm frames
SYY-Z-xxxAb
Where "YY" can be IL, SA, LA, SG or LG; "Z" can be blank, M, P, or X; "A" can be blank, B, H, M, N or Q; and
"b" can be A, C, C+, D, G, K, L, M, N, T, U or X
MODULE COMPATIBILITY
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 28
Sirius PV
Sirius PV Modules with 35 mm frames
ELNSMzzM-HC-xxx
Where "zz" can be 54 or 72
Solar4America
Solar4America modules with 30, 35 and 40 mm frames
S4Axxx-YYzzAA
Where "YY" can be 60, 72, 108 or 144; "zz" can be MH5 or MH10; and "AA" can be blank or BB, BW, SW or
STT
Solarever
Solarever modules with 30, 35 mm frames
SE-zzz*yy-xxxM-aaa
Where "zzz" can be 166 or 182; "yy" can be 83 or 91; and "aaa" can be 108, 144 or 144N
Solaria
Solaria modules with 35 and 40 mm frames
PowerA-xxxY-ZZ
Where "A" can be X or XT, "Y" can be R or C; and "ZZ" can be blank, AC, BD, BX, BY, PD, PL, PM, PM-AC,
PX, PZ, WX, WZ or 4T
Solarcity (Tesla)
Solarcity modules with 40 mm frames
SCxxxYY
Where “YY” can be blank, B1 or B2
SolarTech
SolarTech modules with 40 mm frames
AAA-xxxYY
Where "AAA" can be PERCB-B, PERCB-W, HJTB-B, HJTB-W or STU; "YY" can be blank, PERC or HJT
SolarWorld AG
SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed by mono, poly, duo, black, bk, or
clear; modules with 31 and 33 mm frames
SW-xxx
SolarWorld Americas
SolarWorld Sunmodule Plus, Protect, Bisun, XL, Bisun XL, may be followed by mono, poly, duo, black, bk, or
clear; modules with 33 mm frames
SWA-xxx
Sonali
Sonali Modules with 35 and 40 mm frames
SS-M-xxx
Where "M" can be blank or M
Star Solar
Star Solar modules with 35 mm frames
Star-xxxW-YYY-ZZZ
Where "YYY" can be M60H or M60HB; and "ZZZ" can be blank or M10
Stion
Stion Thin lm modules with 35 mm frames
STO-xxx or STO-xxxA
SunEdison
SunEdison Modules with 35 and 40 mm frames
SE-YxxxZABCDE
Where "Y" can be B, F, H, P, R, or Z; "Z" can be 0 or 4; "A" can be B,C,D,E,H,I,J,K,L,M, or N ; "B" can be B or
W; "C" can be A or C; "D" can be 3, 7, 8, or 9; and "E" can be 0, 1 or 2
Suniva
Suniva modules with 35, 38 and 40 mm frames
OPTxxx-AA-B-YYY-Z
MVXxxx-AA-B-YYY-Z
Where "AA" is either 60 or 72; "B" is either 4 or 5; "YYY" is either 100,101,700,1B0, or 1B1; and "Z" is blank
or B
Sunmac Solar
Sunmac modules with 30 and 35 mm frames
SMxxxMaaaZZ-YY
Where "aaa" can be 660, 754 or 772; "ZZ" can be NH or SH; and "YY" can be BB or TB
Sunpower
Sunpower standard (G3 or G4) or InvisiMount (G5) 35, 40 and 46 mm frames
SPR-Zb-xxx-YY
Where "Z" can be A, E, M, P or X; “b” can be blank, 17, 18, 19, 20, 21, or 22; and “YY” can be blank, BLK,
COM, C-AC, D-AC, E-AC, BLK-E-AC, G-AC, BLK-G-AC, H-AC, BLK-H-AC, BLK-C-AC, or BLK-D-AC
MODULE COMPATIBILITY
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 29
Sunspark
Sunspark modules with 40 mm frames
SYY-xxxZ-A
Where “YY” can be MX or ST; and “Z” can be M, MB, M3, M3B, P or W; and "A" can be 60 or 72
Suntech
Suntech modules with 35 and 40 mm frames
STPxxxy-zz/aa
Where "y" is blank or S; and "zz" can be 20, 24, A60, A72U, B60 or B72; and "aa" can be Vd, Vem, Vfw, Vfh,
Vnh, Wdb, Wde, Wd, Wfhb or Wnhb
Talesun
Talesun modules with 30, 35 and 40 mm frames
TAByZZaa-xxx-b
Where "A" can be D, M or P; "B" can be 3, 6, 7 or 9; "y" can be blank, F, G, H, I or L; "ZZ" can be 54, 60, 66,
72 or 78; "aa" can be M, M(H), or P; and "b" can be blank, B, T, or (H)
Tesla
Tesla modules with 40 mm frames
TxxxY
Where "Y" can be H or S
Thornova
Thornova Modules with 30 and 35 mm frames
TS-YYZZ(xxx)-X
Where "YY" can be BB, BG or BGT; "ZZ" can be 54, 60 or 72; and "X" can be blank or X
Trina
Trina Modules with 30, 35 and 40 mm frames
TSM-xxxYYZZ
Where "YY" can be DD05, DD06, DD14, DE14, DE15, DE15V, DEG15, DEG15VC, DE18M, DEG18MC,
DE09, DE19, DEG19C.20, DE06X, PA05, PC05, PD05, PD06, PA14, PC14, PD14, PE14, PE15, NEG19RC
or NE09RC ; and "ZZ" can be blank, .05, .05(II), .08, .08(II), .10, .18, .08D, .18D, 0.82, .002, .00S, 05S,
08S, .20, .20(II), A, A.05, A.08, A.10, A.18, (II), A(II), A.05(II), A.08(II), A.082(II), A.10(II), A.18(II), C.05, C.07,
C.05(II), C.07(II), H, H(II), H.05(II), H.08(II), HC.20(II), HC.20(II), M, M(II), M.05(II), MC.20(II)
Universal
Universal Solar modules with 35 mm frames
UNI-xxx-yyyZZZ-aa
Where "yyy" can be 108, 120 or 144; "ZZZ" can be M, MH, BMH; and "aa" can be blank, BB or DG
URE
URE modules with 35 mm frames
DyZxxxaa
Where "D" can be D or F, "y" can be A, B, 6 or 7; "Z" can be F, K, L or M; and "aa" can be B8G, BFG, BFG-
BB, C8G, DFG-BB, H3A, H4A, H8A, L4A, E7G-BB, E8G, E8G-BB, MFG, MFG-BB or M7G-BB
Vikram
Vikram solar modules with 30, 35 and 40 mm frames
XVSyy.ZZ.AAA.bb
Where "X" can be blank, Hypersol, Paradea, Prexos or Somera; "yy" can be M, P, MBB, MDH, MDHT, MH,
MS, MHBB, or PBB; "ZZ" can be 54, 60, 72 or 78; "AAA" is the module power rating; and "bb" can be 03, 04
or 05
VSUN
VSUN modules with 30, 35 and 40 mm frames
VSUNxxxA-YYz-aa
Where "A" can be blank or N; "YY" can be 60, 72, 108, 120, 132, 144; "z" can be M, P, MH, PH, or BMH; and
"aa" can be blank, BB, BW, or DG
Waaree
Waaree modules with 35 and 40 mm frames
AAyy-xxx
Where "AA" canbe WS or Bi; and "yy" can be blank, M, MB, MD, MDI, MDIB, 33, 55, 57 or 66
Winaico
Winaico modules with 35 and 40 mm frames
Wsy-xxxZa
Where "y" can be either P or T; "Z" can be either M, P, or MX; and "a" can be blank or 6
MODULE COMPATIBILITY
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 30
Yingli
Yingli modules with 30, 35 and 40 mm frames
YLxxxZ-yy
Where "Z" can be D or P; "yy" can be blank, 29b, 30b, 34d, 35b, 36b, 37e 1/2, 37e 1500V 1/2, 40d, 49e 1/2
or 49e 1500V 1/2
Yotta
Yotta modules with 30 and 35 mm frames
YSM-Bxxx-ZZ-72-1
Where "ZZ" can be 06 or 10
Zeus
Zeus Solar Modules with 40 mm frames
ZxxxM-HB
ZN Shine
ZN Shine modules with 30 and 35 mm frames
ZXMY-AAA-xxx/M
Where "Y" can be 6, 7 or 8; "AAA" can be 72, NH120, NH144, NHDB144, NHLDD144, SH108, SH144,
SHDB144, SHLDD144, TP120 or UHLDD144; and "M" can be M or N
MODULE COMPATIBILITY
©
2024 IRONRIDGE, INC. VERSION 4.3 XR FLUSH MOUNT INSTALLATION MANUAL - 31
MAKE MODELS
FRAMELESS MODULE LIST
Astronergy Solar
Astronergy frameless modules
CHSM6610P(DG)-xxx
Canadian Solar
Canadian Solar frameless modules
CSbY-xxx-Z
Where “b” can be 3 or 6; “Y” is K, P, U, or X; and “Z” can be M-FG, MS-FG, P-FG, MB-FG, or PB-FG
Heliene
Heliene frameless modules
YYZZxxxA
Where "YY" can be72; "ZZ" can be M; and "A" can be GH
Jinko
Jinko frameless modules
JKMxxxPP-DV
Prism Solar
Prism Solar frameless modules
BZYY-xxxAAA
Where "Z" can be i or N; "YY" can be 48, 60, 60S, 72 or 72S; and "AAA" can be blank or BSTC
Risen
Risen frameless modules
RSMyy-6-xxxZZ
Where “yy” can be 60, 72, 120 or 144; and “ZZ” can be MDG or PDG
Stion
Stion frameless modules
STL-xxx or STL-xxxA
Sunpreme
Sunpreme frameless modules
GXB-xxxYY
Where “YY” can be blank or SL
Trina
Trina frameless modules
TSM-xxxYY
Where “YY” can be either DEG5(II), DEG5.07(II), DEG5.40(II), DEG5.47(II), DEG14(II), DEG14C(II),
DEG14C.07(II), DEG14.40(II), PEG5, PEG5.07, PEG5.40, PEG5.47, PEG14, or PEG14.40